| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance 184 SHIV NAGAR COLONY BHANPUR BHOPAL M P | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹4.1 L (3.61%)Admitted-Finance | ₹1.2 Cr+₹4.1 L (3.61%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical All Document not Completed |
| 4 | Rejected-Technical | - | - | Rejected-Technical All Document not Completed |
| Sl No | Description | Qty | Unit | M/S VIRENDRA KUMAR JAIN L1 | PAPPAN ELECTRIC AND GAS WELDING WORKS L2 |
|---|---|---|---|---|---|
| 1.00Description of items and specification of work to be excuted. | |||||
| 1.01 | Providing and fixing double scaffolding system (cup lock
type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m center to center, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 321 | Sqm | 340 ₹1,09,140 Lowest | 1,350 ₹4,33,350 |
| 1.02 | Carefully removal of out of plumb/ hanging / disturbed / stone members from inner core of Shikhara Portion etc by appropriate techniques i.e using Derrik
pole with chain pully including stacking them properly and numbering them etc very carefully to avoid any mishappening and without causing any damage to the
stone members etc complete. | 20.54 | Cum | 5,650 ₹1,16,051 Lowest | 21,000 ₹4,31,340 |
| 1.03 | Carefully dismantling of sunken/ dislodged stone members of mandapa and sourrounding platform of garbha grah etc. complete. | 60.27 | Cum | 6,310 ₹3,80,303.7 Lowest | 11,000 ₹6,62,970 |
| 1.04 | Procurement of new sand stone (hand chiseled surface on both upper and lower side) (0.50x0.40x0.30 /2.00x0.30x0.30) for inner core masonry from Bijoliya Quarry to working site (Phool Devra Temple and Sardev Mata Temple) with transportation charges including loading and unloading etc. complete. Actual size of sand stone blocks will be as per the instruction of site in charge. | 14.24 | Cum | 58,100 ₹8,27,344 Lowest | 96,000 ₹13,67,040 |
| 1.05 | Restoration of inner core masonry of temple with special size sand stone blocks with appropriate techniques i.e. derrick pole and chain pully by experience workers with lime surkhi mortar (1lime : 1 Surkhi: 1 C. Sand) mis with adhesive material like belgiri, jaggery (gud), babool gum
including curing etc. complete | 34.78 | Cum | 12,600 ₹4,38,228 Lowest | 40,000 ₹13,91,200 |
| 1.06 | Making the area workable by removing weeds including uprooting of rank vegetation, grass, brush, wood, trees saplings of girth up to 30cm measured at a height of 1m. Above ground level and removal of
rubbish with all lead and lift outside the periphery of the area cleared etc. complete as per direction given by the engineer in-charge. | 3,472 | Sqm | 18.5 ₹64,232 Lowest | 95 ₹3,29,840 |
| 1.07 | Digging carefully and very slowly and exposing fallen and scattered architectural fragments here and there including sorting out stone member and stack properly in systematic manner over wooden plank etc. complete as per direction provided by engineer in-charge. | 457.65 | Cum | 700 ₹3,20,355 Lowest | 3,000 ₹13,72,950 |
| 1.08 | Procurement and supply at Sardev Mata Temple of fly ash Autoclaved aerated cement (AAC) blocks block size (7"x7"x7" and 24"x8"x8") for using in place of missing architectural fragments during trial assembling and acess the quantum of missing temple architectural members. | 5.97 | Cum | 10,000 ₹59,700 | 9,000 ₹53,730 Lowest |
| 1.09 | Procurement of new stone for veneering of Shikhara portion from Bijolia quarry including transportation from Bijolia quarry to Gangsaw for cutting the stones (size
according to site in-charge) and transportation from gang saw to working site (Sardev Mata Temple and Phool Devra Temple). The blocks shall be dressed and cut in
the traditional shikhara pattern, gradually tapering upwards according to adjoining stone members, and shaped from the bottom and top in such a manner that they interlock and fit securely in position. | 28.66 | Cum | 71,000 ₹20,34,860 Lowest | 88,000 ₹25,22,080 |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
8 May 2026, 4:00 pmClosed
Superintending Archaeologist
Superintending Archaeologist, Archaeological Survey of India, Jaipur Circle, 70/133-140, Patel Marg, Mansarovar, Jaipur-302020
Conservation and restoration of various temples (Phool Devra, Nagadev, Gadia, Sardev Mata) at Atru, Distt. Baran (complete work)
2026_ASI_906834_1
3/115/JPR/2025-26-W-1
Open Tender
Civil Works
Works
270 days
Atru, Distt. Baran
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.3 L
Yes
19 Jun 2026
28 Apr 2026
11 May 2026
28 Apr 2026
8 May 2026
28 Apr 2026
28 Apr 2026 - 8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description of items and specification of work to be excuted. | |||||
| 1.01 | Providing and fixing double scaffolding system (cup lock
type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m center to center, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 321 | Sqm | - | - |
| 1.02 | Carefully removal of out of plumb/ hanging / disturbed / stone members from inner core of Shikhara Portion etc by appropriate techniques i.e using Derrik
pole with chain pully including stacking them properly and numbering them etc very carefully to avoid any mishappening and without causing any damage to the
stone members etc complete. | 20.54 | Cum | - | - |
| 1.03 | Carefully dismantling of sunken/ dislodged stone members of mandapa and sourrounding platform of garbha grah etc. complete. | 60.27 | Cum | - | - |
| 1.04 | Procurement of new sand stone (hand chiseled surface on both upper and lower side) (0.50x0.40x0.30 /2.00x0.30x0.30) for inner core masonry from Bijoliya Quarry to working site (Phool Devra Temple and Sardev Mata Temple) with transportation charges including loading and unloading etc. complete. Actual size of sand stone blocks will be as per the instruction of site in charge. | 14.24 | Cum | - | - |
| 1.05 | Restoration of inner core masonry of temple with special size sand stone blocks with appropriate techniques i.e. derrick pole and chain pully by experience workers with lime surkhi mortar (1lime : 1 Surkhi: 1 C. Sand) mis with adhesive material like belgiri, jaggery (gud), babool gum
including curing etc. complete | 34.78 | Cum | - | - |
| 1.06 | Making the area workable by removing weeds including uprooting of rank vegetation, grass, brush, wood, trees saplings of girth up to 30cm measured at a height of 1m. Above ground level and removal of
rubbish with all lead and lift outside the periphery of the area cleared etc. complete as per direction given by the engineer in-charge. | 3,472 | Sqm | - | - |
| 1.07 | Digging carefully and very slowly and exposing fallen and scattered architectural fragments here and there including sorting out stone member and stack properly in systematic manner over wooden plank etc. complete as per direction provided by engineer in-charge. | 457.65 | Cum | - | - |
| 1.08 | Procurement and supply at Sardev Mata Temple of fly ash Autoclaved aerated cement (AAC) blocks block size (7"x7"x7" and 24"x8"x8") for using in place of missing architectural fragments during trial assembling and acess the quantum of missing temple architectural members. | 5.97 | Cum | - | - |
| 1.09 | Procurement of new stone for veneering of Shikhara portion from Bijolia quarry including transportation from Bijolia quarry to Gangsaw for cutting the stones (size
according to site in-charge) and transportation from gang saw to working site (Sardev Mata Temple and Phool Devra Temple). The blocks shall be dressed and cut in
the traditional shikhara pattern, gradually tapering upwards according to adjoining stone members, and shaped from the bottom and top in such a manner that they interlock and fit securely in position. | 28.66 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
115doc.pdf
Tender Documents • 9.07 MB
BOQ_953165.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .