Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAccepted-AOC | ₹21.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.9 L+₹1.1 L (5.12%)Rejected-Finance | ₹22.9 L+₹1.1 L (5.12%) | L2 | Rejected-Finance 2nd Lowest bidder |
| 3 | L3₹22.7 L+₹89,646.91 (4.11%)Rejected-Finance LAMA DHIM RINGKINGPONG ROAD P O DIST KALIMPONG PIN 734301 | KALIMPONG | KALIMPONG | WEST BENGAL | 734301 | ₹22.7 L+₹89,646.91 (4.11%) | L3 | Rejected-Finance 3rd lowest bidder |
Tender Value
₹21.8 L
EMD Value
₹43,624
Closing Date
5 Feb 2026, 6:00 pmClosed
Executive Engineer, Kalimpong Engineering Division
Executive Engineer, Kalimpong Engineering Division
Construction of protection wall, Drainage along Ramitey Dara to Fiyang Khola, G.P. Yangmakum
2026_GTA_992994_1
55/EE/KED/KPG/GTA/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
Kalimpong
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
₹43,624
21 Sept 2026
23 Jan 2026
9 Feb 2026
24 Jan 2026
5 Feb 2026
24 Jan 2026
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge
Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site
Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification.
(II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety In ground floor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.64 MB
Tendernotice_2.pdf
PDF • 2.02 MB
BOQ_2428404.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .