Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹50.9 LAccepted-AOC 120 THAMBU CHETTY STREET AKBAR TOWER 3RD FLOOR CHENNAI 600 001 | CHENNAI | TAMIL NADU | 600001 | 1 | Accepted-AOC 1 st lowest | |
| 2 | 2₹54 L+₹3.1 L (6.11%)Rejected-AOC FLAT NO 2 2 SHREEMAA ENCLAVE GA PLOT NO N2 43 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | 2 | Rejected-AOC 2nd lowest | |
| 3 | 3₹55.0 L+₹4.1 L (7.99%)Rejected-AOC 52 A 4TH FLOOR INDIAN REGISTER OF SHIPPING ADI SHANKARACHARYA MARG POWAI LAKE POWAI MUMBAI MAHARASHTRA | 3 | Rejected-AOC 3rd lowest | |
| 4 | 4₹69.3 L+₹18.4 L (36.2%)Rejected-AOC 4B ADI SHAKARACHARYA MARG POWAI ROAD VIKHROLI POWAI POWAI MAHARASHTRA 400083 | MUMBAI SUBURBAN | MAHARASHTRA | 400083 | 4 | Rejected-AOC 4th lowest | |
| 5 | 5₹78.9 L+₹28.0 L (55.0%)Rejected-AOC 701 HARBHAAJAN BUILDING CST ROAD KALINA SANTACRUZ EAST MUMBAI 400 098 | MUMBAI SUBURBAN | MAHARASHTRA | 400098 | 5 | Rejected-AOC 5th lowest |
Tender Value
₹91 L
EMD Value
₹91,000
Closing Date
25 Sept 2023, 5:00 pmClosed
CE and BM , RBVN Basin, Berhampur
Office of the Chief Engineer and Basin Manager, RBVN Basin, Berhampur, Courtpeta PIN-760004
Appointment of Third Party Inspection Agency(TPIA) for Construction of Left link channel and Left Distribution system for CCA of 760ha and Right Distribution system for CCA of 2000ha through Under Ground Pipe Line irrigation system(Pressure Flow)....
2023_CEBMB_93687_1
CE and BM, RBVN-06/2023-24
National Competitive Bid
Civil Works - Others
Turn-key
720 days
Digapahandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
₹91,000
Yes
7 Feb 2024
4 Sept 2023
26 Sept 2023
4 Sept 2023
25 Sept 2023
4 Sept 2023
4 Sept 2023 - 25 Sept 2023
Amount
Consultancy charges for QC/QA Planning& getting approval from Chief Engineer & Basin Manager, RBVN Basin, Berhampur inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/store includingsite inspection and checking of material and equipments used as per design & specification approved by the Chief Engineer & Basin Manager, RBVN Basin, Berhampur and submitting the final report for 2760 Ha. of canal network and 2760Ha. of CAD work including submission of Report .
mars planning & engineering services pvt ltd
IRCLASS SYSTEMS AND SOLUTIONS PRIVATE LIMITED
SGS INDIA PRIVATE LIMITED
Aarvee Associates Architects Engineers and Consultants Private Limited
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .