Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC LER | |
| 2 | L2₹4.0 L+₹493.41 (0.12%)Rejected-Finance | L2 | Rejected-Finance AER |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
21 May 2025, 3:00 pmClosed
Block Development Officer(V.Pt), Thurinjapuram
Block Development Office(V.Pt), Thurinjapuram
Construction of Cremation shed at VP Kuppam ADC BG at Vedanthavadi Panchayat
2025_RDTN_558433_1
AS No A6/1770/2025 DT 04.04.2025
Open Tender
Civil Works
Item Rate
60 days
Block Development Office(V.Pt), Thurinjapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,000
Yes
23 Jun 2025
15 May 2025
21 May 2025
15 May 2025
21 May 2025
15 May 2025
Amount
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Reinforced cement concrete 1; 11/2;3 using 20mm iss HBG metal including the cost and conveyance of all meterials and cost of all labour charges etc complete
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
Colums Below GL
Column above G.L.
Supplying and Fabricating Steel for Rcc work including all cost complete complying with standard specification.
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.
Plastering with Cement Mortar 1:3 (one cement and three sand) 10 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Plastering with Cement Mortar 1:4 mix 20 mm. thick including cost and conveyance of all materials to site and labour charges etc completed.,
Plastering with Cement Mortar 1:5 mix 12 mm. thick including cost and conveyance of all materials to site and labour charges etc completed.,
Painting two coats with approved Emulsion paint over one priming coat of cement plastered wall surface including cleaning preparing the surface and curing etc, complete-10m2
Provision for Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.K.KUMAR (BID ID -1345358)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .