Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.9 LAccepted-AOC | ₹6.9 L | 1 | Accepted-AOC Accepted for L1 |
| 2 | 2₹7.3 LRejected-Finance | ₹7.3 L | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | MASS INFRASTRUCTURE L2 | Santhi P L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for for foundation upto 0.30 m depth | 18.64 | cu.m | 263.77 ₹4,916.67 Lowest | 263.77 ₹4,916.67 Lowest |
| 2.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 1.89 | cu.m | 2,472.74 ₹4,673.48 Lowest | 2,472.74 ₹4,673.48 Lowest |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. . | 2.33 | cu.m | 6,296.18 ₹14,670.1 Lowest | 6,296.18 ₹14,670.1 Lowest |
| 4.00Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" including cost and conveyance of all materials to site and all labour charges etc complete | |||||
| 5.00 | Below Basement | 1.15 | cu.m | 6,265.42 ₹7,205.23 Lowest | 6,265.42 ₹7,205.23 Lowest |
| 6.00 | Super Structure | 6.15 | cu.m | 6,258 ₹38,486.7 Lowest | 6,258 ₹38,486.7 Lowest |
| 7.00Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | |||||
| 8.00 | Below Basement | 25.99 | sq.m | 547.49 ₹14,229.27 Lowest | 547.49 ₹14,229.27 Lowest |
| 9.00 | Super Structure | 91.56 | sq.m | 1,094.99 ₹1,00,257.28 Lowest | 1,094.99 ₹1,00,257.28 Lowest |
| 10.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 1.1 | MT | 91,902.65 ₹1,01,092.92 Lowest | 91,902.65 ₹1,01,092.92 Lowest |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
10 Jun 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BPT) VALANGAIMAN
BLOCK DEVELOPMENT OFFICE, VALANGAIMAN
Construction Bus Stand in Veeranam Panchayat
2026_RDTN_678253_1
2298/2025/A2
Open Tender
Civil Works - Buildings
Item Rate
Veeranam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
₹7,000
Yes
31 Jul 2026
26 May 2026
10 Jun 2026
26 May 2026
10 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for for foundation upto 0.30 m depth | - | cu.m | - | - |
| 2 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 1 | cu.m | - | - |
| 3 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. . | - | cu.m | - | - |
| 4 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" including cost and conveyance of all materials to site and all labour charges etc complete | - | - | - | - |
| 5 | Below Basement | 1 | cu.m | - | - |
| 6 | Super Structure | - | cu.m | - | - |
| 7 | Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | - | - | - | - |
| 8 | Below Basement | 1 | sq.m | - | - |
| 9 | Super Structure | - | sq.m | - | - |
| 10 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | - | MT | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
PriceBid2.pdf
Tender Documents • 0.38 MB
BOQ_814875.xls
BOQ • 0.24 MB
TechBid.pdf
Additional Documents • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].