| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC VILLAGE KAIYARDA PO MISHERWALA TEHSIL PAONTA SAHIB DISTT SIRMOUR HP 173021 | PAONTA SAHIB | SIRMOUR | HIMACHAL PRADESH | 173021 | ₹2.2 L | L1 | Accepted-AOC Aoc |
| 2 | L2₹2.8 L+₹60,402 (27.3%)Rejected-Finance VILLAGE GASSOUR P O JUKHALA TEHSIL SADAR DISTT BILASPUR HP | BILASPUR | HIMACHAL PRADESH | 174001 | ₹2.8 L+₹60,402 (27.3%) | L2 | Rejected-Finance Reject |
| 3 | L3₹2.8 L+₹62,668 (28.4%)Rejected-Finance | ₹2.8 L+₹62,668 (28.4%) | L3 | Rejected-Finance Reject |
| 4 | L4₹2.9 L+₹64,799 (29.3%)Rejected-Finance | ₹2.9 L+₹64,799 (29.3%) | L4 | Rejected-Finance Reject |
| 5 | L5₹2.9 L+₹70,491 (31.9%)Rejected-Finance VILLAGE DUBOR P O TIMBI TEHSIL SHILLAI DISTRICT SIRMOUR H P | TIMBI | SIRMOUR | HIMACHAL PRADESH | 173027 | ₹2.9 L+₹70,491 (31.9%) | L5 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Bhopinder Singh L4 | Surender Singh L5 | Dinesh Kumar Govt Contractor L2 | HOMINDER SINGH L3 | DINESH KUMAR L7 | KULBHUSHAN CHAUHAN L6 | MAMTA L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth upto all leads and lifts. Disposing earth to be levelled and neatly dressed pick jumper work within all leads and lifts and as directed by the Engineer-in-charge. | 25.66 | Cum. | 425 ₹10,906 | 250 ₹6,415 | 310 ₹7,955 | 160 ₹4,106 | 215 ₹5,517 | 400 ₹10,264 | 100 ₹2,566 Lowest |
| 2.00 | Providing & Laying cement concrete 1:6:12(1ccement :6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth in all leads and lifts as per the directions of the Engineer in charge. | 8.46 | Cum. | 5,200 ₹43,992 | 64 ₹541 Lowest | 5,200 ₹43,992 | 4,650 ₹39,339 | 6,300 ₹53,298 | 6,000 ₹50,760 | 4,200 ₹35,532 |
| 3.00 | Providing and laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40 mm nominal size ) with 15% plum concrete and curing complete excluding cost of form work in retaining walls/breast walls,the size of plums shall usually be 150 mm to 300 mm as per H.P.P.W.D Specification. | 32.4 | Cum. | 5,700 ₹1,84,680 | 7,400 ₹2,39,760 | 5,700 ₹1,84,680 | 6,300 ₹2,04,120 | 6,400 ₹2,07,360 | 5,500 ₹1,78,200 | 5,200 ₹1,68,480 Lowest |
| 4.00Providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooded battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads aand lifts as per the direction of the Engineer in Charge. | ||||||||||
| 4.01 | i) Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttress, plinth and string couress and the like. | 144.54 | Cum. | 320 ₹46,253 | 310 ₹44,807 | 310 ₹44,807 | 250 ₹36,135 | 310 ₹44,807 | 400 ₹57,816 | 100 ₹14,454 Lowest |
Tender Value
₹3.7 L
EMD Value
₹7,473
Closing Date
24 Sept 2025, 11:00 amClosed
EE Nerwa
EE Nerwa
SH CO Protection work at back side of approach raid to EE Office RD 0to80and 0to140etc Under CRF
2025_HPIPH_115024_1
JSV-ND-CB-Ten/2025/4398-4447
Open Tender
Civil Works
Item Wise
30 days
JSV Division Nerwa
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
EE Nerwa
₹7,473
9 Jun 2026
17 Sept 2025
24 Sept 2025
17 Sept 2025
24 Sept 2025
17 Sept 2025
Amount
Excavation in earth work and disposal of all excavated earth upto all leads and lifts. Disposing earth to be levelled and neatly dressed pick jumper work within all leads and lifts and as directed by the Engineer-in-charge.
Providing & Laying cement concrete 1:6:12(1ccement :6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth in all leads and lifts as per the directions of the Engineer in charge.
Providing and laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40 mm nominal size ) with 15% plum concrete and curing complete excluding cost of form work in retaining walls/breast walls,the size of plums shall usually be 150 mm to 300 mm as per H.P.P.W.D Specification.
Providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooded battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads aand lifts as per the direction of the Engineer in Charge.
i) Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttress, plinth and string couress and the like.
Dinesh Kumar Govt Contractor (BID ID -558827)
HOMINDER SINGH (BID ID -560395)
Bhopinder Singh (BID ID -560369)
Surender Singh (BID ID -559658)
KULBHUSHAN CHAUHAN (BID ID -560376)
DINESH KUMAR (BID ID -559917)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .