Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.3 L+₹5,453 (1.70%)Admitted-Finance | ₹3.3 L+₹5,453 (1.70%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shri Pankaj Roy L2 | Rising Construction Co-Operative Society Ltd L1 |
|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | All kinds of soil. | 17.55 | cum | 400 ₹7,020 | 330 ₹5,791.5 Lowest |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 13 | cum | 350 ₹4,550 | 250 ₹3,250 Lowest |
| 3.00Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : | |||||
| 3.01 | 1:3:6 (1 Cement : 3 coarse sand (zone III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). | 16.58 | cum | 15,500 ₹2,56,990 | 15,000 ₹2,48,700 Lowest |
| 4.00Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 4.01 | Foundations, footings, bases of columns, etc. for mass concrete | 20.85 | sqm | 450 ₹9,382.5 | 380 ₹7,923 Lowest |
| 5.00 | Extra for making chequers of approved pattern on cement concrete floors, steps, landing, pavements etc. | 97.5 | sqm | 50 ₹4,875 Lowest | 80 ₹7,800 |
| 6.0012 mm cement plaster of mix : | |||||
| 6.01 | 1:4 (1 cement: 4 fine sand) | 97.5 | sqm | 450 ₹43,875 Lowest | 490 ₹47,775 |
Tender Value
₹3.2 L
EMD Value
₹6,434
Closing Date
3 Jul 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer (PRI) South Andaman Division-I No. J/4, Old Councilor Bungalow, Junglighat, Sri Vijaya Puram, South Andaman
Construction of CC Footpath from main road to Krishna Sarkar house via Teja Sarkar house at Govind Nagar Ward No. 02 under Gram Panchayat Govind Nagar, Swaraj Dweep. (Re-Tender)
2026_RDPRI_23471_1
EE/PRI/SAD-I/GEN/26-27/25
Open Tender
Civil Works - Others
Works
60 days
Govind Nagar, Swaraj Dweep
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer, GPPS
₹6,434
7 Jul 2026
24 Jun 2026
3 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | All kinds of soil. | - | cum | - | - |
| 2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | |||||
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : | |||||
| 3.01 | 1:3:6 (1 Cement : 3 coarse sand (zone III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). | 1 | cum | - | - |
| 4Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 4.01 | Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | - | - |
| 5Extra for making chequers of approved pattern on cement concrete floors, steps, landing, pavements etc. | |||||
| 612 mm cement plaster of mix : | |||||
| 6.01 | 1:4 (1 cement: 4 fine sand) | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Document.pdf
Tender Documents • 1.91 MB
BOQ_24910.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .