Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A1526 1527 GREENFIELDS COLONY FARIDABAD HARYANA 121001 | FARIDABAD | FARIDABAD | HARYANA | 121001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹11.3 L
EMD Value
₹12,000
Closing Date
10 Jun 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
400 KV S/S Sarnath Varanasi
Work
2025_UPTCL_1037818_2
Very Short Term E-Tender No. 08 ETC-II(VNS)/2025-26
Open Tender
Electrical Works
Piece-work
30 days
Ghazipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD GHAZIPUR
₹12,000
19 Jun 2025
22 May 2025
11 Jun 2025
22 May 2025
10 Jun 2025
22 May 2025
Amount
Erection, commissioning and testing of SPS at 400kV Substation Jaunpur .The job includes laying of Fiber optic cable and its termination with proper size of Glands & ferrulling ,erection of RTU ,Transducer ,OFC patch cord etc alongwith other related material and equipments for SPS and to intregrate with existing GE make SPS system to complete the job satisfactory in all respect.
Erection and Commissioning material are attached
Fully wired standalone panel with required accessories, design & engineering and 48 V DC Power supply with the following electronics:
19 RTU Rack
RTU E70 16 I/O-slot backplane for 19" subrack
RTU E70 Rack Power Supply Unit
RTU E70 CPU, 2 LAN, 4 Serial ports
RTU E70 Digital Input Module, Pos Logic, 48VDC
RTU E70 Analog Input Module, 12 ch, Voltage/Current input
RTU E70 Digital Output Module, 16 ch(2 groups of 8), relay output
Heavy Duty Relay in RTU panel
Timer relay for watch dog
Hooter for Watch Dog
Power Supply 220 VDC input to 48 VDC output
Transducer internal Wiring and Communication cables
4-20 mA signat cable for Transducer output from C&R Panels of Line GT-1 & BT-2 to PLC 3 core stranded copper (0.5mm2) Armoured (shielded)
Digital Input Cable to PLC fur Main The Breaker Status of GT-1, GT 2, Obra-c to Obra-b line 5 Core Standard Copper Cable 1.5 mm2, Armoured
Digital Output Cable from RTU Panel to DCS 6 core (2.5mm2) standard copper armoured cable
220 VAC/VOC Power Supply Cable from 220 VDC source to RTU 3 Core (2.5mm2) standard copper armoured cable
Transducer CT Input (R,Y,B Phase) cable in C&R Panels & Feeders single core wire (2.5 mm2)
Transducer Power Supply Single core wire (1.5mm2)
LAN Cable between RTU and Computer (CAT6)
OFC Patch Cords and LIU's
Supply of 6 Core Outdoor Armoured Fiber Optic Cable, Single Mode
Supply of HDPE Pipe, 40mm Dia
Supply of 6 Port LIU with fully populated
Supply OFC PATCH Cords (each 5 mtr)
Supply of Fiber to Ethernet Media Converter
PLC Programming Software
SCADA Software with license and Server grade computer of minimum configuration as Intel Xeon CPU 4core, 2.80 Ghz, 16 GB main memory, 1 TB SATA HDD, 19.5 inch colot TFT monitor, Key Board, Mouse, 2 Nos. 10/100/1000 mbps Ethernet port, USB Port, 600VA UPS, AC Power Extension Board, Server 2022 (Furniture supply under the scoper of contractor)
Current Transducer
3 Phase Current Transducer 220VDC, 4-20mA Output, Class-0.2, CTR- 5A, Auxillary Supply - 220 VDC (Make: AEL/Pyrotech/Elster)
Design and Drawing
Shifting of all SPS material (including loading and unloading ) from Robertsganj store to 400 KV Obra C site (around 40 km) and then shifting all material to erection and commisioning place in 400 KV OBRA C switchyard
Erection,commissioning and testing of SPS at Obra 'C' end .The job includes laying of Fiber optic cable and its termination with proper size of Glands & ferrulling ,erection of RTU ,Transducer ,OFC patch cord etc alongwith other related material and equipments for SPS and to intregrate with existing GE make SPS system to complete the job satisfactory in all respect .
Erection and Commissioning material are attached
Fully wired standalone panel with required accessories, design & engineering and 48 V DC Power supply with the following electronics:
19 RTU Rack
RTU E70 16 I/O-slot backplane for 19" subrack
RTU E70 Rack Power Supply Unit
RTU E70 CPU, 2 LAN, 4 Serial ports
RTU E70 Digital Input Module, Pos Logic, 48VDC
RTU E70 Analog Input Module, 12 ch, Voltage/Current input
RTU E70 Digital Output Module, 16 ch(2 groups of 8), relay output
Heavy Duty Relay in RTU panel
Timer relay for watch dog
Hooter for Watch Dog
Power Supply 220 VDC input to 48 VDC output
Transducer internal Wiring and Communication cables
4-20 mA signat cable for Transducer output from C&R Panels of Line GT-1 & BT-2 to PLC 3 core stranded copper (0.5mm2) Armoured (shielded)
Digital Input Cable to PLC fur Main The Breaker Status of GT-1, GT 2, Obra-c to Obra-b line 5 Core Standard Copper Cable 1.5 mm2, Armoured
Digital Output Cable from RTU Panel to DCS 6 core (2.5mm2) standard copper armoured cable
220 VAC/VOC Power Supply Cable from 220 VDC source to RTU 3 Core (2.5mm2) standard copper armoured cable
Transducer CT Input (R,Y,B Phase) cable in C&R Panels & Feeders single core wire (2.5 mm2)
Transducer Power Supply Single core wire (1.5mm2)
LAN Cable between RTU and Computer (CAT6)
OFC Patch Cords and LIU's
Supply of 6 Core Outdoor Armoured Fiber Optic Cable, Single Mode
Supply of HDPE Pipe, 40mm Dia
Supply of 6 Port LIU with fully populated
Supply OFC PATCH Cords (each 5 mtr)
Supply of Fiber to Ethernet Media Converter
PLC Programming Software
SCADA Software with license and Server grade computer of minimum configuration as Intel Xeon CPU 4core, 2.80 Ghz, 16 GB main memory, 1 TB SATA HDD, 19.5 inch colot TFT monitor, Key Board, Mouse, 2 Nos. 10/100/1000 mbps Ethernet port, USB Port, 600VA UPS, AC Power Extension Board, Server 2022 (Furniture supply under the scoper of contractor)
Current Transducer
3 Phase Current Transducer 220VDC, 4-20mA Output, Class-0.2, CTR- 5A, Auxillary Supply - 220 VDC (Make: AEL/Pyrotech/Elster)
Design and Drawing
Shifting of all SPS material (including loading and unloading ) from Robertsganj store to 400 KV Obra C site (around 40 km) and then shifting all material to erection and commisioning place in 400 KV OBRA C switchyard
M/S SYNERGY SYSTEMS & SOLUTIONS (BID ID -5218985)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .