Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.2 L+₹75,710 (3.10%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹26.3 L+₹1.9 L (7.78%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹33.4 L
EMD Value
₹66,800
Closing Date
30 Mar 2020, 3:00 pmClosed
Lt Col PK Morolia
GE (AFA) Hyderabad, Pin- 500043
MAINTENANCE AND OPERATION OF WATER PUMPS, WATER RESERVOIRS AND CONTROLLING VALVES OF CERTAIN INSTALLATIONS AT AFA HYDERABAD
2020_MES_330612_1
8948/02/E8
Open Tender
Civil Works
Item Rate
330 days
GE (AFA) Hyderabad
As per tender documents
5 documents required · 5 mandatory
₹500
Yes
GE (AFA) Hyderabad
₹66,800
Yes
22 Apr 2020
3 Mar 2020
31 Mar 2020
3 Mar 2020
30 Mar 2020
17 Mar 2020
3 Mar 2020 - 7 Mar 2020
Amount
Maintenance & Operation of water supply installations, pumping & Distribution system at Pump House No 02 in three shifts with 01 Operator (FGM) per shift, each shift of 08 hours, including Sundays and holidays, by employing the manpower for entire system comprising of installations, Centrifugal pumps, Plants, DG sets, BPD etc and connected items such as operation of sluice valves of any size situated inside/outside the pump house No 02 including operation of bore wells and maintenance of records and documents complete all as specified and directed by Engineer-in-Charge.
NOTE (i) Shift timing :- First shift 0600 hrs to 1400 hrs Second shift 1400hrs to 2200hrs third shift 2200hrs to 0600 hrs,, Suitable Reliver to be employed during weekly offs/Sundays/Leave/Holidays. (ii) Minimum one FGM shall be employed in each shift for the above maintenance and operation work. (iii) The entire surrounding area shall be cleaned & maintained well as directed by Engineer-in-Charge. (iv) Necessary printed Log sheet as per prescribed performa shall be provided by the contractor for which the rate shall be deemed to be included in the quoted rate. (v) The contractor shall provide minimum two pairs of uniform duly printed with the company name in the shirts and one pair of Industrial shoe to his employee. The samples of Uniform & Shoe shall be got approved by the Garrison Engineer/Engr-in-Charge before procurement.
(vi) Necessary hand tools & safety equipment as listed below to be provided to the operator, which shall be handed over to next operator after completion of every shift. (a) Pipe Wrench 12"-01 No (b) Adjustable Spanner 8" - 01 No (c) Screw Driver 12" - 01 No (d) Hammer 500 gm - 01 No (e) LED Torch rechargable - 01 No (f) Line tester - 01 No (g) Test Lamp - 01 No (h) Ring Spanner - 01 Set (i) Allenkey Set - 01 No (j) Toolbag of suitable size 01 No. The cost of above said necessary hand tools and safety equipment to be borne by the contractor and necessary amount shall deemed to be included in the unit rate quoted. (vii) Mobile phone to be provided for emergency communication to concerned JE/AGE. The same shall be handed over to next operator after completion of each shift. Cost of mobile phone to be borne by the contractor and necessary amount shall be included in the unit rate quoted by him. (No smart phone/ camera phone is allowed inside the AFA Campus for security point of view. Only simple bar phone shall have to be provided)
Manitenance and Operation of water supply distribution installations by operating valves of incoming and out going pipe lines of any size at OH reservoir 'A' at AFA and connected borewells in two shifts with 01 Operator(FGM) per shift, each shift of 08 hours, including Sundays and holidays, including maintenance and operation of connected Chlorine plants, BP dozers, LT Panel board etc all as directd by Engnineer-in-Charge.
NOTE (i) Shift timing :- First shift 0400 hrs to 1200 hrs Second shift 1200hrs to 2000hrs, Suitable Reliver to be employed during weekly offs/Sundays/Leave/Holidays. (ii) One FGM shall be employed in each shift for the above distribution/maintenance and operation work. (iii) The entire surrounding area shall be cleaned & maintained well as directed by Engineer-in-Charge. (iv) Necessary printed Log sheet as per prescribed performa shall be provided by the contractor for which the rate shall be deemed to be included in the quoted rate. (v) The contractor shall provide minimum two pairs of uniform duly printed with the company name in the shirts and one pair of Industrial shoe to his employee. The samples of Uniform & Shoe shall be got approved by the Garrison Engineer/Engr-in-Charge before procurement.
(vi) Necessary hand tools & safety equipment as listed below to be provided to the operator, which shall be handed over to next operator after completion of every shift. a) Pipe Wrench 12"-01 No b) Adjustable Spanner 8" - 01 No c) Screw Driver 12" - 01 No d) Hammer 500 gm - 01 No e) LED Torch rechargable - 01 No. The cost of above said necessary hand tools and safety equipment to be borne by the contractor and necessary amount shall deemed to be included in the unit rate quoted. (vii) Mobile phone to be provided for emergency communication to concerned JE/AGE. The same shall be handed over to next operator after completion of each shift. Cost of mobile phone to be borne by the contractor and necessary amount shall be included in the unit rate quoted by him. (No smart phone/ camera phone is allowed inside the AFA Campus for security point of view. Only simple bar phone shall have to be provided)
Manitenance and Operation of water supply distribution installations by operating valves of incoming and out going pipe lines of any size at OH reservoir 'B' at AFA and connected borewells in two shifts with 01 Operator (FGM) per shift, each shift of 08 hours, including Sundays and holidays, including maintenance and operation of connected Chlorine plants, BP dozers, LT Panel board etc all as directed by Engineer-in-Charge.
NOTE (i) Shift timing :- First shift 0400 hrs to 1200 hrs Second shift 1200hrs to 2000hrs, Suitable Reliver to be employed during weekly offs/Sundays/Leave/Holidays. (ii) One FGM shall be employed in each shift for the above distribution/maintenance and operation work. (iii) The entire surrounding area shall be cleaned & maintained well as directed by Engineer-in-Charge. (iv) Necessary printed Log sheet as per prescribed performa shall be provided by the contractor for which the rate shall be deemed to be included in the quoted rate. (v) The contractor shall provide minimum two pairs of uniform duly printed with the company name in the shirts and one pair of Industrial shoe to his employee. The samples of Uniform & Shoe shall be got approved by the Garrison Engineer/Engr-in-Charge before procurement.
(vi) Necessary hand tools & safety equipment as listed below to be provided to the operator, which shall be handed over to next operator after completion of every shift. a) Pipe Wrench 12"-01 No b) Adjustable Spanner 8" - 01 No c) Screw Driver 12" - 01 No d) Hammer 500 gm - 01 No e) LED Torch rechargable - 01 No. The cost of above said necessary hand tools and safety equipment to be borne by the contractor and necessary amount shall deemed to be included in the unit rate quoted. (vii) Mobile phone to be provided for emergency communication to concerned JE/AGE. The same shall be handed over to next operator after completion of each shift. Cost of mobile phone to be borne by the contractor and necessary amount shall be included in the unit rate quoted by him. (No smart phone/ camera phone is allowed inside the AFA Campus for security point of view. Only simple bar phone shall have to be provided)
Maintenance & Operation of water supply by operating valves of incoming and out going area including OH Reservoir 'C' & 'D' in two shifts with 01 Operator(FGM) per shift, each shift of 08 hours, including Sundays and holidays, by employing the manpower for operation of connected Bore wells, Chlorine plants, BP dozers including LT Panel board and connecting items such as operation of sluice valves of any size all as directed by Engineer-in-Charge.
NOTE (i) Shift timing :- First shift 0600hrs to 1400 hrs Second shift 1400hrs to 2200hrs (ii) One FGM shall be employed in each shift for the above distribution/maintenance and operation work. (iii) The entire surrounding area shall be cleaned & maintained well as directed by Engineer-in-Charge. (iv) Necessary printed Log sheet as per prescribed performa shall be provided by the contractor for which the rate shall be deemed to be included in the quoted rate. (v) The contractor shall provide minimum two pairs of uniform duly printed with the company name in the shirts and one pair of Industrial shoe to his employee. The samples of Uniform & Shoe shall be got approved by the Garrison Engineer/Engr-in-Charge before procurement.
(vi) Necessary hand tools & safety equipment as listed below to be provided to the operator, which shall be handed over to next operator after completion of every shift. a) Pipe Wrench 12"-01 No b) Adjustable Spanner 8" - 01 No c) Screw Driver 12" - 01 No d) Hammer 500 gm - 01 No e) LED Torch rechargable - 01 No. The cost of above said necessary hand tools and safety equipment to be borne by the contractor and necessary amount shall deemed to be included in the unit rate quoted. (vii) Mobile phone to be provided for emergency communication to concerned JE/AGE. The same shall be handed over to next operator after completion of each shift. Cost of mobile phone to be borne by the contractor and necessary amount shall be included in the unit rate quoted by him. (No smart phone/ camera phone is allowed inside the AFA Campus for security point of view. Only simple bar phone shall have to be provided)
Allied Constructions
S J REDDY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .