Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹72 LAccepted-AOC | 1 | Accepted-AOC Accepted | |
| 2 | 2₹79.3 L+₹7.3 L (10.1%)Rejected-AOC 443 V P O PUTHI 131301 | PUTHI | SONIPAT | HARYANA | 131301 | 2 | Rejected-AOC Accepted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹80.6 L
EMD Value
₹1.6 L
Closing Date
22 Jun 2020, 5:00 pmClosed
Executive Engineer, PHE Divison No.1, Karnal
Executive Engineer, PHE Divison No.1, Karnal, Jal Bhawan, Near Karan Gate, Karnal
Operation and Maintenance for various sizes Sewer Line 200 mm to 700 mm i/d, S.W. pipe, R.C.C. pipe and HDPE pipe under PHE Division No.1, Karnal for Taraori Town, Period of O and M 36 Months. From the Date of allotment
2020_HRY_131650_1
Operation and Maintenance for various sizes Sewe
Open Tender
Civil Works
Works
1095 days
Executive Engineer, PHE Divison No.1
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
Engineer in Chief
₹1.6 L
Yes
21 Jul 2020
12 Jun 2020
23 Jun 2020
12 Jun 2020
22 Jun 2020
12 Jun 2020
Amount
A/Mtc. Estimate for Sewerage Scheme Taraori Town. “Operation & Maintenance for various sizes Sewer Line 200 mm to 700 mm i/d, S.W. pipe, R.C.C. pipe and HDPE pipe under PHE Division No.1, Karnal for Taraori Town, Period of O&M 36 Months”. (From the Date of commencement) Length of sewer of various size = 43.35 KM 1st Year
2nd Year
3rd Year
Mohan LAL
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .