Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC | ₹23.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹24.5 LRejected-Finance A 247 SECTOR 19 NOIDA G B NAGAR | ₹24.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹24.7 LRejected-Finance | ₹24.7 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
Updated dates
Tender Value
₹24.8 L
EMD Value
₹49,600
Closing Date
24 Nov 2025, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of boundary wall of J.H.S school at village-wailana YEA WC-06
2025_YEIDA_1083328_11
YEA/GM(PROJECT)/2025/432 DT-16/10/2025
Open Tender
Civil Works
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹840
₹49,600
7 Apr 2026
29 Oct 2025
25 Nov 2025
29 Oct 2025
24 Nov 2025
29 Oct 2025
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 Sq.M on plan) including dressing of sides and ramming ob bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a load of 50m
Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work
Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc.for mass concrete.
Centring and shuttering including strutting, propping etc. and removal of form for:Lintels, beams, plinth beams, girders, bressumer sand cantilevers.
Centring and shuttering including strutting, propping etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement: All work above plinth level upto floor V level
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete uoto plinth level. Thermo Mechanically Treated bars
M-150 brick work in 1:6 cement & fine sand 1.25F.M mortar in foundation and plinth including supply of all materials labour complection of the work but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305a UPPWD SOR 305a
M-150 brick work in 1:6 cement & fine sand 1.25F.M mortar Above plinth including supply of all materials labour complection of the work but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305b UPPWD SOR 305a
12mm cement plaster of mix 1:6 (1 cement: 6 coarse sand)
Finishing wall with water proofing cement paint of required shade: New work (Two or more coats applied 3.84 kg/b sqm) Based on uppwd sor
Earth work in rough excavation, banking, earth in layers not exceeding 20cm in depth clods watering rolling each layers with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layers with power roller of minimum 8 tonnes and dr
stage.html
html • 0.05 MB
techsummary_1992458.pdf
BOQ Comparative Chart
xlsx
finsummary_1992458.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
11.pdf
Tender Documents • 1.25 MB
BOQ_1992458.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid