Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 4863 DUKLI AGARTALA WEST TRIPURA PIN 799004 | WEST TRIPURA | TRIPURA | 799004 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
13 Jul 2022, 6:00 pmClosed
Chief Engineer, Jal Shakti (
office chamber of the Chief Engineer, Jal Shakti (PHE) Department, Jammu
Construction of 200 mm Dia. Production Bore Wells by ODEX Method for 70 Water Supply Schemes (133 Nos. Location) in District Kathua
2022_PHE_176841_6
e-NIT No. PHEJ/JJM/211 of 2022-23
Open Tender
Drilling Works
Item Rate
70 days
as per tender documents
as per tender documents
9 documents required · 9 mandatory
₹1,000
CAO, Jal Shakti (PHE) Department Jammu
₹50,000
office chamber of the Chief Engineer, Jal Shakti (
3 Oct 2022
30 Jun 2022
14 Jul 2022
30 Jun 2022
13 Jul 2022
6 Jul 2022
4 Jul 2022
Amount
Deep Drilling and Development of 02 Nos 200mm dia. Bore Wells by ODEX Method at (i) Dorsi-I (ii) Dorsi-II in Kathua District under JJM.
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 02 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 02 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 02 Nos 200mm dia. Bore Wells by ODEX Method at (i) Kah-I (ii) Kah-II in Kathua District under JJM.
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 02 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 02 Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 02 Nos 200mm dia. Bore Wells by ODEX Method at (i) Kandhrnoo-I (ii) Kandhrnoo-II in Kathua District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 02 Nos.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 02Nos.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200mm dia. Bore Well by ODEX Method at Jakhbar in Kathua District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 No.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 No.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200mm dia. Bore Well by ODEX Method at Kathera in Kathua District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 No.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 No.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200mm dia. Bore Well by ODEX Method at Khokhyal in Kathua District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 No.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 No.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200mm dia. Bore Well by ODEX Method at Mangtian in Kathua District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 No.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 No.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200mm dia. Bore Well by ODEX Method at Porth in Kathua District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 No.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 No.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling and Development of 01 No. 200mm dia. Bore Well by ODEX Method at Seswan in Kathua District under JJM
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling 200mm dia. Bore Well, 120 meter below ground level or till sufficient aquifer Zone/discharge is encountered, by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately) (No. of bore wells under the WSS = 01 No.)
Supplying, assembly (including welding), lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel beveled ended 200mm dia. casing pipes, conforming to IS: 4270 of reputed and approved make, including painted with outside surface with two coats, of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths, as per direction of Engineer-in-charge. Detail of specification of pipe is reflected at Annexure “A”. The cost includes transportation, loading, unloading and stacking/handling at site all complete. (No. of bore wells under the WSS = 01 No.)
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level &draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
M/S SHREE BAJRANG BALI CONTRACT COMPANY
shri ganesh construction company
Mamta Boring co
Tawi Drillers
M/s Shiv Drillers & Allied Traders
Expert Drillers
shri ganesh construction company
Mamta Boring co
Tawi Drillers
M/s Shiv Drillers & Allied Traders
Expert Drillers
M/S VIJAY LAXMI RIGS
shri ganesh construction company
Mamta Boring co
M/s Shiv Drillers & Allied Traders
Expert Drillers
M/S VIJAY LAXMI RIGS
Tawi Drillers
M/s Shiv Drillers & Allied Traders
M/S SHREE BAJRANG BALI CONTRACT COMPANY
shri ganesh construction company
Mamta Boring co
Tawi Drillers
Expert Drillers
M/S SHREE BAJRANG BALI CONTRACT COMPANY
Mamta Boring co
shri ganesh construction company
Tawi Drillers
Expert Drillers
M/S VIJAY LAXMI RIGS
shri ganesh construction company
Expert Drillers
Mamta Boring co
Tawi Drillers
M/s Shiv Drillers & Allied Traders
M/S VIJAY LAXMI RIGS
shri ganesh construction company
Mamta Boring co
Tawi Drillers
M/s Shiv Drillers & Allied Traders
Expert Drillers
M/S VIJAY LAXMI RIGS
shri ganesh construction company
Mamta Boring co
Tawi Drillers
M/s Shiv Drillers & Allied Traders
Expert Drillers
M/S VIJAY LAXMI RIGS
M/S SHREE BAJRANG BALI CONTRACT COMPANY
shri ganesh construction company
M/s Shiv Drillers & Allied Traders
Mamta Boring co
Expert Drillers
M/S VIJAY LAXMI RIGS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .