Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹17.3 L+₹18,820.90 (1.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹17.5 L+₹35,930.81 (2.10%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹17.1 L
EMD Value
₹86,000
Closing Date
6 Oct 2026, 5:00 pmClosed
BDO SHIKARPUR
BDO OFFICE SHIKARPUR
Work No 1 Gram Chitson Khairpur Vikas Khand Shikarpur me Brhaman Samaj ke Samshan Ghat me Farsh Banch And one Shaid Ka Nirman Karya
2026_RDUP_1191370_1
700/BLOCK SHIKARPUR 2026-27 DT 16-09-2026
Open Tender
Civil Works
Percentage
120 days
BLOCK SHIKARPUR
Tender Fee, EMD and Other documents as per the tender document/NIT
2 documents required · 2 mandatory
₹1,750
BDO SHIKARPUR
₹86,000
7 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
6 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per SI.No. 2.8.1 | 22.78 | Cum | 196.68 | ₹4,480.37 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost ofcentering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (rcA) : 10 graded stone aggregate 40 mm nominal size Recycled Aggregate natural sources D.S.R no. 4.1.10A | 80.74 | Cum | 3,711.43 | ₹2,99,660.86 |
| - | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) D.S.R No. 6.1.1 | 3.64 | Cum | 5,569.32 | ₹20,272.32 |
| - | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (Under Floor) as per SI.No. 2.25 (a) | 248.47 | Cum | 212.6 | ₹52,824.72 |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources){D.S.R. No. 5.1.2} | 5.64 | Cum | 6,835.04 | ₹38,549.63 |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement . 1:1.5:3 (1 cement : 1.5 coarse sand(zone-iii) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) D.S.R No.5.2.2 | 1.75 | Cum | 8,200.57 | ₹14,351 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). D.S.R No. 5.3 | 0.93 | Cum | 8,693.64 | ₹8,085.09 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for. Foundations, footings, bases of columns, etc. for mass concrete D.S.R No. 5.9.1 | 27 | Sqm | 296.31 | ₹8,000.37 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for. Columns, Pillars, Piers, Abutments, Posts and Struts. D.S.R No. 5.9.6 | 30.36 | Sqm | 726.37 | ₹22,052.59 |
| - | Steel reinforcement for R.C.C. work ready to use “cut and bend” rebars of approved make from factory/workshop to construction site including placing in position and binding all complete upto plinth level.thermo-Mechanically Treated bars of grade Fe-500D or more.D.S.R No. 5.22B.1 | 587.81 | KG | 75.3 | ₹44,262.09 |
stage.html
html • 0.02 MB
finance_2247341.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_2247341.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .