Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.8 LAdmitted-Finance DAHILAMAU SADAR PRATAPGARH | PRATAPGARH | UTTAR PRADESH | 229408 | -0.52% | ₹20.8 L | L1 | Admitted-Finance |
| 2 | L2₹20.9 L+₹8,361.80 (0.40%)Admitted-Finance | -0.12% | ₹20.9 L+₹8,361.80 (0.40%) | L2 | Admitted-Finance |
Tender Value
₹20.8 L
EMD Value
₹41,640
Closing Date
24 Jul 2026, 12:00 pmClosed
EE RED PRATAPGARH
EE RED PRATAPGARH
VIKAS KHAND GAURA GRAM NARAYANPUR KALA ME SUKAL KA PURWA ME PAKKI SADAK SE PATEL BASTI TAK INTERLOCKING KARYA
2026_REDUP_1170788_1
05/RED/E-TENDER/118/2026-27 DATE 01/04/2026
Open Tender
Civil Works
Percentage
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,750
₹41,640
Yes
18 Aug 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 18 % GST Extra | - | - | - | - |
| 2 | E/W in Cutting or filling in embankment in ordinary soil i/c all ramming dressing,etc required for proper complition of work.with One km cartage Extra.SI No. 253 | 90 | Cum | 164 | ₹14,760 |
| 3 | Earth Work in excavation in foundation in ordinary soil inclunding with all complete as per S.I. No. 251 | 70 | Cum | 160 | ₹11,200 |
| 4 | Cement concrete with 4cm (1.1.2) gauge brick ballast fine local sand of 1.25fm and cement in proportion of 12:6:1 in foundation and under floors including supply of all materials labour tools & plants etc required for proper work completion as per s | 26.25 | Cum | 3,620 | ₹95,025 |
| 5 | M-150 Class Brick work with (1:4) C:C sand mortar i/c All in fd & plinth. SI No 305a | 107.25 | Cum | 5,410 | ₹5,80,222.5 |
| 6 | Providing, laying, spreading and comapcting stone aggregates of 53-22.4mm size to water bound macadam G-3 specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required denisity Grading 3 as per Technical Clause 405 (3) A | 95.63 | Cum | 3,635 | ₹3,47,615.05 |
| 7 | Provoiding and laying of Rubber moulded (Grey Colour) interlocking concrete block pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30mm thick local sand on bed, filling joints with local sand etc as per technical specification clause 1504 | 1,275 | Cum | 863 | ₹11,00,325 |
| 8 | Cement concrete in 1:2:4 Cement. C-Sand & 20mm gauge stone grit i/c all complete as the top of wall s.i. no 279(a) | 5.75 | Cum | 7,100 | ₹40,825 |
| 9 | S/F of 350mm NP-3 Huime Pipe i/c all complete. | 5 | Cum | 2,100 | ₹10,500 |
| 10 | As per order of Joint Secretary G.O. No. G-1877 Dated 21-02-2025 and Director cum Chief Engineer UP RED Lucknow Letter No. 801 Dated 03-03-2025 Deduction 5% for Comptetive Price efficiency. | 1 | Job | -1,10,022.72 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_2197055.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .