| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.6 LAccepted-AOC GRAM PO DUDHI SONBHADRA U P | L1 | Accepted-AOC 1st LOwest | |
| 2 | L2₹51.3 L+₹1.6 L (3.32%)Rejected-AOC 11 13 7 TASKAND ROAD CIVIL LINES PRAYAGRAJ | L2 | Rejected-AOC 2nd Lowest | |
| 3 | L3₹55.5 L+₹5.9 L (11.8%)Rejected-AOC | L3 | Rejected-AOC 3rd Lowest |
| Sl No | Description | Qty | Unit | PANKAJ KUMAR GUPTA L1 | a.k. construction L2 | PANDEY ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. for proper completion of the work. | 2,655.1 | Cum | 200 ₹5,31,019.4 | 90 ₹2,38,958.73 Lowest | 301.5 ₹8,00,511.75 |
| 2.00 | Supplying and laying Sand on top & bottom of Pipe including cost of all material, labour, lead and lift, T&P, taxes etc. for proper completion of the work. | 59.12 | Cum | 1,000 ₹59,120 Lowest | 1,390 ₹82,176.8 | 1,000 ₹59,120 Lowest |
| 3.00 | M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. | 285.18 | Cum | 6,100 ₹17,39,585.8 | 6,000 ₹17,11,068 | 5,200 ₹14,82,925.6 Lowest |
| 4.00 | Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. | 40.54 | Cum | 8,000 ₹3,24,328 | 6,900 ₹2,79,732.9 Lowest | 7,200 ₹2,91,895.2 |
| 5.00 | Centering and shuttering for CC/RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work. | 423.98 | Sqm | 350 ₹1,48,392.3 | 300 ₹1,27,193.4 Lowest | 450 ₹1,90,790.1 |
| 6.00 | Cutting, bending, placing and binding of steel reinforcement on Collar Joint of pipe including cost of all labour, material, T&P, M.S. binding wire for proper completion of work. | 3.82 | MT | 71,000 ₹2,71,149 | 70,000 ₹2,67,330 | 68,000 ₹2,59,692 Lowest |
| 7.00 | Providing & Fixing 1200mm. Ø HUME PIPE including cost of all material, labour, T&P etc. required for proper completion of work. | 40 | Rm | 7,000 ₹2,80,000 | 6,500 ₹2,60,000 | 6,300 ₹2,52,000 Lowest |
| 8.00 | Random rubble stone masonery in 1:4 cement (OPC 43 grade) and sand mortar including cost of all material, labour and T&P etc required for proper completion of work. | 239.31 | Cum | 3,500 ₹8,37,578 Lowest | 4,000 ₹9,57,232 | 3,800 ₹9,09,370.4 |
| 9.00 | Struck deep Pointing work for exposed surface of stone masonry in 1:2CM with cement OPC-43 grade, sand etc. including cost of all material, labour and T&P etc required for proper completion of work. | 207.87 | Sqm | 142 ₹29,517.54 | 145 ₹30,141.15 | 130 ₹27,023.1 Lowest |
| 10.00 | Laying of coarse sand in filters including cost of all material, cost of all materials labours carriage T&P lead required for proper completion of work. | 41.53 | Cum | 1,200 ₹49,837.2 Lowest | 2,050 ₹85,138.55 | 1,556 ₹64,622.24 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
22 May 2026, 2:00 pmClosed
Superintending Engineer
Office of Superintending Engineer Kanhar Construction Circle, Pipri Sonbhadra
Construction of Pipe syphon at km. 11.800 of Right Kanhar Canal
2026_UPIDC_1144004_1
01/SE/2026-27
Open Tender
Civil Works
Item Rate
120 days
Village- Humeldoher Tahsil-Duddhi, distt- Sonbhadr
please refer tender documents
2 documents required · 2 mandatory
₹2,360
₹1.5 L
2 Sept 2026
30 Apr 2026
22 May 2026
30 Apr 2026
22 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. for proper completion of the work. | 0.8 | Cum | - | - |
| 2 | Supplying and laying Sand on top & bottom of Pipe including cost of all material, labour, lead and lift, T&P, taxes etc. for proper completion of the work. | 1 | Cum | - | - |
| 3 | M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. | 0.2 | Cum | - | - |
| 4 | Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM³ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mechanical mixing & placing including cost of all labour, material, T&P, roylity and all taxes etc. for proper completion of work. | 1 | Cum | - | - |
| 5 | Centering and shuttering for CC/RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work. | 0.2 | Sqm | - | - |
| 6 | Cutting, bending, placing and binding of steel reinforcement on Collar Joint of pipe including cost of all labour, material, T&P, M.S. binding wire for proper completion of work. | 1 | MT | - | - |
| 7 | Providing & Fixing 1200mm. Ø HUME PIPE including cost of all material, labour, T&P etc. required for proper completion of work. | - | Rm | - | - |
| 8 | Random rubble stone masonery in 1:4 cement (OPC 43 grade) and sand mortar including cost of all material, labour and T&P etc required for proper completion of work. | 0.2 | Cum | - | - |
| 9 | Struck deep Pointing work for exposed surface of stone masonry in 1:2CM with cement OPC-43 grade, sand etc. including cost of all material, labour and T&P etc required for proper completion of work. | - | Sqm | - | - |
| 10 | Laying of coarse sand in filters including cost of all material, cost of all materials labours carriage T&P lead required for proper completion of work. | 1 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.20 MB
Tenderdocument_01.pdf
Tender Documents • 3.70 MB
BOQ_2137288.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .