Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹56.0 LAccepted-Finance | ₹56.0 L | 1st | Accepted-Finance lowest |
| 2 | 1st₹56.4 LRejected-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹56.4 L | 1st | Rejected-Finance not lowest |
| 3 | 3rd₹56.8 LRejected-Finance | ₹56.8 L | 3rd | Rejected-Finance not lowest |
| Sl No | Description | Qty | Unit | RAKESH KUMAR L2 | MUKESH KUMAR CONTRACTOR L1 | SUMAN SAURABH NEGI CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth upto a lead of 20 metres:- P/J Work within all leads and lifts. | 94.95 | cum | 410 ₹38,929.50 | 399.42 ₹37,924.93 | 420 ₹39,879 |
| 2.00 | Excavation in earth work and disposal of excavated earth upto a lead of 20 mtrs and lift upto 1.50 mtrs disposed earth to be levelled and neatly dressed in P/J work. | 70.49 | cum | 510 ₹35,949.90 | 500 ₹35,245 | 520 ₹36,654.80 |
| 3.00Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in: | ||||||
| 3.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillaster buttresses, plinth and string courses and the like with in all leads and lifts. | 256.5 | cum | 610 ₹1.6 L | 600 ₹1.5 L | 620 ₹1.6 L |
| 4.00Prov.and Laying in retaining wall and breast wall 10.0 Kg/cm² working pressure unplastisized P.V.C pipes (confirming to IS 4985-1968) to make weep holes complete including making good the walls. | ||||||
| 4.01 | 100 mm nominal bore. | 257 | Rmt | 400 ₹1.0 L | 390 ₹1.0 L | 410 ₹1.1 L |
| 5.00 | Providing and laying cement concrete 1:5:10 (1 cement : 5 Sand :10 graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of work in retaining walls/ breast walls. the size of plums shall usually be 150mm to300mm as per HPPWD specificatios. | 360.97 | cum | 14,700 ₹53.1 L | 14,600 ₹52.7 L | 14,800 ₹53.4 L |
Tender Value
₹51.9 L
EMD Value
₹1.0 L
Closing Date
5 Feb 2026, 5:00 pmClosed
Executive Engineer
Division Reckong Peo
Construction of Pcc protection wall at Rd 515 to 565
2026_HPIPH_126801_1
KNR-JSD-Peo-EA-I-Tender
Open Tender
Civil Works
365 days
GP Batseri
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Yes
₹1.0 L
17 Feb 2026
28 Jan 2026
6 Feb 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid