Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 CrAccepted-AOC T 3 PARMESHWARI BLDG CHATRIBARI RD GUWAHATI ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | ₹13.6 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹13.9 CrRejected-Finance | ₹13.9 Cr | L2 | Rejected-Finance Not Admitted |
Tender Value
₹13.9 Cr
EMD Value
₹27.7 L
Closing Date
21 Sept 2020, 2:00 pmClosed
Chief Engineer (MI),Irrigation,Assam
O/o Chief Engineer (I),Irrigation,Assam, Ghy-03
Installation of Electrical/Solar powered Tube Well Schemes under PMKSY-HKKP (Ph-II) Access to ground water for the year 2020-21
2020_ID_18526_4
27 _PMKSY_HKKP_ 2020_21 Date 27.08.2020
Open Tender
Civil Works
90 days
Hailakandi
Please refer Tender documents.
7 documents required · 7 mandatory
₹20,000
EE,Hailakandi Division(I), Hailakandi
₹27.7 L
Yes
16 Dec 2020
27 Aug 2020
21 Sept 2020
27 Aug 2020
21 Sept 2020
28 Aug 2020
Amount
Construction of Tube Well (boring, shrouding, developing, lowering and fixing of pipe etc)
Drilling of telescopic vertical bore well in alluvium area as per IS -2800 (Part-I)/1991 upto a depth of 45 M for Tube well assembly (150 mm dia x18 Metre +100 x dia x 27 Metre) and collecting & storing strata sample in suitable container at every 3.0 M including preparation of site, providing and movement of rig up to boring point, water supply, temporary accomodation, consumable like bantonite power, POL and all other materials reqd for the purpose including transportation, labour all complete as directed
:Supply & Lowering of Pipes :-Supplying sinking, lowering and fitting in position of UPVC Casing pipe/ blind Pipe/ Ribbed screen filter pipe conforming to IS 12818/2010 and of approved brand (Jindal/ Prince/ Oriplast) including well cap, socket reducer, MS housing clamp etc up to a depth of 50 metre as reqd and as directed i) 150 mm dia UPVC pipe thickness 6.5 mm to 8.0 mm
ii) 100 mm dia UPVC pipe pipe 5 mm to 6.5 mm
iii) 100 mm dia UPVC Ribbed Screen pipe 5 mm to 6.5 mm
iv) 65 mm sluice valve
Shrouding of the Tube well assembly by packing of river Pea Gravel of size 4mm to 8 mm free from sand, dust and any other foreign materials after staking at site including screening, washing etc as per IS 4097/2008 along with transportation, labour etc. complete as directed and (Packing to done after lowering tube well assembly and also during development as reqd)
Developing the Tube well assembly by air compressor of capacity 8-12 kg/sqcm so as to get sand free discharge including trial pumping and providing following data as directed. 1. Static water level 2. available average discharge 3. Drawdown at different discharge (arrangement of Pump for trial pumping is in the scope of the work)
Supplying, fitting, fixing of 150 mm dia MS clamp of size 15 mm thick and 150 mm width having projection of 300 mm and three holes of 20 mm dia for clamping the plates by 16 mm dia hexagonal bolts of length 75 mm and nuts on both sides encircling the column pipe including two coat of enamel paint over one primary coat of different dia all complete as directed and specified.
Installation and Commissioning of Electrical Pumpset includinng LT service connection
Supplying and installation of submersible Electrical pump set of approved make conforming to IS-8034/2002 of following capacity suitable for 150 mm dia tube well including providing 100 mm dia column pipe up to 18 M length, flat PVC insulated copper cable 2 × 4 sqmm, upto 50 M, tube well assembly support MS clamp, cable clamp, suspension wire rope, 65 mm PVC delivery bend etc. complete as reqd and as directed Pump specification :- 3 HP submersible Electrical Pumpset working with(230V ± 10 % ), 50 hz single phase supply with minimum discharge of 400 LPM (0.0085 Cumec) dynamic head range 10M to 20 M, minimum efficiency 70 %
Supply, fabrication and erection of Control Panel housing for 3 HP single Phase Submersible Pumpset , made of 2 mm thick CR iron sheet and angle iron 30mmx30mmx3 mm with folded and welded construction having 2 mm thick slanted double roof, a hinged front door with locking arrangement, knob, gasket etc, two side ventilators, fixed by Nuts and bolts or through welding on MS angle frame , whole box and frame painted in two coats of red oxide primer and 2 coats of syntheti enamel paint of approved colour , including excavation, form work , CC grouting etc complete as per drawing and as per following size and specification and as directed . (i) Box size : 600mm(B) x 400mm(D) x 500mm (H), , MS flat size for door boundary and mid vertical =30mmx30mmx3mm, There shall be one MS plate 600mmx300m fixed with 30mm×30mm×3mm angle inside and parallel to and at 100mm from back surface at mid height for fitting Pump Controller (HAVELLS or eqv ISI make), MCB 32A,SP 250 V (HAVELLS or eqv ISI make) and the Energy Meter ( Cost of controller, MCB and EM extra) (ii) Box Mounting Frame :- Size 600mm(L) x400mm(B) x 1600mm (H) MS angle size :- 50mm×50mm×5mm for post and 35mmx35mmx3mm for horizontal top boundary and intermediate boundary. Each angle post to have bottom plate 100mm×100mm×3mm. Erection depth 400mm. (iii) CC grouting of Post:- CC grouting consists of one PCC base 300mmx300mmx100mm in proportion 1:3:6 below each post , and CC muffing of size 300mm×300mm×700mm above the base in proportion 1:2:4 extending upto 300M above GL
Erection of Static Electronic Energy Meter including payment of Meter Cost to APDCL, testing of the installation and power connection to the installation complete as directed
Supply and erection of Pipe earthing with 40 mm dia × 2.5 mtr long perforated GI pipe with nuts and bolts at top having PVC enclosure at the top with hinged cover, to be erected along with reqd salt and charcoal around the pipe, making earth connection with 8 SWG GI Earth wire to be laid through 13 mm dia GI pipe as directed.
Cost of Power connection upto Tube well Point
Erection of 230 V, 2 wire single phase over head line with AAA WEASEL conductor to be erected on 7.5 metre long PSC pole with maximum span of 40 metre including suply of pole, conductor, GI support, insulators and all othe materials as reqd under supervision of APDCL complete as directed
Supply laying and connection of XLPE insulated Aluminium conductor armoured cable,10 sq mm× 2 core (For Service Connection from Pole to Panel board)
( Erection of 11 kV line, Transformer, Aero Bunch Cable Line Etc)
Erection of 2 wire over head 11 kV line with 8.5 mtr PSC pole, ACSR RABBIT conductor and GI supports, Stay set, polymeric insulators with average span of 55M-60M complete under supervision of APDCL including all formalities and payments to APDCL as reqd and as directed. (For every 6 nos of TW points there will be about 300 M length of line with an average 50 metre for each TW point for estimating purpose)
Supply, erection and commissioning of one no 11kV/ 0.433kV 1- ph, 16 kVA transformer in cluster of 5 nos TW points including supply, erection of 2 nos 8.50 M long PSC pole, GI Cross arms, 1 no DO fuse unit, 1 no GO AB switch, 2 nos 5 kA lightning arrestor, 6 nos CI Earthing pipes 100mm × 2.50 M, 6 SWG GI wire, 1 no distribution box,, 16 sq mm × 1 core armoured cable 30 mtr, all complete including all formalities and payment to be made to APDCL for the purpose as reqd and as directed ( 1 no of Transformer to be erected against every 6 nos of TW points and average quantity per TW point is 1/6 for estimating purpose)
AB Cable LT Line :- Supply and erection of 1-Ph - 230 V LT line with Aero Bunch Cable, with Aluminium conductor, XLPE insulated,1100 V Grade on 7.5 Mtr long PSC pole including supply and erection of poles, supply, fitting fixing of all accessories like Anchor Clamp, Eye Hook etc complete under supervision of APDCL as reqd and as directed. Size of cable 2 ×35sqmm + 1×25sqmm (Messenger) ( Average span 25-30 M)
Supply and fitting of 11 KV Danger Plate as per IE rule
Solar: Construction of Tube Well (boring, shrouding, developing, lowering and fixing of pipe etc)
Drilling of telescopic vertical bore well in alluvium area as per IS -2800 (Part-I)/1991 upto a depth of 45 M for Tube well assembly (150 mm dia x18 Metre +100 x dia x 27 Metre) and collecting & storing strata sample in suitable container at every 3.0 M including preparation of site, providing and movement of rig up to boring point, water supply, temporary accomodation, consumable like bantonite power, POL and all other materials reqd for the purpose including transportation, labour all complete as directed.
Supplying sinking, lowering and fitting in position of UPVC Casing pipe/ blind Pipe/ Ribbed screen filter pipe conforming to IS 12818/2010 and of approved brand (Jindal/ Prince/ Oriplast) including well cap, socket reducer, MS housing clamp etc up to a depth of 50 metre as reqd and as directed i) 150 mm dia UPVC pipe thickness 6.5 mm to 8.0 mm
ii) 100 mm dia UPVC pipe pipe 5 mm to 6.5 mm
iii) 100 mm dia UPVC Ribbed Screen pipe 5 mm to 6.5 mm
iv) 65 mm sluice valve
Shrouding of the Tube well assembly by packing of river Pea Gravel of size 4mm to 8 mm free from sand, dust and any other foreign materials after staking at site including screening, washing etc as per IS 4097/2008 along with transportation, labour etc. complete as directed and (Packing to done after lowering tube well assembly and also during development as reqd)
Developing the Tube well assembly by air compressor of capacity 8-12 kg/sqcm so as to get sand free discharge including trial pumping and providing following data as directed. 1. Static water level 2. available average discharge 3. Drawdown at different discharge (arrangement of Pump for trial pumping is in the scope of the work)
Supplying, fitting, fixing of 150 mm dia MS clamp of size 15 mm thick and 150 mm width having projection of 300 mm and three holes of 20 mm dia for clamping the plates by 16 mm dia hexagonal bolts of length 75 mm and nuts on both sides encircling the column pipe including two coat of enamel paint over one primary coat of different dia all complete as directed and specified.
Installation and Commissioning of Solar Power Plant
Cost for Supply, Installation & commissioning of Solar Photovoltaic Power Plant for energizing the 3HP submersible pump set with solar pump, panel mounting structures etc. SPV Module 3 KW, Solar Pump Controller Unit, cables, including LT panel, earthing and lighting arrestor etc. Work as per the MNRE norms and with following instructions as per direction of the department, i) Supply, installation and commissioning of Solar PV for water pumping system consisting of solar panels framed in anodized aluminium frame mounted on stable hot dipped galvanized ( min 80 micron thickness) mild steel structure of rectangular hollow sections, angles, heavy duty pipes (all materials duly IS marked ) for providing sufficient strength with dual axis manual tracking arrangement which can withstand load of modules and high wind velocities upto 150 Km/hr, having RCC foundation designed against all possible loads (Dead, Live and imposed load). Modules supplied with the SPV system should have certificate as per IEC 61215 specification or equivalent National or International standards and must be interconnected with cables of required specification routed in PVC conduits properly fitted along the G.I structure to provide a good aesthetic view. Modules must qualify to IEC 61730 part I and part II for safety qualification testing. The power output of individual PV modules used in the PV array, under STC, should be of minimum 250 Watts peak, with adequate provision for measurement tolerances. Solar cells should be crystalline silicon cell with min. efficiency of 15% and fill factor more than 70%, should be laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3.2mm tempered glass including appropriate DC to AC inverter and power controlling unit with MPPT technology to run at low sunshine and minimum 6 hours a day run with all necessary accessories suitable for solar + grid operation and including all protections of AC induction motor pump. (SPV panel should be of reputed make of MNRE and carry at least 20 years warrenty & comprehensive maintenance for 1 year and should preferably above HFL ) ii) Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. Below the ground level as below: (a) By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connectionto equipments incl.drilling holes, withbolts,nuts, washers etc. iii)) Lightning protection (Arrestor)(pole mounted)(: Lightning protection with 3" X 1.5" G.I pipe of 4 mts height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc including supply & fixing GI (Hot Dip) strips 20 mm x 3 mm thick for horizontal run on the /Roof with GI Saddles 1100 mm apart. iv) Supply, installation and commissioning of BIS marked submersible pump set of 3 HP with 100mm outlet as per specification using necessary requisite, tools and plants by lowering the same within the tubewell housing pipe upto the following depth as per direction by fitting, fixing column pipes and other accessories, fixtures with necessary nuts, bolts and washers and suspending the entire assembly of pump set vertically by fixing the same supported by M.S. clamps over the top of housing pipe, binding the motor cable with each column pipes and drawing cable upto pump controller/starter point including opening out of the top cap of housing pipe of the tubewell and testing of motor both in loading as well as in unloaded condition before and after installation of the same. (Solar Pumpset and cables should be of reputed make and carry 5 years warrenty). Solar submersible pumpset with 3 HP discharge capacity approximately 400 LPM at 10 m head working with 3000 W of solar power array along with cables etc. in complete as per MNRE norms & as per IS. v) Controller should be of the approved make; as per BIS/IS/MNRE specifications and it should be in accordance with the electrical parameters of the 3HP D.C. Motor/Pump. Controllers should be fixed in suitable IP 54 Box with the provision of SPD as per norms of SNA. Controller must have Remote Monitoring Arrangement as per MNRE guidelines. Some of the requirements of the Controller are : Controller capacity is minimum 3000W, operating freq. 50Hz± 10%, MMPT, IP65 enclosure, DC circuit breaker disconnect switch, GSM/GPRS, LCD display etc. vi) Supply, installation and commissioning of control panel mounting structure as per approved drawingcomplete as directed in all respec
M/S Raj Kumar Jain
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid