Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-Finance | L1 | Accepted-Finance LOWER RATE FOUND | |
| 2 | L2₹9.8 L+₹10,798.50 (1.11%)Rejected-Finance | L2 | Rejected-Finance HIGHER RATE FOUND | |
| 3 | L3₹9.9 L+₹20,526.89 (2.11%)Rejected-Finance BIRSINGHPUR SULTANPUR 228141 | SULTANPUR | UTTAR PRADESH | 228141 | L3 | Rejected-Finance HIGHER RATE FOUND |
Tender Value
Refer Docs
EMD Value
₹19,457
Closing Date
18 Sept 2026, 12:00 pmClosed
EO NPP SULTANPUR
EO NPP SULTANPUR
2-Ward Dariyapur Mein Shubham Gautam ke Makan ke Putti Yadav ke Makan Hote Hue Subhash Rajesh Manoj ke Makan Hote Hue Chhote Lal Bheem ke Makan Tak Nali Nirman covering Va interlocking Sadak Nirman
2026_DOLBU_1182541_2
553/NPPSUL/2026-27 DT. 25.08.2026
Open Tender
Civil Works
Percentage
90 days
NPP SULTANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,148
EO NPP SULTANPURE
₹19,457
6 Oct 2026
5 Sept 2026
18 Sept 2026
5 Sept 2026
18 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work SOR Ch-15 item no.692 | 4.2 | Cum | 442 | ₹1,856.4 |
| 2 | Dismantling old interlocking road as per SOR CH-17 item no.13 | 414.18 | Sqm | 8.9 | ₹3,686.2 |
| 3 | Earthwork excavation in foundation in ordinary soil i/c all .. as per SOR CH-4 item no.2.8.1 | 21.6 | Cum | 155 | ₹3,348 |
| 4 | Disposal of Malwa | 58.93 | Cum | 183.5 | ₹10,813.66 |
| 5 | Construction of granular sub-base by providing coarse graded Material, grading one spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory power roller to achieve the desired density. complete as per clause 401 | 38.92 | Cum | 3,361 | ₹1,30,810.12 |
| 6 | PCC with 1:6:12 cement fsand & 40mm brick bat V/e laboure material T&P .. etc complete as per SOR CH-5 item no 273 | 5.76 | Cum | 4,500 | ₹25,920 |
| 7 | M150 Brick work with 1:4 cement and c. sand mortor ... etc as per SOR CH-6 item no.6.1.1 | 1.04 | Cum | 6,267 | ₹6,517.68 |
| 8 | Avg 12mm thk plaster with 1:4 cement and c.sand mortor i/c all as per SOR ch.11 item no.13.4.1 | 3.75 | Sqm | 191 | ₹716.25 |
| 9 | shuttering and centering as per SOR CH-5 item no.5.9.2 | 264 | Sqm | 330 | ₹87,120 |
| 10 | Providing and laying of R.C.C with 1:1.5:3.(1 cement:1.5 c.sand :3 20 mm gauge stone aggregate i/c all ... as per SOR CH-5 item no.5.1.2 | 21.6 | Cum | 8,120 | ₹1,75,392 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_2223555.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .