| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC STREET NO 3 W NO 16 SUBHASH NAGAR GIDDERBAHA DISTT SRI MUKTSAR SAHIB 152101 PUNJAB | SRI MUKTSAR SAHIB | PUNJAB | 152101 | ₹5.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.6 Cr+₹51.3 L (10.0%)Rejected-AOC | ₹5.6 Cr+₹51.3 L (10.0%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.8 Cr+₹66.8 L (13.1%)Rejected-AOC NEAR DD FORT CANAL REST HOUSE ROAD MANSA | BATHINDA | PUNJAB | 151302 | ₹5.8 Cr+₹66.8 L (13.1%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | RAJ KUMAR CONTRACTOR L1 | G & G CONTRACTORS L3 | M/S R.S. INFRA L2 |
|---|---|---|---|---|---|---|
| 1.00 | Jungle clearance on running canals and branches, and drains with discharge more than 9 Cum/s. (iii) Heavy type | 0.3 | km | 2,718.3 ₹2,718.3 Lowest | 3,600 ₹3,600 | 3,398.1 ₹3,398.1 |
| 2.00 | Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (For X-Bundh) | 614.98 | cum | 38,128.76 ₹38,128.76 Lowest | 47,968.44 ₹47,968.44 | 44,278.56 ₹44,278.56 |
| 3.00 | Excavation in soil (any type) using hydraulic excavator CK
90 excavation with hydaulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes,in accordance with requirements of lines grades and X-sections including all lifts and combined leads upto
30 mtr.item no 6.19 | 2,592.96 | cum | 1,08,904.32 ₹1,08,904.32 Lowest | 1,19,276.16 ₹1,19,276.16 | 1,08,904.32 ₹1,08,904.32 Lowest |
| 4.00 | Dismantling cement concrete 1:3:6 coping on left and right side bank of Rajasthan Feeder including loading & unloading, carriage and disposal of dismantled material with all leads & lifts. | 40.35 | cum | 41,479.8 ₹41,479.8 Lowest | 49,428.75 ₹49,428.75 | 49,670.85 ₹49,670.85 |
| 5.00 | Dismantling existing tile lining on side slopes and bed of Rajasthan Feeder including loading, unloading, carriage and disposal of dismantled materials with all leads and lifts. | 2,765.57 | cum | 22,84,360.82 ₹22,84,360.82 | 14,32,565.26 ₹14,32,565.26 Lowest | 19,85,679.26 ₹19,85,679.26 |
| 6.00 | Silt clearance and debris of channels undressed and disposal of the same complete in all respect, as per instructions of the Engineer incharge including all leads & lifts, loading & unloading at proper place to be arranged by the agency/contractor himself. | 5,755 | cum | 4,31,625 ₹4,31,625 | 4,14,360 ₹4,14,360 | 46,040 ₹46,040 Lowest |
| 7.00 | Rehandling of earth work with average lead 15 mtr complete in all respect, as per instruction of the engineer incharge. The work maye be executed manually or by machinery. | 404 | cum | 13,736 ₹13,736 Lowest | 19,392 ₹19,392 | 14,140 ₹14,140 |
| 8.00 | Extra for dressing of earth work complete in all respect, as per drawings, design, specifications & the instructions of the Engineer in charge. | 10,406.2 | sqm | 10,406.2 ₹10,406.2 Lowest | 20,812.4 ₹20,812.4 | 10,406.2 ₹10,406.2 Lowest |
| 9.00 | Extra for dressing of Dowel complete in all respect, as per drawings, design, specifications & the instructions of the Engineer in charge. | 609.61 | M | 3,048.05 ₹3,048.05 Lowest | 4,267.27 ₹4,267.27 | 3,048.05 ₹3,048.05 Lowest |
| 10.00 | Extra for laying earth as per specifications for compaction in 200 mm layers & compacted to about 150 mm, watering, rolling and compaction to achieve maximum DBD of 98% at optimum moisture content including dressing complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. | 5,280 | cum | 5,22,720 ₹5,22,720 Lowest | 6,86,400 ₹6,86,400 | 6,23,040 ₹6,23,040 |
Tender Value
₹499.1 Cr
EMD Value
₹10.0 L
Closing Date
3 Feb 2026, 11:00 amClosed
Executive Engineer
Executive Engineer
Relining of Rajasthan Feeder from RD 219000-220000
2025_WR_152746_9
8502
Open Tender
Civil Works
Item Wise
Faridkot
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Yes
₹10.0 L
Yes
16 Apr 2026
22 Jan 2026
3 Feb 2026
22 Jan 2026
3 Feb 2026
22 Jan 2026
Jungle clearance on running canals and branches, and drains with discharge more than 9 Cum/s. (iii) Heavy type
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (For X-Bundh)
Excavation in soil (any type) using hydraulic excavator CK 90 excavation with hydaulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes,in accordance with requirements of lines grades and X-sections including all lifts and combined leads upto 30 mtr.item no 6.19
Dismantling cement concrete 1:3:6 coping on left and right side bank of Rajasthan Feeder including loading & unloading, carriage and disposal of dismantled material with all leads & lifts.
Dismantling existing tile lining on side slopes and bed of Rajasthan Feeder including loading, unloading, carriage and disposal of dismantled materials with all leads and lifts.
Silt clearance and debris of channels undressed and disposal of the same complete in all respect, as per instructions of the Engineer incharge including all leads & lifts, loading & unloading at proper place to be arranged by the agency/contractor himself.
Rehandling of earth work with average lead 15 mtr complete in all respect, as per instruction of the engineer incharge. The work maye be executed manually or by machinery.
Extra for dressing of earth work complete in all respect, as per drawings, design, specifications & the instructions of the Engineer in charge.
Extra for dressing of Dowel complete in all respect, as per drawings, design, specifications & the instructions of the Engineer in charge.
Extra for laying earth as per specifications for compaction in 200 mm layers & compacted to about 150 mm, watering, rolling and compaction to achieve maximum DBD of 98% at optimum moisture content including dressing complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge.
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing complete in all respect, as per instruction of Engineer in charge .i)Depth 0 to 1.50 meters.
ii) Depth exceeding 1.50 meters But up to 3.00 meters.
iii) Depth exceeding 3.00 meters. But up to 4.50 meters.
iv) Depth exceeding 4.50 meters But up to 6.00 meters.
v) Depth exceeding 6.00 meters But up to 7.50 meters.
Dressing and preparation of sub grade (in earthwork) for lining complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. (i) Bed
ii) Side Slopes
Supply and laying first layer of graded filter with coarse sand, F.M. 1.5 or above against sub grade or in damaged portion/patch including loading, unloading and carriage of coarse sand from approved quarry, grading of material and compaction in bed, side slopes etc. complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. (II) Side Slopes
Supply and laying second layer of filter material with graded gravel 5 to 20 mm including loading, unloading and carriage of material from approved quarry, grading of material and compaction in bed, side slopes etc. complete in all respect as per drawings, design, specifications & the instructions of the Engineer incharge. Sides Slopes
Supply and laying of HDPE textured for Side slopes 750 Micron thickness as approved by Engineer incharge, pasting on both faces, including laying in position, anchorage, carriage to site, jointing/welding, spraying of cement slurry etc. complete in all respect, as per drawings, design, specifications and instructions of the Engineer incharge .
Supply and laying of HDPE Geo membrane for Bed 750 Micron thickness as approved by Engineer incharge, pasting on both faces, including laying in position, anchorage, carriage to site, jointing/welding, spraying of cement slurry etc. complete in all respect, as per drawings, design, specifications and instructions of the Engineer incharge .
Supply of PVC water stop 150 x 10 mm for use in construction joints, complete in all respects as per drawings, design, specifications and the instructions of the Engineer in charge.
Supply and fixing in bed PVC Pressure Relief valve in plate & socket type design having zero backwater leakages with housing pipe of nominal outer dia 160 mm (working presure 0.4 MPa), having length of 430 mm and strainer pipe of nomial dia 110mm (working presure 0.6 MPa), complete in all respect as per design, drawing & specifications & the instructions of the Engineer incharge.
Providing and laying in position design mix concrete M-15 grade using minimum cement content as specified in IS 456: 2000, manufactured in fully automatic batching plant and transported to site of work in transit mixer having continuous agitated mixer, manufactured as per mix design of specified grade and laying the same with mechanical concrete paver or by other means(wherever laying of concrete with paver is not possible) for cement concrete lining 150 mm thick including cost of admixtures in recommended proportions as per IS-9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability including cost of cutting grooves and inserting PVC water stop seals (excluding cost of PVC seals), supply and application of primer for joints, supply, carriage, all leads and lifts, loading and unloading of all materials, curing, complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge.In Bed & Curved Portion 0 to 2.0 mtr height.
ii) In side slopes from 2 to 3.50 Mtr Height.
iii) In side slopes from 3.50 Mtr. to 5.50 Mtr Height.
iii) In side slopes from 5.50 Mtr. to 7.50 Mtr Height.
Providing and laying in position design mix concrete M-15 grade using minimum cement content as specified in IS 456: 2000, manufactured in fully automatic batching plant and transported to site of work in transit mixer having continuous agitated mixer, manufactured as per mix design of specified grade and laying the same with mechanical concrete paver or by other means(wherever laying of concrete with paver is not possible) for cement concrete lining 150 mm thick including cost of admixtures in recommended proportions as per IS-9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability including cost of cutting grooves and inserting PVC water stop seals ( excluding cost of PVC seals) supply and application of primer for joints, supply, carriage, all leads and lifts, loading and unloading of all materials, curing, complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge.Coping
Manufacturing and laying on bed, sides & curved portion, precast cement concrete sleepers of M-15 concrete, 225 mm wide & 110 mm thick and upto 600 mm length including supply, carriage, all leads and lifts, loading and unloading of all materials, curing, complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge. for making sleepers ( taken progress of one day =100 m)
Providing Tractor 24 H.P. for running 4” x 4” pumping set for open dewatering
Providing and fixing distance marks complete in all respect, as per drawings, design, specifications & the instructions of the Engineer in charge.
Supply and fixing in side slopes PVC Pressure Relief valve in plate & socket type design having zero backwater leakages with housing pipe of nominal outer dia 160 mm (working presure 0.4 MPa), having length of 750 mm and strainer pipe of nominal outer dia 110mm (working presure 0.6 MPa), complete in all respect as per design, drawing & specifications & the instructions of the Engineer incharge.The rate shall be inclusive of dismantling existing lining(if required), excavation of PRV side pocket and disposal of dismantled material/earth with all leads and lifts, supply, carriage, loading & unloading, laying & compaction etc. of filter material consisting of sand and gravels complete in all respect as per drawings, design, specifications & the instructions of the Engineer incharge. (@ 10 m ( 33’ ) apart on both sides of the channel in Pockets )
Making drainage arrangements behind lining by excavating longitudinal side drains of trapezoidal section in the bed of channel and disposal of earth with all leads & lifts loading & unloading, dressing the bottom and sides of the drain, and the items given below complete in all respects as per drawings, design, specifications & the instructions of the Engineer incharge
Making Drainage arrangements behind lining by excavating transverse drains of trapezoidal section in the bed of channel and disposal of earth with all leads & lifts loading &unloading dressing the bottom and sides of the drain and the items given below complete in all respects as per drawings design specification & the instructions of the Engineer incharge.
Constructing rain water drain on both sides of common bank with mixed concrete M-15 using cement content not less than minimum cement as specified in IS 456:2000, manufactured in fully automatic batching plant & transported to site of work in transit mixer having continuous agitated mixer, manufactured as per mix design of specified grade i/c cost of admixtures in recommended proportions as per IS-9103 to accelerate/ retard setting of concrete, improve workability without impairing strength & durability i/c supply, carriage, all leads & lifts, loading & unloading, curing, dismantling of existing drains wherever required, excavation of earth & disposal of earth & dismantled material with all leads & lifts at disposal site to be arranged by agency himself complete in all respect, as per drawings, design, specifications & the instructions of the Engineer incharge..
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (For filling)
Filling expansion joints with special impervious hot pour 12.5mm wide.
Providing safety ladders on side slopes of lining in cement concrete M-15 including fixing iron rungs 25 mm diameter of steel having anti corrosive properties supported with 10 mm dia longitudinal bars dismantling of existing lining excavation of earth and disposal of earth and dismantled material with all leads and lifts at disposal site to be arranged by agency himself
Making dewatering arrangements inclusive of running, operation and maintenance of equipment to provide dry condition at working place for lining longitudinal or transverse drain etc & provision of digging and filling of drains for disposal of water as per the instructions of the Engineer incharge.
Any other item
stage.html
html • 0.04 MB
techsummary_321261.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
Tendernotice_2.pdf
PDF • 1.66 MB
Tendernotice_3.pdf
PDF • 31.19 MB
BOQ_321261.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .