| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAccepted-AOC NO 10 19 RESIDENCY APARTMENT BAWA ROAD ALWARPET CHENNAI 600018 | CHENNAI | TAMIL NADU | 600018 | ₹9.9 Cr Quoted ₹10.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹10.6 CrRejected-Finance NO 07 CENTRAL STREET KILPAUK GARDEN COLONY CHENNAI 600010 | CHENNAI | TAMIL NADU | 600010 | ₹10.6 Cr | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | EMJAY CONSTRUCTIONS L2 | M CUBE INFRA L1 |
|---|---|---|---|---|---|
| 1.00 | Removal of sludge, slush, silt, debris, plastic waste,water weeds, using appropriate special machineries like dredger along the cutter section having maximum capacity of 300cum solids per hour which can dredge to a maximum of 8.00m depth and dispose the dredged material to a maximum of 4Km on either one of the outer slope of river banks whichever is convenient as per the prevailing site conditions for easy conveyance and jungle clearance by pumping operation along with suitable pipeline and other required accessories with other mechanical devices for the entire stretch to reach the bank. the rates including cost of transportation, Mobilization and demobilization of machinery, hire charges, cost of fuel, labour charges for surveying and operation of dredger, crew and other related works etc. | 1,12,534.5 | m³ | 570 ₹6.4 Cr | 550 ₹6.2 Cr |
| 2.00 | Formation of Bedding Layer for rubble mound Breakwater with quarry run hard blue granite stone of weight 1 Kg to 10kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 2.00 on both sides with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 1,401 | MT | 1,175 ₹16.5 L | 1,150 ₹16.1 L |
| 3.00 | Formation of core layer for rubble mound Breakwater with quarry run hard blue granite stone of weight 10Kg- 300Kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading, transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 2.00 on both sides with necessary equipment and devices as per the drawing and specification etc., complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational changes of tools and plants etc. ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 11,129 | MT | 1,175 ₹1.3 Cr | 1,150 ₹1.3 Cr |
| 4.00 | Formation of Armour Layer for rubble mound Breakwater with hard blue granite stone of weight ranging from upto 2T having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 2 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 6,953 | MT | 1,250 ₹86.9 L | 1,300 ₹90.4 L |
| 5.00 | Formation of Toe Berm Layer for rubble mound Breakwater with hard blue granite stone of weight ranging from upto 1T having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 2 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 2,175 | MT | 1,200 ₹26.1 L | 1,200 ₹26.1 L |
| 6.00 | Sub Total Amount for above all items (excluding GST) | 1 | No | 0 ₹9.0 Cr | 0 ₹8.8 Cr |
| 7.00 | GST 18% for above SubTotal Amount | 1 | gst | 0 ₹1.6 Cr | 0 ₹1.6 Cr |
Tender Value
₹9.9 Cr
EMD Value
₹5.1 L
Closing Date
5 Feb 2026, 3:00 pmClosed
Chief Engineer
Fishing Harbour Project Circle Fisheries and Fishermen Welfare Department Chennai-35
Temporary restoration works for dredging the River barmouth, and Repair works to the damaged approach roads and Wharf at Vembar Fish Landing Centre in Thoothukudi District.
2026_AHDF_647890_1
20 DB F.114 N 2026 Dated 21.01.2026
Open Tender
Civil Works
360 days
Vembar in Thoothukudi District
As mentioned in documents
4 documents required · 4 mandatory
₹0
₹5.1 L
Yes
9 Mar 2026
28 Jan 2026
6 Feb 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
Removal of sludge, slush, silt, debris, plastic waste,water weeds, using appropriate special machineries like dredger along the cutter section having maximum capacity of 300cum solids per hour which can dredge to a maximum of 8.00m depth and dispose the dredged material to a maximum of 4Km on either one of the outer slope of river banks whichever is convenient as per the prevailing site conditions for easy conveyance and jungle clearance by pumping operation along with suitable pipeline and other required accessories with other mechanical devices for the entire stretch to reach the bank. the rates including cost of transportation, Mobilization and demobilization of machinery, hire charges, cost of fuel, labour charges for surveying and operation of dredger, crew and other related works etc.
Formation of Bedding Layer for rubble mound Breakwater with quarry run hard blue granite stone of weight 1 Kg to 10kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 2.00 on both sides with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
Formation of core layer for rubble mound Breakwater with quarry run hard blue granite stone of weight 10Kg- 300Kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading, transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 2.00 on both sides with necessary equipment and devices as per the drawing and specification etc., complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational changes of tools and plants etc. ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
Formation of Armour Layer for rubble mound Breakwater with hard blue granite stone of weight ranging from upto 2T having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 2 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
Formation of Toe Berm Layer for rubble mound Breakwater with hard blue granite stone of weight ranging from upto 1T having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 2 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
Sub Total Amount for above all items (excluding GST)
GST 18% for above SubTotal Amount
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Cover1.pdf
Tender Documents • 0.86 MB
Cover2.pdf
Additional Documents • 1.25 MB
BOQ_776759.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid