| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹61.1 LAdmitted-Finance DOON PUBLIC SCHOOL NEAR HOUSE NO 838 P SECTOR 21 PANCHKULA 134112 | PANCHKULA | PANCHKULA | HARYANA | 134112 | -18.85% | ₹61.1 L | L1 | Admitted-Finance |
| 2 | L2₹61.8 L+₹74,516.92 (1.22%)Admitted-Finance | -17.86% | ₹61.8 L+₹74,516.92 (1.22%) | L2 | Admitted-Finance |
Tender Value
₹75.3 L
EMD Value
₹1.5 L
Closing Date
3 Aug 2026, 11:00 amClosed
YOGESHWAR
HSVP DIV 1 Sec 8 Panchkula
Development of Pavement DBM BC of Road infront of Nirjhar Vatika in Sector 5 Panchkula
2026_HBC_536792_1
2026EE9B633D D053 47AA A2EB E472E4F5EBDC269HSV
Open Tender
Civil Works
Works
120 days
Panchkula
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
Yes
₹1.5 L
Yes
10 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
27 Jul 2026 - 3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 4.12.1:- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-incharge. 1. All kinds of soil [Through Rate] | 2,295.36 | P. Cum | 78 | ₹1,79,038.08 |
| 2 | 10.77:- Providing and laying 80mm thick factory made cement concrete interlocking paver block of M -35 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 60mm thick compacted bed of coarse sand,
filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [Through Rate | 4,599.24 | P. Sqm | 637 | ₹29,29,718.43 |
| 3 | 10.100.2:- Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate | 14.92 | P. Cum | 1,863 | ₹27,786.64 |
| 4 | 17.13:- Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H
technical specifications [Through Rate] | 764.63 | P. Cum. | 1,094 | ₹8,36,499.75 |
| 5 | 17.24:- Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications [Through Rate] | 573.47 | P. Cum. | 1,174 | ₹6,73,252.61 |
| 6 | 17.26.2:- Tack Coat 2. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of
MORT&H specificatins [Through Rate] | 950 | P. Sqm. | 16 | ₹15,200 |
| 7 | 17.31.2:- Bituminous Concrete with Batch type HMP 2. Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Note-If bitumen required is more than 5.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate] | 28.5 | P. Cum | 7,749 | ₹2,20,846.5 |
| 8 | 17.52:- Patch work with Bituminous Macadam 50 to 75 mm thickness (grading II) Providing and laying bituminous macadam 80-100 mm thick with continuous type HMP 40 -60 TPH using crushed aggregates of specified grading premixed with bituminous binder VG - 30 @3.4% transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction complete as per technical clause 504 of MORT&H specifications Grading II (19 mm nominal size) [Through Rate] | 47.5 | P. Cum | 5,648 | ₹2,68,280 |
| 9 | 17.70:- Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 1,719.73 | P. Sqm | 26 | ₹44,713.03 |
| 10 | 7.21.2 Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 158.63 | P. Cum, | 3,968 | ₹6,29,447.81 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_615930.xls
BOQ • 0.26 MB
AD0167694.pdf
Additional Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .