Loading…
Loading…
Tender ID
Tender Value
₹82 L
EMD Value
₹6.1 L
Closing Date
24 Mar 2026, 12:00 pmClosed
OFFICE OF SE SUL-AMETHI CIRCLE PWD SULTANPUR
OFFICE OF SE SUL-AMETHI CIRCLE PWD SULTANPUR
BOQ
2026_CEUFZ_1129239_2
934/1com-Sul.A.Cir./2025-26 Date 10.03.2026
Open Tender
Civil Works - Roads
Percentage
90 days
SULTANPUR
NIT
2 documents required · 2 mandatory
₹2,714
₹6.1 L
Yes
7 Apr 2026
23 Mar 2026
24 Mar 2026
23 Mar 2026
24 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Helipad Earth work Excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising th remaing earth locally for road work .Mechanical means (depth upto 3 m) | |||||
| 2Providing and laying in cement concrete 1:4:8 (1cement:4 fine sand:8graded stone ballast 40 mm nominal size) and curing complete including supply all materials, labour and T&P etc. required for proper completion of the work. | |||||
| 3Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. | |||||
| 4M.S. tubular Pipe 50 MM dia S.l. 22 Ref to DAR 10.26.2 | |||||
| 5Construction of embankment and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement. 3 Km Distance.(Cartage Earth For Pattri) | |||||
| 6Providing and laying of hot appiled thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35 The finished surface to be level, uniform and free from streak and holes. Area of Edge line of 10 cm. width along road both sides | |||||
| 7Plain/reinforced cement concrete in open foundation complete as per drawing and technical specification. M-30 | |||||
| 8Plain/reinforced cement concrete in open foundation complete as per drawing and technical specification. M-20 | |||||
| 9Seperation membrane of impermeable plastic sheeting 125 Micron thick | |||||
| 10Construction of Approach Road Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | |||||
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.38 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_2106452.xls
BOQ • 0.49 MB
b.pdf
Additional Documents • 1.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .