| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.4 LAdmitted-Fee/PreQual/Technical/Finance AT BANDHA PATHAR PO SARASARA DIST BOUDH PIN 762026 | BOUDH | BOUDH | ODISHA | 762026 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹20.1 L+₹67,049.34 (3.46%)Admitted-Fee/PreQual/Technical/Finance AT WORDNO 15 PS BOUCH TOAN DIST BOUCH PIN 762014 | BOUDH | ODISHA | 762014 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹21.3 L+₹1.9 L (9.67%)Admitted-Fee/PreQual/Technical/Finance AT KEUTA SAHI P O BOUDH P S G BOUDH DISTRICT BOUDH ODISHA PIN NO 762014 | BOUDH | ODISHA | 762014 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹22.2 L+₹2.8 L (14.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹23.5 L+₹4.1 L (21.2%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹27.7 L
EMD Value
₹27,800
Closing Date
8 Oct 2026, 5:00 pmClosed
SUPERINTENDING ENGINEER
ROADS AND BUILDING DIVISION, BOUDH
Construction of (02) two numbers of class room at Agro-Polytechnics, Boudh
2026_EICCL_142087_1
SE (R and B)-BDH-10/2026-27
Open Tender
Civil Works - Buildings
Percentage
120 days
Boudh
2 documents required · 2 mandatory
₹6,000
₹27,800
Yes
9 Oct 2026
30 Sept 2026
9 Oct 2026
30 Sept 2026
8 Oct 2026
30 Sept 2026
30 Sept 2026 - 8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 98.1 | sqm | 8.63 | ₹846.6 |
| 2 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. | 45.09 | cum | 282.89 | ₹12,755.51 |
| 3 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-In-charge. | 30.06 | cum | 157.16 | ₹4,724.23 |
| 4 | Exavation in soil with hydraculic exavator of 0.9 cum bucket capacityincluding cutting and loading in tippers trimming bottom and side slope with all cost etc, complete. and deposting the excavated materials away from work site as directed by Engineer in charge. | 15.03 | cum | 74.84 | ₹1,124.85 |
| 5 | Supplying, filling in foundation & plinth with sand in layers including watering and ramming with cost conveyance, royalities, taxes of all materials and labour with T&P required for the work etc. complete | 57.86 | cum | 662.04 | ₹38,305.63 |
| 6 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6") thick to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete as per direction of the Engineer-in-charge. | 16.67 | cum | 6,088.41 | ₹1,01,493.79 |
| 7 | Fly Ash brick masonary in Cement Mortar (1:6) in foundation & Plinth using-Fly Ash.-brick of 25cm X 12cm X 8cm size having a crushing strength in between 75kg to 100 kg per Sq.cm with dimensional tolerance ± 8% including splays cutting circular moulding chamfering & corbelling watering and curring for 7days after immersing the bricks in water for six hours before use etc. complete including cost & conveyance of all materials & labour required for the work with all taxes & royalties with all T&P & cess etc., complete in all respect as per the direction of Engineer-in-charge. | 9.62 | cum | 5,669.19 | ₹54,537.61 |
| 8 | Fly Ash. brick masonry of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with approved grade cement and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | 44.08 | cum | 5,707.53 | ₹2,51,587.92 |
| 9 | Reinforced Cement concrete M-20 grade in different works using 20mm & down graded size HBG Crusher broken chips including cost, conveyance, royalities,taxes of all material, labour and T&P require for the work etc. complete as directed by E.I.C. And including cost of centering & shuttering ETC.
Foundation | 20.39 | cum | 6,488.87 | ₹1,32,308.06 |
| 10 | Grade Beam | 6.52 | cum | 7,364.57 | ₹48,017 |
stage.html
html • 0.02 MB
finance_611482.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
Tendernotice_2.pdf
PDF • 8.32 MB
BOQ_611482.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .