| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.9 LAccepted-AOC | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹2.9 L+₹4,597.85 (1.60%)Rejected-AOC VILL P O AMJHARA P S BASANTI DIST SOUTH 24 PARGANAS PIN 743329 | AMJHARA | SOUTH 24 PARGANAS | WEST BENGAL | 743329 | L-2 | Rejected-AOC L-2 Bidder | |
| 3 | L-3₹3.9 L+₹1.1 L (36.5%)Rejected-Finance | L-3 | Rejected-Finance L-3 Bidder |
Tender Value
Refer Docs
EMD Value
₹6,500
Closing Date
29 Jun 2024, 4:00 pmClosed
GM(P and P)
Office of the GM(P and P), 2nd Floor, Technical Building, Unit 7, DPL, Durgapur, Paschim Bardhaman, West Bengal , Pin-713201
Beautification of the existing garden at the eastern side of Admn Bldg by plantation and other related decorative works
2024_DPL_690854_1
WBDPL-11017(33)/17/2024- GM-HRA(DPL)-DPL /TS/E-039
Open Tender
CIVIL WORKS
Item Rate
90 days
Administrative Building DPL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,500
26 Sept 2024
10 Jun 2024
3 Jul 2024
10 Jun 2024
29 Jun 2024
10 Jun 2024
Amount
Earth work in excavation of foundation trenches or drains , in all sorts of soil( including mixed soil but excluding laterite or sand stone) including removing , spreading or stacking the spoils within a lead of 75 m. as directed . The item includes necessary trimming the sides of trenches , leveling , dressing and ramming the bottom , bailing out water as required complete. a) Depth of excavation not exceeding 1500 mm
Earth work in filling im foundation trenches or plinth with good earth , in layers not exceeding 150 mm including watering and ramming etc layer by layer complete. ( Payment to be made on the basis of measurement of finished quantity of work) a) with earth obtained from excavation of foundation.
Filling in foundation or plinth by silver sand in layers not exceeding 150mm as directed and consolidating the same by thorough saturation with water ramming complete including the cost of supply of sand. ( Payment to be made on measurement of finished quantity).
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. Pakur variety (Analysis rate enclosed)
100 mm. thick brick work with Fly Ash Bricks set in cement sand mortar (1:4) including raking out joints, curing, scaffolding etc. complete in all respect; In ground floor.
Cement concrete with graded stone ballast (40 mm size excluding shuttering);In ground floor;Pakur Variety;1:3:6 proportion
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]; with 1:4 cement mortar; 20 mm thick plaster
Neat cement punning about 1.5mm thick in wall , dado , window, sills ,floor , drain etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement and up to roof of ground floor/up to 4 m (i) Tor steel/Mild Steel
B) Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge .
Planting of trees ( Avenue plants) in 0.60m dia holea, 1m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure. This includes supply of labour, tools & plants including materials but excluding cost of tree.
Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. i) Korobi , kolke, Debdaru etc
Hire charges of excavator including operator for dressing of land.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur Variety
80 mm thick interlocking designer concrete paver block M-40 grade for medium-traffic zone & utility cuts on arterial roads etc. as per IS: 15658-2006 (over 20-40 mm medium sand bed on 250mm thk WBM/ WMM base course & 250 mm thk bound gnaular/ granular sub-base course & filling the interstices of blocks with fine sand by brooming & subsequent watering including cost of sand for sand bed but excluding cost of base, sub-base course & subgrade preparation.) complete as per direction of Engineer-in-Charge. [Note: Subgrade CBR shouldnot be less than 5] Colour Decorative
Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed.
200 mm. thick Brick work with Fly Ash Bricks set in cement sand mortar (1:6) including raking out joints, curing, scaffolding etc. complete in all respect.;In ground floor
Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment)
Supplying and stacking sludge (adequate for Horticulture work) at site in dry cake form from approved disposal work site including royalty, all lead and lift etc. (Sludge measured in stack will be reduced by 8%)
Spreading of sludge, dump manure,/farm yard manure/animel dung manure and good earth in required thickness. This includes supply of labour, tools & plants excluding materials.
Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 ( 8 parts of stacked volume of earth after reduction by 20%, one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary watering and finally fine dressing, levelling etc., including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5m complete. This includes supply of labour, tools & plants including materials. Planting hedge plants in two rows at 30cm apart
Maintenance of hedge for one year including application of necessary pesticide, farm yard manure, replacement of damaged hedge plant by new one complete in all respect as per instruction of Engineer-in-charge. This includes supply of labour, tools & plants including materials.
Supplying, fitting galvanised 3 ply 12 gauge / 4 points line of barbed wire in fencing (holes already made in the body of the post) or fixed by staples tightening and fixing the wires in taut condition with straining bolts including the cost of cutting and of lapping joints in the wire as necessary but excluding the cost of galvanised staples,straining bolt and binding wire where necessary.
S.S. CONSTRUCTION
M/S ANJALY CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .