Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95,744Accepted-AOC 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT. | 1 | Nos | 24,502 ₹24,502 Lowest |
| 2.00 | Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-A & B. | 1 | Nos | 12,250 ₹12,250 Lowest |
| 3.00 | Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT. | 1 | Nos | 26,410 ₹26,410 Lowest |
| 4.00 | Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP. | 1 | Nos | 8,803 ₹8,803 Lowest |
| 5.00 | Charges for Inspection and checking tightness of generator Phase & Neutral side links. | 1 | Nos | 8,803 ₹8,803 Lowest |
| 6.00 | Charges for Complete cleaning washing of Generating Transformer-1 LAS porcelain housings, support insulators, HV Bushings, radiator banks & UAT 1A, 1B | 1 | Nos | 12,440 ₹12,440 Lowest |
| 7.00 | CRC 500ml | 2 | Nos | 400 ₹800 Lowest |
| 8.00 | Cost of consumables ( Lumsum) | 1 | Nos | 1,570 ₹1,570 Lowest |
Tender Value
Refer Docs
Closing Date
12 May 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES EM-I Division Unit-I Dismantling of HT LT Terminal links of Generator Transformer-I, UAT IA UAT IB for conducting statutory testing of TG GT-I and internal cleaning, checking tightness healthiness of supporting insulators in 15.75 KV Bus
2025_EB_551802_1
CE-MTPS-I-SE-ES-EM-I-OT 17-2025-26
Open Tender
Electrical Works
Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
Yes
11 Mar 2026
26 Apr 2025
13 May 2025
26 Apr 2025
12 May 2025
26 Apr 2025
26 Apr 2025 - 12 May 2025
Amount
Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT.
Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-A & B.
Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT.
Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP.
Charges for Inspection and checking tightness of generator Phase & Neutral side links.
Charges for Complete cleaning washing of Generating Transformer-1 LAS porcelain housings, support insulators, HV Bushings, radiator banks & UAT 1A, 1B
CRC 500ml
Cost of consumables ( Lumsum)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .