| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC 11 | VIRUDHUNAGAR | TAMIL NADU | 626202 | ₹13.8 L | L1 | Accepted-AOC accept |
| 2 | L2₹14.0 LRejected-AOC | ₹14.0 L | L2 | Rejected-AOC reject |
| Sl No | Description | Qty | Unit | Ranjithkumar contractor L2 | Madasamy L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 36.55 | M3 | 230 ₹8,406.50 | 220 ₹8,041 |
| 2.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 3.6 | M3 | 110 ₹396 | 100 ₹360 |
| 3.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 3.1 | M3 | 1,690 ₹5,239 | 1,680 ₹5,208 |
| 4.00 | Plain Cement Concrete 1:4:8 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 7.5 | M3 | 5,340 ₹40,050 | 5,330 ₹39,975 |
| 5.00 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 23 | M3 | 495 ₹11,385 | 489 ₹11,247 |
| 6.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) Column | 53 | M2 | 1,230 ₹65,190 | 1,227 ₹65,031 |
| 6.20 | Beam | 33 | M2 | 1,030 ₹33,990 | 1,023 ₹33,759 |
| 6.30 | Slab | 56 | M2 | 1,030 ₹57,680 | 1,023 ₹57,288 |
| 7.00 | Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). | 18.5 | M3 | 8,330 ₹1.5 L | 8,327 ₹1.5 L |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1,665 | Kg | 95 ₹1.6 L | 89.7 ₹1.5 L |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
24 Sept 2025, 3:00 pmClosed
commissioner
Tiruchendur Municipality
Construction of Kitchen shed at Tirukkudumba Middle School in Alanthalai in Tiruchendur Municipality
2025_MAWS_596869_2
2098/2025/E1
Open Tender
Civil Works
90 days
TIRUCHENDUR Municipality
please refer to tender notice
2 documents required · 2 mandatory
₹0
₹17,000
Yes
10 May 2026
17 Sept 2025
24 Sept 2025
17 Sept 2025
24 Sept 2025
17 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_723341.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid