Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.1 CrAccepted-AOC 2ND FLOOR TRIPTI TOWER GANESHGURI GUWAHATI 05 | KAMRUP METRO | ASSAM | 781001 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹107.5 Cr+₹16.4 Cr (18.0%)Rejected-Finance 14 BILASIPARA P O P S BILASIPARA DIST DHUBRI ASSAM PIN 783348 | BILASIPARA | DHUBRI | ASSAM | 783348 | L2 | Rejected-Finance Rejected | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Shree Gautam Construction Co. Ltd. L2 | HIGH-TECH ECOGREEN CONTRACTORS LLP L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing Road Land :
Clearing and grubbing road land including uprooting wild vegetation, grass,bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of nserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(a) In area of non thorny jungle | 11.34 | sqm | 55,000 ₹6,23,700 | 53,000 ₹6,01,020 Lowest |
| 2.00 | Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201.i) Girth above 300 mm to 600 mm | 2,595 | each | 300 ₹7,78,500 | 200 ₹5,19,000 Lowest |
| 3.00 | Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201.(ii) Girth above 600 mm to 900 mm | 1,800 | each | 550 ₹9,90,000 | 230 ₹4,14,000 Lowest |
| 4.00 | Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201.ii) Girth above 600 mm to 900 mm | 2,770 | each | 350 ₹9,69,500 | 150 ₹4,15,500 Lowest |
| 5.00 | Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201.(iii) Girth above 900 mm to 1800 mm | 1,960 | each | 650 ₹12,74,000 | 180 ₹3,52,800 Lowest |
| 6.00 | Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201.iv) Girth above 1800 mm to 2700 mm | 670 | each | 1,200 ₹8,04,000 | 200 ₹1,34,000 Lowest |
| 7.00 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202. | 12,478.46 | cum | 350 ₹43,67,461 | 220 ₹27,45,261.2 Lowest |
| 8.00 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 40,479.92 | cum | 100 ₹40,47,992 | 90 ₹36,43,192.8 Lowest |
| 9.00 | Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11 | 52,992.76 | cum | 300 ₹1,58,97,828 | 140 ₹74,18,986.4 Lowest |
| 10.00 | Construction of Embankment with Material obtained from borrow pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet quirment of table 300-2 (Including cost of testing of materials at site and laboratory as directed by the deptt.) Rate including Extra Carriage (Rate as per Analysis - II) | 4,47,354.34 | cum | 550 ₹24,60,44,887 | 370 ₹16,55,21,105.8 Lowest |
Tender Value
₹91.1 Cr
EMD Value
₹1.8 Cr
Closing Date
21 Oct 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE, PWD(Roads), Assam, Chandmari, Ghy-3
CE, PWD(Roads), Assam, Chandmari, Ghy-3
ASOM_MALA_3.0_25_26_32 Improvement and strengthening of Hallidayganj Mankachar Purakhasia Kalaichar Road from ch.0.00km (Hallidayganj) to ch.25.209 km (Sialtari) under Asom Mala 3.0 for the year 2025-26.
2025_PWD_47719_1
CE/DEV/TB/116/2025-26/25 Dtd- 16.09.2025
Open Tender
Civil Works – Roads
Item Rate
540 days
South Salmara
Please refer Tender Documents
5 documents required · 5 mandatory
₹30,000
₹1.8 Cr
Yes
CE, PWD(Roads), Assam, Chandmari, Ghy-3
19 Mar 2026
26 Sept 2025
21 Oct 2025
26 Sept 2025
21 Oct 2025
27 Sept 2025
26 Sept 2025 - 26 Sept 2025
26 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land :
Clearing and grubbing road land including uprooting wild vegetation, grass,bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of nserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(a) In area of non thorny jungle | 11.34 | sqm | 52,995.08 | ₹6,00,964.21 |
| 2 | Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201.i) Girth above 300 mm to 600 mm | 2,595 | each | 271.54 | ₹7,04,646.3 |
| 3 | Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201.(ii) Girth above 600 mm to 900 mm | 1,800 | each | 485.34 | ₹8,73,612 |
| 4 | Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201.ii) Girth above 600 mm to 900 mm | 2,770 | each | 258.54 | ₹7,16,155.8 |
| 5 | Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201.(iii) Girth above 900 mm to 1800 mm | 1,960 | each | 538.67 | ₹10,55,793.2 |
| 6 | Uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per Technical Specification clause 201.iv) Girth above 1800 mm to 2700 mm | 670 | each | 1,053.27 | ₹7,05,690.9 |
| 7 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202. | 12,478.46 | cum | 265.1 | ₹33,08,039.75 |
| 8 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 40,479.92 | cum | 67.8 | ₹27,44,538.58 |
| 9 | Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11 | 52,992.76 | cum | 253.01 | ₹1,34,07,698.21 |
| 10 | Construction of Embankment with Material obtained from borrow pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet quirment of table 300-2 (Including cost of testing of materials at site and laboratory as directed by the deptt.) Rate including Extra Carriage (Rate as per Analysis - II) | 4,47,354.34 | cum | 433.13 | ₹19,37,62,585.28 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
Tendernotice_2.pdf
PDF • 8.18 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_76105.xls
BOQ • 0.39 MB
Extension32.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .