Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAdmitted-Finance | ₹7.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.4 Cr+₹1.4 Cr (20.0%)Admitted-Finance C 5 2ND FLOOR R K TOWER PLOT NO 21 22 SECTOR 04 VAISHALI GHAZIABAD 201012 MOB 8377811395 | ₹8.4 Cr+₹1.4 Cr (20.0%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Chaitanya Projects Consultancy Private Limited L2 | URS Scott Wilson India Private Limited L1 |
|---|---|---|---|---|---|
| 1.00Remuneration for Local Staff (inclusive of per Diem allowance) | |||||
| 1.01 | Team Leader Cum Senior Highway Engineer (1 No) 1*18=18 | 18 | Man Months | 2,85,000 ₹51,30,000 | 1,90,000 ₹34,20,000 Lowest |
| 1.02 | Bridge /Structural Engineer(1No)1*18=18 | 18 | Man Months | 2,14,000 ₹38,52,000 | 1,20,000 ₹21,60,000 Lowest |
| 1.03 | Resident cum Highway Engineer (2 No) 2*18+1*60=96 | 96 | Man Months | 2,28,000 ₹2,18,88,000 | 1,17,500 ₹1,12,80,000 Lowest |
| 1.04 | Senior Quality cum Material Expert (1 No)
(1*18)=18 | 18 | Man Months | 2,00,000 ₹36,00,000 | 1,10,000 ₹19,80,000 Lowest |
| 1.05 | Road Safety Expert (1 Nos)
1*6=6 | 6 | Man Months | 1,00,000 ₹6,00,000 | 60,000 ₹3,60,000 Lowest |
| 1.06Sub-Professional Staff | |||||
| 1.07 | Survey Engineer (2 No)
(2*18)=36 | 36 | Man Months | 53,000 ₹19,08,000 Lowest | 55,000 ₹19,80,000 |
| 1.08 | Assistant Bridge Engineer (2 Nos)
(2*18)=36 | 36 | Man Months | 90,000 ₹32,40,000 | 50,000 ₹18,00,000 Lowest |
| 1.09 | Lab Technician (2 No)
(2*18)=36 | 36 | Man Months | 45,000 ₹16,20,000 Lowest | 50,000 ₹18,00,000 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
22 Dec 2022, 3:00 pmClosed
K C Bhatt
NHIDCL HQ, New Delhi
CS as AE for Supervision of Four laning of Jhanji to Demow, 4-laning of NH-37 Section between Demow to End of Moran Bypass, Four laning of NH-37 from end of Moran Bypass to Bogibeel junction Dibrugarh Bypass/ Realignment in the state of Assam
2022_NHIDC_726347_1
NHIDCL/Assam/AE/Jhanji- Dibrugarh/2022/208578
Open Tender
Civil Works
Item Rate
2372 days
Assam
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ, New Delhi
1 Mar 2023
29 Nov 2022
23 Dec 2022
29 Nov 2022
22 Dec 2022
15 Dec 2022
29 Nov 2022 - 8 Dec 2022
10 Dec 2022
Amount
Remuneration for Local Staff (inclusive of per Diem allowance)
Team Leader Cum Senior Highway Engineer (1 No) 1*18=18
Bridge /Structural Engineer(1No)1*18=18
Resident cum Highway Engineer (2 No) 2*18+1*60=96
Senior Quality cum Material Expert (1 No) (1*18)=18
Road Safety Expert (1 Nos) 1*6=6
Sub-Professional Staff
Survey Engineer (2 No) (2*18)=36
Assistant Bridge Engineer (2 Nos) (2*18)=36
Lab Technician (2 No) (2*18)=36
Quantity Surveyor (2 No) (2*18+ 1*60)=96
Support Staff (inclusive of per diem allowance)
Office Manager cum Accountant (2 No) (2*18+ 1*60)=96
Accountant cum Cashier (1 No) (2*18+ 1*60)=96
Steno cum Computer Operator (1 No) (2*18+ 1*60)=96
Office Boy (1 No) (2*18+ 1*60)=96
Transportation (Fixed Costs)
Bolero or equivalent (not more than 2 years old) (3 nos during Construction Period), 3*18 Rate per month
Innova/scorpio or equivalent (not more than 2 years old) (1 nos during Maintenance period/DLP), 1*60=60 Rate per month
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
For round trip to Employer's Head Office
For round trip to Employer's regional office.
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
During Construction period (2 Nos) 2*18=36
During Maintenance /DLP period (1 No) 1*60=60
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
Office Supplies during construction period for 2 offices 2*18=36
Office Supplies during Maintenance /DLP period for 1 office 1*60=60
Drafting Supplies during construction period for 2 offices 2*18=18
Drafting Supplies during Maintenance /DLP period for 1 office 1*60=60
Computer Running Costs during construction period for 1 offices 2*18=36
Computer Running Costs during Maintenance /DLP period for 1 office 1*60=60
Domestic and International Communication during construction period for 2 offices 2*18=36
Domestic and International Communication during Maintenance /DLP period for 1 office 1*60=60
Office Furniture and Equipment (Rental) Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.,
During Construction period for 2 nos of offices 2*18=36
During Maintenance /DLP period for 1 no of office 1*60=60
Reports and Document Printing ( rate as per copy)
Monthly reports (Design and Construction)
Half yearly Reports
Various others reports as provided in the Concession Agreement such as Completion Report
Road Survey Equipment
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Bridge inspection using Mobile Bridge Inspection Unit
Road signs inspection using Retro Reflectometer
Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
Chaitanya Projects Consultancy Private Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .