Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
16 Mar 2026, 5:00 pmClosed
RANA CHANDRA KAMAL
PROJECT DIRECTOR
Work Division, Patna
RANA CHANDRA KAMAL
PROJECT DIRECTOR
Complete Annual repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of (1) NBCC Yogipur DPS, (2) Yogipur DPS, (3) Ashok Nagar DPS and (4) T.V. Tower DPS under Kankarbagh Anchal, Works Division, BUIDCO for the session 2026-27. ( From 01st April 2026 to 31st March 2027 )
125144
01/Mech/PC/2026-27, Gr02
Open Tender
MECHANICAL
Patna
• Company Name
• Address
• Contact Number and E-mail
• Registration Details
MECHANICAL
ITEM RATE
L1
1
13 documents required · 13 mandatory
₹23,600
Processing Fee: 5900
₹6.2 L
Chief General Manager, BUIDCo, Patna
25 May 2026
15 Feb 2026
17 Mar 2026
15 Feb 2026
16 Mar 2026
15 Feb 2026
23 Feb 2026
NIT No.-01/Mech/PC/2026-27 Gr02
Name of Work:-Complete Annual repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of (1) NBCC Yogipur DPS, (2) Yogipur DPS, (3) Ashok Nagar DPS and (4) T.V. Tower DPS under Kankarbagh Anchal, Works Division, BUIDCO for the session 2026-27. ( From 01st April 2026 to 31st March 2027 )
Estimated Cost (Rs.) Rs. 3,09,88,993.00
Earnest Money (Rs.) Rs. 6,19,800.00
Time of initial inspection & testing of thorough repaired all machineries. 30th May 2026
Cost of BOQ (Rs.) Rs. 23,600.00
To be filled by the Bidder
1 Name of the Contractor/Bidder
2 Address of the Contractor/Bidder
Gr-02 (1) Name of Work:- Complete Annual Repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of NBCC Yogipur DPS under Kankarbagh Anchal, Works Division, BUIDCO for the session 2026-27.( From 01st April 2026 to 31st March 2027 )
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Complete repairing, servicing and overhauling of 510 HP(03 no) & 563 HP(01 no) VT motor pump set. work & quantity may vary. (As per Annexure - 1) 4 P/Job 0.00 0.00
2 Complete repairing and servicing, cleaning all connections, changing and filtration of transformer oil of 100 KVA transformer for lightining purpose as per Instruction of Engineer-in-Charge. (As per Annexure - 2) 1 P/Job 0.00 0.00
3 Complete repairing and servicing, cleaning all connections, changing and filtration of transformer oil of 630 KVA transformer as per Instruction of Engineer-in-Charge. (As per Annexure - 3) 4 P/Job 0.00 0.00
4 Providing all Labours, tool & tackles for repairing of starter of 510 and 563 HP motor with supply, changing and fitting contactor, timer, over load realy unit, push botton, rotary switch, heater, digital voltmeter and changing all internal wiring with suitable PVC Wire & strip as required. 4 P/job 0.00
5 Providing all Labours, tool & tackles for repairing of panel of 510 and 563 HP motor with supply, changing and fitting breaker control switch, digital voltmeter, digital ammeter, repairing of vaccum circuit breaker and changing all internal wiring with suitable PVC Wire & strip as required. 4 P/job 0.00
6 Cost for supplying and fitting new battery 2 no. for flood light in perimises and exhaust fan in panel room including labour, tools and tackles. 2 P/job 0.00
7 Cost of desilting of Existing silt deposition in inlet, outlet drain, sump, extra area and making and fitting of MS grating, rubbing and painting of grating etc. of storm Drainage Pumping Plant. (As per Annexure - 4) 1 P/job 0.00 0.00
8 Cost for black paint painting after removing dust and cleaning of discharge pipe of 2 m diameter and 100 m long and MS structure at the outside of boundry which is in the campus of yogipur DPS including all labour tool and tackles as per direction of E/I. 1 P/job 0.00
9 Cost for supplying and providing rubber mat 10 each 0.00
10 Repairing of Depth Water level gauge in sump. 1 P/Job 0.00
11 Over head Motorised Chain pulley block crane with Panel - 10 Ton (As Per Annexure-05) 1 Nos. 0.00 0.00
12 Complete the below mention mix work as per instruction of Engineer-In-Charge.
(i) Cost for Providing & installation of name plate of Buidco. P/Job 1 0.00
(ii) Cost for Writing the name details of officers & pump operator, sweeper on the wall paint P/Job 1 0.00
(iii) Cost for Providing log book & other required Register. P/Job 1 0.00
(iv) Cost for Providing & availability 24 x 365 days during monsoon period in sufficient qty required safety materials like first aid box kit(01 no), machinery work hand tool kit( 01 set), electrical glooves ISI (01 set), normal hand gloves, torch (02 no.), umbrella(03), safety jacket, gum boot, rain coat( min.03 no.) & other required as per instruction of Engineer-In-Charge P/Job 1 0.00
13 Maintenance of miscllaneous work of all Electro machineries for the period of (01.04.2026 to 15.10.2026) at Yogipur NBCC DPS.The Bidder shall be totally responsible for Proper Functioning of DPS with immediate minor & major work repairing like burning of motor, transformer, panel, starters, Pump operation, Functionality of Sluice gate & any other equipments installed or to be install should be Functional in this DPS, Cleaning of Campus, Sprinkling of Bleaching Powder, proper flood light, fan, chair, rubber mat, transportation and loading, unloading of any equipment/material, repairing of civil structure during emergency for water draining or as per need, functionality of CCTV with recharge etc. as per Direction of E/I. 1 P/job 0.00
14 Deployment of 01 nos.x 01 shifts Road sweepars with all required tools & accessories for cleaning & Screening at NBCC Yogipur DPS during period 1st April 2026 to 31st May 2026 , 04 nos. x03 shifts from 01.06.2026 to 15.10.2026 (The Qty. of Sweeper may be increase or Decrease as per situation & Direction of E/I) 1705 P/Staff 0.00
15 Deployment of 2 no. x 3 shifts man power (highly skilled labour) for the Operation of Pump and others electrical work during the monsoon period 1stApril 2026 to 15th Oct. 2026. 1188 p/staff 0.00
16 Deployment of 1 no. experience electrician who is expert in working of 11KV/3.3KV line and any others electrical work during the monsoon period 1stApril 2026 to 15th Oct. 2026. 198 p/staff 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 563/510 HP VT motor and pump and all electrical connection of motor, taking down motor from from its base by top lifting of motor from motor stool and stacking the motor at proper place 1 p/job 0.00
2 Cost for providing gas cutting set and mask with skilled welder and helper for cutting out the jam nut bolts under floor platform. 1 p/job 0.00
3 Cost for providing labour, tools and tackles at site for opening and taking out discharge tee, column pipe, bowl mouth assembly, etc. of 510/563 HP VT pump including hydra/crane etc. 1 p/job 0.00
4 Cost for transportation of pump accessories from DPS to work shop and workshop to DPS including hydra and transport vehicle etc. with loading and unloading 1 p/job 0.00
5 Cost for greasing for bearing of motor including labour, tools, tackles and requisite material like grease. 1 p/job 0.00
6 Cost for opening and and dismentling of bowl assembly of 510 HPVT pump, taking out pump shaft, upper & lower bowl mouth, impeller, upper and lower bushes, etc in workshop. 1 p/job 0.00
7 Cost for checking pump shaft, head shaft & line shaft on lathe for straightness and strenghtening the same on hydraulic press machine. 3 each 0.00
8 Remetaling and rethreading at both ends upto 3" length on top and line shaft. 3 each 0.00
9 Cost of making, supply and fitting line shaft bronze bush of size 78mm ID 128mm OD 205mm length 1 each 0.00
10 Cost for making and fitting of SS 416 shaft coupling by cutting and making internal thread of size 79mm ID 128 OD 205mm Length 2 each 0.00
11 Cost of making, supply and fitting upper and lower bearing bronze bush of appropriate size 2 each 0.00
12 Cost for supply and fitting of SS 416 shaft sleeve of size 78mm ID 128mm OD 205mm length 2 each 0.00
13 Cost for making and supplying lantern ring of appropriate size 1 p/job 0.00
14 Cost for supplying and fitting following:-
(i) 'o' rings 3 each 0.00
(ii) Stuffing box packing 5 kg 0.00
(iii) Key for shaft sleeve 1 each 0.00
(iv) Key for pump shaft. 1 each 0.00
(v) Ratchet pin SS 410 8 each 0.00
15 Cost for repairing of rachet plate by doing CI welding, grinding & finishing and making 12 nos, sharp edge of proper size and sample by grinding machine 1 p/job 0.00
16 Cost for scrathing old paint of column pipe and discharge pipe and doing one coat primer with red oxide and painting two coats with black japan paint. 1 p/job 0.00
17 Cost for supplying and fitting SS bolts & nuts with plane and spring washers of appropriate size for discharge header and column pipe. 75 each 0.00
18 Cost for supplying and fitting SS bolts & nuts with plane and spring washers of appropriate size for bowl mouth assembly. 72 each 0.00
19 Cost for supply of TVS make steel bolts with threading on both ends complete with washer and nuts as per size & sample 20 each 0.00
20 Cost for supplying and fitting rubber insertion sheet of size 1/8" thick (black) 50 kg 0.00
21 Cost for supplying and filling mobile 30 p/ltr 0.00
22 Cost for fitting of pump accessories and lowering such as ccolumn pipe, bowl mouth assembly, discharge tee line shaft, all spider bushes, etc into the sump. 1 p/job 0.00
23 Cost for placing of motor on its base, doing coupling of motor & pump, doing all electric connection of motor and testing on full load. 1 p/job 0.00
24 Deduct : Cost of scrap materials Bronze -6 p/kg 0.00
25 Deduct : Cost of scrap materials Stainless steel -5 p/kg 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for supplying and fitting following :-
(i) LT stud of copper 6 Each 0.00
(ii) LT bush 6 Each 0.00
(iii) HT stud of copper 6 Each 0.00
(iv) HT bush 6 Each 0.00
(v) Rubberized gasket 1 Each 0.00
2 Cost for supplying and filling of tranformer oil. 100 P/ltr. 0.00
3 cost for transformer oil filtration 150 P/ltr. 0.00
4 Cost for cutting and removing old and damaged cable socket of LT cable of transformer and doing cable socketing including the cost of 185 mm² cable socket and all requisite insulating materials such as glass tape, PVC tape, empire Tape, etc. 6 Each 0.00
5 Cost for tightening of HT & LT studs after refilling of transformer oil and fitting of top cover with ruberised gasket and re-installing equalizing pipes, etc all complete work. 1 P/job 0.00
6 Cost for PVC sleeving suitable to withstand 11 KV power supply for sleeving of 6 SWG jumpher wire 5 p/mtr 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for supplying and fitting following :-
HT stud of copper 6 Each 0.00
HT bush 6 Each 0.00
Rubberized gasket 1 Each 0.00
2 Cost for supplying and filling of tranformer oil. 200 P/ltr. 0.00
3 cost for transformer oil filtration 750 p/ltr 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 complete cleaning of filled up sump in all lift and disposal of soil up to a lead of 50 mtr. as required and including all labour, tools & tackles (i) Sump - 59' x 23' x 5'(avg.) = 6785 cft (ii) inlet of sump - 52' x 4' x 1' (avg.) = 208 cft Total = 6785+208 = 6966 cft = 197.40 m3 197.40 p/m3 0.00
2 Cost for providing all labours, tools and tackles at site for repairing, removing rust,dust, scale, smokes etc. from old surface and painting two or more coats with anticorrosive bituminouspaint of approved brand of two MS gate and channel. 1 p/job 0.00
Name of work - Estimate for repairing of electrical driven overhead crane of Yogipur NBCC DPS
Sl. No. Description of work Qty. Unit Rate Amount
1 Cost for providing all arrangements, labours, tools for complete dismantaling of panel board of electrical driven over head crane and taking for overhauling and repairing. 1 Job 0.00
2 Cost for supplying and fitting of Contactor in starters
(i) MNX Contactor A/C-3 of 12 Amp 2 nos. 0.00
(ii) MNX Contactor A/C-3 of 25 Amp 2 nos. 0.00
(iii) MNX Contactor A/C-3 of 18 Amp 2 nos. 0.00
(iv) Thermal over load relay for having relay range of 14-23 Amp. 1 nos. 0.00
(v) DIN type HRC fuse links of ISI market of 40 Amp. 12 nos. 0.00
(vi) Rustolin for rust removing 1 Pack 0.00
3 Cost for supplying all labour, mechanic for greasing all gear mechanism of over head crane, tightening of bolts, replacing damaged bolts with nut and washers after cleaning properly by for removing all dust, vermin and foreign materials. 1 Job 0.00
4 Cost for providing all arrangements, labours, tools for complete fitting the above spares after proper cleaning the panel and it's electrical connections. 1 Job 0.00
Gr-02 (2) Name of Work- Annual repairing,overhauling,servicing ,operation & maintenance of all electromechanical equipments of Storm Drainage Pumping Station YOGIPUR under Kankarbagh Anchal, Works Division, BUIDCo, Patna for the monsoon year 2026-27 ( From 01st April 2026 to 31st March 2027 )
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Complete repairing and servicing of 335 HP CF pump and motor (No.1 & No. 4) before monsoon 2026 for the year 2026-27 as per direction of Engineer-in-charge. (As per Annexure - 1) 2 P/Job 0.00 0.00
2 Complete repairing and servicing of 250 HP CF pump and motor (No.3 & No. 6)before monsoon 2026 for the year 2026-27 as per direction of Engineer-in-charge. (As per Annexure - 2) 2 P/Job 0.00 0.00
3 Complete repairing and servicing of 270 HP CF pump and motor(No.5) before monsoon 2026 for the year 2026-27 as per direction of Engineer-in-charge. (As per Annexure - 3) 1 P/Job 0.00 0.00
4 Complete repairing and servicing of 170 HP CF pump and motor (No.2)before monsoon 2026 for the year 2026-27 as per direction of Engineer-in-charge. (As per Annexure - 4) 1 P/Job 0.00 0.00
5 Complete repairing and servicing of 150 /176 HP sub. pump and motor (No.9,10,11 & 12) before monsoon 2026 for the year 2026-27 as per direction of Engineer-in-charge. (As per Annexure - 5) 4 P/Job 0.00 0.00
6 Cost for supplying and fitting followings in the soft starter of 2X335 HP pump sets are i. HRC Fuse - 06 nos. ii. MCCB 1000 amp - 2 nos iii. TP contactor 220 volt control-01 no. iv.ON/OFF Switch- 02 nos v. soft starter control kit - 01 vi. Soft starter display kit board - 01 vii. soft starter display cable 29 p/38 p flat cable -01 viii.Relay meter ( control line) - 01, ix.Auto switch- 01,x. Relay meter (MPR) - 01 ,xi. single phase preventer- 01,xii. Four step self starting relay- 01,xiii. Amp volt control meter- 01, xiv.MCB- 04 way 63 amp - 01,xv. 63 amp single phase - 04 no. , xvi.2 amp - 6 no.xvii contractor model LC1E 1201, 4 pole 12 amp- 6 nos.xviii LED- 15 nos. xix 110 volt,LED - 06 nos, 440 volt 1 P/Job 0.00
7 Cost for complete repairing and changing of spare parts of APFC panel ( 7% reactor) are 200 KVAR- 01 no , TP 50 KA 800 amp MCCB- 1 no , C.T coil - 600/5 amp - 03 no. MCB 32 amp(TP) - 3 no. Wire 2.5 sq. mm - 01 coil, Power controller - 01 no. , Rotary handle - 01 no, speader - 01 set etc for proper controlling of power factor and also preventing power losses from transformer. 6 P/Job 0.00
8 Cost for repairing & servicing of starter , panel boards and ACB of 2x250, 1x270, 1x170 HP.2x150 HP & 2x176 HP pump set ( as per Annexure-6 ) 1 P/Job 0.00 0.00
9 Complete repairing and servicing , cleaning all connections and S/F of 400 Amp. 11KV AB switch & DP structure of 11 KV electric sub - station and filtration of transformer oil of 400/500 KVA transformer as Per Instruction of Engineer -In- Charge. (As per Annexure - 7) 7 P/Job 0.00 0.00
10 Complete repairing and servicing , cleaning all connections and S/F of 400 Amp. 11KV AB switch & DP structure of 11 KV electric sub - station and filtration of transformer oil of 250 KVA transformer as Per Instruction of Engineer -In- Charge. (As per Annexure - 8 ) 1 P/Job 0.00 0.00
11 Repairing and servicing of 198 HP diesel engine ( As per Annexure - 09 ) 1 P/Job 0.00 0.00
12 Rrepairing and servicing of 375 HP diesel engine ( As per Annexure - 10 ) 1 P/Job 0.00 0.00
13 Complete repairing and servicing of 198 HP(D) C/F pump before monsoon 2026 for the year 2026-27 as per direction of Engineer-in-charge . (Annexure-11) 1 P/Job 0.00 0.00
14 Complete repairing and servicing of 375 HP(D) C/F pump before monsoon 2026 for the year 2026-27 as per direction of Engineer-in-charge. (Annexure-12) 1 P/Job 0.00 0.00
15 Opening, dismantling and repairing of 10 HP vacuum pump, remetalling on cut point, turning and polishing of the shaft and making key way groove, bearing housing, change of bearing, GM bush, consumable items, cable socket, copper cable etc. ( As per Annexure - 13 ) 5 p/job 0.00 0.00
16 Cost for repairing of slipring unit and supplying and fitting of terminal point, connection lead, carbon brush and carbon holder of 2x250HP & 1x170HP centrifugal motor of pumpset no-2, 3 & 6 storm drainage pumping plant Yogipur before monsoon . 1 P/Job 0.00
17 Cost for Repairing & Servicing of rotor controller starters for 2,3 &6 with filling of Transformer oil. and doing all connections and testing on load. 1 P/Job 0.00
18 Cost for Complete Reparing ,Overhauling ,Servicing & Functionlity of 10 Ton Manual Chain pulley block Over head crane mounted on DPS as Per Direction of Engineer-in-Charge. 2 P/Job 0.00
19 Providing & installation of New water level Gauge (30 feet height) as per direction of Engineer-in-charge . 1 P/Job 0.00
20 Providing & availablity of 24 hrsx365 days in sufficient Qty, required Safety materials like First aid box kit (01 nos.), machineries work Hand Tools kit (01 set), Electrical gloves (02 set)(ISI), Discharge Rod(01 set)(ISI Marked) normal hand gloves, Torch (02 nos), Umbrealla (05 nos. minimum), safety jacket, safety gum boot, Rain jacket (Minimum 05 nos.)& other required as per Instruction of E/I. 1 P/Job 0.00
21 Cost of desilting of Existing silt deposition in inlet, outlet drain, sump, extra area and making and fitting of MS grating, rubbing and painting of grating etc. of storm Drainage Pumping Plant (As per Annexure - 14) 1 P/Job 0.00 0.00
22 Deployment of 02 nos.x3 shifts Highly Skilled Electrician during period 1st June 2026 to 15th Oct 2026 . 822 P/Staff 0.00
23 Deployment of 02 nos.x 01 shifts Road sweepars with all required tools & accessories for cleaning & Screening at Yogipur DPS during period 1st April 2026 to 31st May 2026 , 04 nos. x03 shifts from 01.06.2026 to 15.10.2026 and 02 nos.x 01 shifts from 16.10.2026 to 31.03.2027 (The Qty. of Sweeper may be increase or Decrease as per situation & Direction of Engineer-In-Charge) 2100 P/Staff 0.00
24 Deployment of 02nos.x3 shifts Highly Skilled Technician cum pump operators during period 1st April 2026 to 31st May 2026 , 04 nos. x03 shift from 01.06.2026 to 15.10.2026 and 02 nos.x 3 shifts from 16.10.2026 to 31.03.2027 3012 P/Staff 0.00
25 Maintenance of miscllaneous work of all Electro machineries for the period of (01.04.2026 to 31.03.2027) at Yogipur DPS.The Bidder shall be totally responsible for Proper Functioning of DPS with immediate minor & major work repairing like burning of motor, transformer, panel, starters, Pump operation, Functionality of Sluice gate & any other equipments installed or to be install should be Functional in this DPS, Cleaning of Campus, Sprinkling of Bleaching Powder, proper flood light, fan, chair, rubber mat, transportation and loading, unloading of any equipment/material, repairing of civil structure during emergency for water draining ,functionality of CCTV With recharge etc. as per Direction of E/I.Payment will be made only if work other than the above 24 items is done. 1 P/Lot 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 335 HP CF pump from motor and all electrical connection of motor and opening all nut and bolt of pump casing, from suction line and delivery line and from foundation base. 1 p/job 0.00
2 Cost for providing labour, tools and tackles for transportation of motor and its accessories loading and unloading from DPS to workshop and back to pump house after repairing work with the help of hydra/crane, pickup van and all necessary to complete job. 1 p/job 0.00
3 Cost for complete opening of 335 HP C/F motor part by part & taken out of DE & NDE bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size including cost of hiring charge of welding machine, labour, tool & tackles all complete job. 1 p/job 0.00
4 Cost for supplying and fitting bearing SKF Make of appropriate size, if required including all labour tools and tackles 2 each 0.00
5 Cost for bearing greasing, taping, heating & varnishing of enamelled copper winding wire including required materials like grease and varnish including all labours, tools and tackles etc. 1 p/job 0.00
6 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place including labour, tools & tackles etc. 1 p/job 0.00
7 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from pump casing including all labour, tools & tackles etc. at workshop. 1 p/job 0.00
8 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. 1 p/job 0.00
9 Cost for making,supply and fitting of bronze bush including cutting, turning, polishing and finishing of size. 110 mm ID x 140 mm OD x 330 mm length 1 each 0.00
10 Cost for supply and fitting of angular contact ball bearing no. Of appropriate size or equivalent for 335HP Electric pump with GST,CP & labour cess etc 2 each 0.00
11 Cost for supply and fitting of Spherical Roller ball bearing no. SKF NU326 ECJ/C3 or equivalent for 335HP Electric pump with GST,CP & labour cess etc 1 each 0.00
12 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 p/job 0.00
13 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. 1 p/set 0.00
14 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. 1 p/job 0.00
15 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. 1 p/set 0.00
16 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. 1 P/job. 0.00
17 Cost for supplying all labours, tools & tackles at workshop for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 P/job. 0.00
18 providing all labours, tools, tackles for installation of 335 HP C/F pump and motor on foundation, refitting nut-bolt & testing on load at DPS. 1 P/job. 0.00
19 Cost for supplying and fitting bolts and nuts of different sizes with washer labours, tools & tackles TVS make. 10 P/Kg 0.00
20 Cost for supplying, making and fitting SS bolt for coupling as per size and sample labours, tools & tackle TVS make. 20 each 0.00
21 Deduct : Cost of Scrap materials of bronze -8 P/Kg 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 250 HP CF pump from motor and all electrical connection of motor and opening all nut and bolt of pump casing, from suction line and delivery line and from foundation base. 1 p/job 0.00
2 Cost for providing labour, tools and tackles for transportation of motor and its accessories loading and unloading from DPS to workshop and back to pump house after repairing work with the help of hydra/crane, pickup van and all necessary to complete job. 1 p/job 0.00
3 Cost for complete opening of 250 HP C/F motor part by part & taken out of DE & NDE bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size including cost of hiring charge of welding machine, labour, tool & tackles all complete job. 1 p/job 0.00
4 Cost for supplying and fitting bearing SKF Make of appropriate size, if required including all labour tools and tackles 2 each 0.00
5 Cost for bearing greasing, taping, heating & varnishing of enamelled copper winding wire including required materials like grease and varnish including all labours, tools and tackles etc. 1 p/job 0.00
6 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place including labour, tools & tackles etc. 1 p/job 0.00
7 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from pump casing including all labour, tools & tackles etc. at workshop. 1 p/job 0.00
8 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. 1 p/job 0.00
9 Cost for making,supply and fitting of bronze bush including cutting, turning, polishing and finishing of size. 100 mm ID x 124 mm OD x 300 mm length 1 each 0.00
10 Cost for supply and fitting of angular contact ball bearing no. SKF 6418 C3 or equivalent for 250HP Electric pump with GST,CP & labour cess etc 2 each 0.00
11 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 p/job 0.00
12 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. 1 p/set 0.00
13 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. 1 p/job 0.00
14 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. 1 p/set 0.00
15 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. 1 P/job. 0.00
16 Cost for supplying all labours, tools & tackles at workshop for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 P/job. 0.00
17 providing all labours, tools, tackles for installation of 250 HP C/F pump and motor on foundation, refitting nut-bolt & testing on load at DPS. 1 P/job. 0.00
18 Cost for supplying and fitting bolts and nuts of different sizes with washer labours, tools & tackles TVS make. 10 P/Kg 0.00
19 Cost for supplying, making and fitting SS bolt for coupling as per size and sample labours, tools & tackle TVS make. 20 each 0.00
20 Deduct : Cost of Scrap materials of bronze -8 P/Kg 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 270 HP CF pump from motor and all electrical connection of motor and opening all nut and bolt of pump casing, from suction line and delivery line and from foundation base. 1 p/job 0.00
2 Cost for providing labour, tools and tackles for transportation of motor and its accessories loading and unloading from DPS to workshop and back to pump house after repairing work with the help of hydra/crane, pickup van and all necessary to complete job. 1 p/job 0.00
3 Cost for complete opening of 270 HP C/F motor part by part & taken out of DE & NDE bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size including cost of hiring charge of welding machine, labour, tool & tackles all complete job. 1 p/job 0.00
4 Cost for supplying and fitting bearing SKF Make of appropriate size, if required including all labour tools and tackles 2 each 0.00
5 Cost for bearing greasing, taping, heating & varnishing of enamelled copper winding wire including required materials like grease and varnish including all labours, tools and tackles etc. 1 p/job 0.00
6 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place including labour, tools & tackles etc. 1 p/job 0.00
7 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from pump casing including all labour, tools & tackles etc. at workshop. 1 p/job 0.00
8 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. 1 p/job 0.00
9 Cost for making,supply and fitting of bronze bush including cutting, turning, polishing and finishing of size. 100 mm ID x 124 mm OD x 300 mm length 1 each 0.00
10 Cost for supply and fitting of angular contact ball bearing no. SKF 3320 A or equivalent for 270HP Electric pump with GST,CP & labour cess etc 2 each 0.00
11 Cost for supply and fitting of Spherical Roller ball bearing no. SKF NU 222 ECM or equivalent for 270HP Electric pump with GST,CP & labour cess etc 1 each 0.00
12 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 p/job 0.00
13 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. 1 p/set 0.00
14 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. 1 p/job 0.00
15 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. 1 p/set 0.00
16 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. 1 P/job. 0.00
17 Cost for supplying all labours, tools & tackles at workshop for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 P/job. 0.00
18 providing all labours, tools, tackles for installation of 270 HP C/F pump and motor on foundation, refitting nut-bolt & testing on load at DPS. 1 P/job. 0.00
19 Cost for supplying and fitting bolts and nuts of different sizes with washer labours, tools & tackles TVS make. 10 P/Kg 0.00
20 Cost for supplying, making and fitting SS bolt for coupling as per size and sample labours, tools & tackle TVS make. 20 each 0.00
21 Deduct : Cost of Scrap materials of bronze -8 P/Kg 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 170 HP CF pump from motor and all electrical connection of motor and opening all nut and bolt of pump casing, from suction line and delivery line and from foundation base. 1 p/job 0.00
2 Cost for providing labour, tools and tackles for transportation of motor and its accessories loading and unloading from DPS to workshop and back to pump house after repairing work with the help of hydra/crane, pickup van and all necessary to complete job. 1 p/job 0.00
3 Cost for complete opening of 170 HP C/F motor part by part & taken out of DE & NDE bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size including cost of hiring charge of welding machine, labour, tool & tackles all complete job. 1 p/job 0.00
4 Cost for supplying and fitting bearing SKF Make of appropriate size, if required including all labour tools and tackles 2 each 0.00
5 Cost for bearing greasing, taping, heating & varnishing of enamelled copper winding wire including required materials like grease and varnish including all labours, tools and tackles etc. 1 p/job 0.00
6 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place including labour, tools & tackles etc. 1 p/job 0.00
7 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from pump casing including all labour, tools & tackles etc. at workshop. 1 p/job 0.00
8 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. 1 p/job 0.00
9 Cost for making,supply and fitting of bronze bush including cutting, turning, polishing and finishing of size. 100 mm ID x 124 mm OD x 300 mm length 1 each 0.00
10 Cost for supply and fitting of angular contact ball bearing no. SKF 3320 A or equivalent for 170HP Electric pump with GST,CP & labour cess etc 1 each 0.00
11 Cost for supply and fitting of Spherical Roller ball bearing no. SKF NU 222 ECM or equivalent for 170 HP Electric pump with GST,CP & labour cess etc 1 each 0.00
12 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 p/job 0.00
13 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. 1 p/set 0.00
14 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. 1 p/job 0.00
15 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. 1 p/set 0.00
16 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. 1 P/job. 0.00
17 Cost for supplying all labours, tools & tackles at workshop for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 P/job. 0.00
18 providing all labours, tools, tackles for installation of 170 HP C/F pump and motor on foundation, refitting nut-bolt & testing on load at DPS. 1 P/job. 0.00
19 Cost for supplying and fitting bolts and nuts of different sizes with washer labours, tools & tackles TVS make. 10 P/Kg 0.00
20 Cost for supplying, making and fitting SS bolt for coupling as per size and sample labours, tools & tackle TVS make. 20 each 0.00
21 Deduct : Cost of Scrap materials of bronze -8 P/Kg 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for dissconnecting the 150 HP submersible pump set and taking out 150 sub. Pump set from sump house and loading on pickup van for transportation of pump motor assembly from site to work shop for repairing work including hydra/crane 1 p/job 0.00
2 Cost for opening and dismentling of 150 HP sub. Motor pump assembly and taking out impeller from motor pump assembly. 1 p/job 0.00
3 Cost for varnishing and heating of stator to required level of insulation and inspecting the insulation level at regular interval for 36 hours 1 p/job 0.00
4 Cost for supplying and fitting copper cable socket, cable entry kit 2 each 0.00
5 Cost for supplying and fitting nitril rubber 'o' rings, joint rubber gasket, lip seal, spring washer, neck ring including labour tool and tackles 1 each 0.00
6 Cost for making, supplying and fitting mechanical lock, mechanical seal (motor side) and primary seal (pump side) including labour, tool and tackles all complete job. 1 p/set 0.00
7 Cost for supplying following :-
mobil 15 p/ltr 0.00
servo bearing grease 5 p/kg 0.00
nuts, bolts and key of different sizes i.e. dome type, hex nut bolt etc. 1 p/set 0.00
8 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 p/job 0.00
9 Cost for assembly of all parts of 150 hp submersible pump at workshop including all labour tool and tackles. 1 p/job 0.00
10 Cost for transportation of pump motor assembly from workshop to pump house after repair including all cost of labour for loading and providing all labours, tools and tackles at site for lowering of motor pump assembly, fitting and fixing of pump motor assembly to discharge pipe and testing on full load. 1 p/job 0.00
Sl. No. Particulars of Works Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools & tackles at site for opening & dismantling all internal wiring, copper bus bars of 2x250,1x270,1x170 HP, 2x150 &2 x176 HP pump set panel board, removing dust, vermins and foreign materials by blowing machine, cleaning and washing all the internal joints & components with petrol and greasing them properly and resetting, all complete job with GST, CP & Labour cess. 8 P/job. 0.00
2 Cost for providing all labours, tools, suitable tackles and an electrician for opening and dismantling of 1000 Amp. ACB of pump set, cleaning all the moving & fixed contacts with petrol and greasing them properly as well as setting the male & female contacts and replacing burnt bakelite terminals, all complete job with GST, CP & Labour cess. 6 P/job. 0.00
3 Cost for dsupplying and fitting following in the pump set panel with GST, CP & Labour cess. :
(i) CT coil 500/5 16 Each 0.00
(ii) Cost for supply of 2.5 sq. mm flexible copper wire for repair of internal wiring of all the panel boards & starters. 3 P/coil 0.00
(iii) LED pilot lamp standard 12-240 V AC Colour R/Y/G/A 30 Each 0.00
(iv) 3Ph VAF + PF, Class 1, 1A 8 Each 0.00
(v) Push Button ON / OFF Switch 8 Each 0.00
(vi) Cost for supply and fitting of 3 Pole, 415 v, 50 Hz DTH 800 MCCB having current rating 630 Amp. & breaking capacity 50 KA including GST, C.P. & Labour cess in the outgoing feeder of panel board of 175 HP pump set-1 . Make - L&T 3 Each 0.00
(vii) Cost for supplying, making & fitting 9 nos.. copper bus barsfrom copper flats of size 40 mm x 5 mm x 4.5 m long in the incomming & outgoing feeders of 2 nos. MCCB & 1 no. ACB. 3 P/job. 0.00
(viii) Cost for supply of lock with key for panel boards and starters. 4 P/set 0.00
5 Cost for complete repairing and changing of spare parts of APFC panel ( 7% reactor) are 200 KVAR- 01 no , TP 50 KA 800 amp MCCB- 1 no , C.T coil - 600/5 amp - 03 no. MCB 32 amp(TP) - 3 no. Wire 2.5 sq. mm - 01 coil, Power controller - 01 no. , Rotary handle - 01 no, speader - 01 set etc for proper controlling of power factor and also preventing power losses from transformer. 4 P/job 0.00
6 Cost for providing all labours, tools suitable tackles & electrician for opening and dismantling the starters of pump sets by opening and dismantling all the contactors, timer, overload relay, etc, cleaning the starter by blowing air to remove dust & vermins, washing all the components with petrol, resetting the starter by replacing burnt & damaged contactors and their accessories, tapping all the bus bars by rapping pvc tape including the cost of pvc tape , petrol etc. all complete job with GST, CP & Labour cess. 4 P/job 0.00
7 Cost for supply of followings for starers of pump sets with GST, CP & Labour cess. :-
(i) Contactor -500A/350A. 7 Each 0.00
(ii) Thermal overload relay with relay setting range 250-400 Amp. LR1F400. 6 Each 0.00
(iii) Timer TA2-DS2 (0-30 SEC). 6 Each 0.00
(iv) AC coil of LC1FDP265A. Contactors. 6 Each 0.00
(v) Brass bolts & nuts with washer of different sizes 15 P/kg 0.00
8 Cost for cutting and removing old and damaged Copper & aluminium cable socket of panel board & starters and doing cable socketing of 240 mm² cable of panel & starters including the cost socket and required insulating materials with GST, CP & Labour cess. 28 Each 0.00
9 Deduct : Cost of Scrap materials Copper -8 P/Kg 0.00
Name of Work:-Estimate for repairing &servicing of 400/500 KVA Transformer
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for opening and dismantling all electrical connections of HT and LT of400/500 KVA transformer, loading and unloading the transformer on transportation vehicle by using hydraulic crane including the hire cost and reinstallation, commissioning after repairing at the DPS. 1 P/job 0.00
2 Cost for opening the top cover and dismentling the same for taking out HT and LT coils from transformer body after draining out transformer oil and stacking in a container, taking out sludge of transformer oil and cleaning inside of transformer body and radiator fins by blowing pressurised oil. 1 P/job 0.00
3 Cost for providing all labours and tools and taking out HT and LT coil from transformer body by using chain pulley block 1 P/job 0.00
4 Cost for supplying and fitting following :-
(i) LT stud of copper 3 Each 0.00
(ii) LT bush 3 Each 0.00
(iii) HT stud of copper 3 Each 0.00
(iv) HT bush 3 Each 0.00
(v) Rubberized gasket 1 Each 0.00
5 Cost for supplying and filling of tranformer oil. 220 P/ltr. 0.00
6 Cost for transformer oil filtration 430 P/ltr. 0.00
7 Cost for cutting and removing old and damaged cable socket of LT cable of transformer and doing cable socketing including the cost of 185 mm² cable socket and all requisite insulating materials such as glass tape, PVC tape, empire Tape, etc. 3 Each 0.00
8 Cost for tightening of HT & LT studs after refilling of transformer oil and fitting of top cover with ruberised gasket and re-installing equalizing pipes, etc all complete work. 1 P/job 0.00
9 Cost for providing all labours, tools and tackles at site for opening and dismantling of 400 Amp. AB switch such as male & female contact, knife type contact, cleaning & washing each component with petrol properly and resetting them all complete job. 1 P/job 0.00
10 Cost for supplying & fitting following spares. :-
i. Post insulator. 2 Each 0.00
ii. Horn gap fuse. ( 1 pcs = 3 nos.) 2 Each 0.00
iii. Net fuse for 400 Amp. AB switch. (1 pcs =3 nos.) 2 Each 0.00
iv. Copper wire 6 SWG. 2 P/kg 0.00
v. GI bolts & nuts with washer of different sizes 1.5 P/kg 0.00
vi. Knife type male & female contact for 400 Amp. AB switch. ( 1 Pcs = 3 nos) 1 Each 0.00
vii Rabit conductor for connection of main ncoming feeder. 5 P M 0.00
viii Fuse wire 19 no. 0.5 P/kg 0.00
11 Deduct : Cost of Scrap materials Copper -4 P/kg 0.00
Total Cost 0.00
Name of Work:- Estimate of repairing & sevicing of 250/200 KVA Transformer
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for opening and dismantling all electrical connections of HT and LT of 315 KVA transformer, loading and unloading the transformer on transportation vehicle by using hydraulic crane including the hire cost and reinstallation, commissioning after repairing at the DPS. 1 P/job 0.00
2 Cost for opening the top cover and dismentling the same for taking out HT and LT coils from transformer body after draining out transformer oil and stacking in a container, taking out sludge of transformer oil and cleaning inside of transformer body and radiator fins by blowing pressurised oil. 1 P/job 0.00
3 Cost for providing all labours and tools and taking out HT and LT coil from transformer body by using chain pulley block 1 P/job 0.00
4 Cost for supplying and fitting following :-
(i) LT stud of copper 2 Each 0.00
(ii) LT bush 2 Each 0.00
(iii) HT stud of copper 2 Each 0.00
(iv) HT bush 2 Each 0.00
(v) Rubberized gasket 1 Each 0.00
5 Cost for supplying and filling of tranformer oil. 100 P/ltr. 0.00
6 cost for transformer oil filtration 150 P/ltr. 0.00
7 Cost for cutting and removing old and damaged cable socket of LT cable of transformer and doing cable socketing including the cost of 185 mm² cable socket and all requisite insulating materials such as glass tape, PVC tape, empire Tape, etc. 2 Each 0.00
8 Cost for tightening of HT & LT studs after refilling of transformer oil and fitting of top cover with ruberised gasket and re-installing equalizing pipes, etc all complete work. 1 P/job 0.00
9 Cost for providing all labours, tools and tackles at site for opening and dismantling of 400 Amp. AB switch such as male & female contact, knife type contact, cleaning & washing each component with petrol properly and resetting them all complete job. 1 P/job 0.00
10 Cost for supplying & fitting following spares. :-
i. Post insulator. 2 Each 0.00
ii. Horn gap fuse. ( 1 pcs = 3 nos.) 2 Each 0.00
iii. Net fuse for 400 Amp. AB switch. (1 pcs =3 nos.) 2 Each 0.00
iv. Copper wire 6 SWG. 1 P/kg 0.00
v. GI bolts & nuts with washer of different sizes 1.5 P/kg 0.00
vi. Knife type male & female contact for 400 Amp. AB switch. ( 1 Pcs = 3 nos) 1 Each 0.00
vii Rabit conductor for connection of main ncoming feeder. 5 P M 0.00
viii Fuse wire 19 no. 0.5 P/kg 0.00
11 Deduct : Cost of Scrap materials Copper -4 P/kg 0.00
Name of Work:- Repairing & Servicing of 198 HP Diesel Engine
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools, tackles and an experienced mechanic at site for servicing of 198 HP diesel engine of Kirloskar make by checking of fuel pump, oil pump, decarbonisation of engine cylinder head and testing of engine on unload and load, etc. all complete. 1 P/job 0.00
2 Cost for supplying and fitting/filling following :-
(i) Air filter 1 each 0.00
(ii) Diesel filter 1 P/set 0.00
(iii) Lubricating oil filter 2 each 0.00
(iv) Mobile 60 p/lit 0.00
(v) Set of flexibles 1 p/set 0.00
(vi) Fuel off solenoid switch 12V DC for fuel pump 1 each 0.00
(vii) Relay in electrical panel 2 each 0.00
(viii) Set of sealings 1 p/set 0.00
(ix) Rocker cover joints 3 each 0.00
(x) Coolant 45 p/lit 0.00
3 Cost for Adjust/Replace(if necessary) V belt condition and tension, Thermostat element,valve clearance, fasteners, exhaust silencer including all labour, tools and tackles. 1 P/Job. 0.00
4 Cost for Radiator cleaning and repairing of radiator fines externally, radiator tube internally, including all labour, tools and tackles. 1 P/Job. 0.00
5 Supply, installation and testing of new battery if required capacity to operate the engine and deducting the cost of old battery as per direction of E/I. 2 p/job 0.00
6 S/F battery cable and terminal etc as required. 2 each 0.00
7 S/F battery terminal wire of length 2 mtr. etc as required. 2 each 0.00
8 Complete overhauling and refitting of self starter by changing the bearing,carbon brush,bushes, nut bolt,washer etc as required during overhauling. with all required materials . 1 P/Job. 0.00
9 Repairing, overhauling and refitting of alternator with changing its burnt armature,carbon brush,bearings, bushes etc as required. 1 P/Job. 0.00
Name of Work:- Repairing & Servicing of 375 HP Diesel Engine
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools, tackles and an experienced mechanic at site for servicing of 375 HP diesel engine of Kirloskar make by checking of fuel pump, oil pump, decarbonisation of engine cylinder head and testing of engine on unload and load, etc. all complete. 1 P/job 0.00
2 Cost for supplying and fitting/filling following :-
(i) Air filter 1 each 0.00
(ii) Diesel filter 1 P/set 0.00
(iii) Lubricating oil filter 2 each 0.00
(iv) Mobile 40 p/lit 0.00
(v) Set of flexibles 1 p/set 0.00
(vi) Fuel off solenoid switch 12V DC for fuel pump 1 each 0.00
(vii) Relay in electrical panel 2 each 0.00
(viii) Set of sealings 1 p/set 0.00
(ix) Rocker cover joints 3 each 0.00
(x) Coolant 50 p/lit 0.00
3 Cost for Adjust/Replace(if necessary) V belt condition and tension, Thermostat element,valve clearance, fasteners, exhaust silencer including all labour, tools and tackles. 1 P/Job. 0.00
4 Cost for Radiator cleaning and repairing of radiator fines externally, radiator tube internally, including all labour, tools and tackles. 1 P/Job. 0.00
5 Supply, installation and testing of new battery if required capacity to operate the engine and deducting the cost of old battery as per direction of E/I. 2 p/job 0.00
6 S/F battery cable and terminal etc as required. 2 each 0.00
7 S/F battery terminal wire of length 2 mtr. etc as required. 2 each 0.00
8 Complete overhauling and refitting of self starter by changing the bearing,carbon brush,bushes, nut bolt,washer etc as required during overhauling. with all required materials . 1 P/Job. 0.00
9 Repairing, overhauling and refitting of alternator with changing its burnt armature,carbon brush,bearings, bushes etc as required. 1 P/Job. 0.00
Name of Work:- Repairing & Servicing of 198 HP CF Diesel Pump
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 198 HP CF pump and all the electrical connections of motor and opening all bolts and nuts of pump casing, bearing houshing and taking out of bearing houshing together with impeller coupling and pump shaft. 1 p/job 0.00
2 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from fondation on including all labour, tools & tackles etc. 1 p/job 0.00
3 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. 1 p/job 0.00
4 Cost for making,supply and fitting of bronze bush including cutting, turning, polishing and finishing of size. 88 mm ID x 112 mm OD x 200 mm length 1 each 0.00
5 Cost for supply and fitting of S-cylindrical Roller bearing no. SKF 3219 A or equivalent for 198 HP pump with GST,CP & labour cess etc 2 each 0.00
6 Cost for supply and fitting of Spherical Roller bearing no. SKF 3314 A equivalent for 198 HP pump with GST,CP & labour cess etc 1 each 0.00
7 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. 1 p/set 0.00
8 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 p/job 0.00
9 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. 1 p/job 0.00
10 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. 1 p/set 0.00
11 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. 1 P/job. 0.00
12 Cost for supplying all labours, tools & tackles at site for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 P/job. 0.00
13 providing all labours, tools, tackles for installation of 198 HP C/F pump on foundation,refitting nut-bolt & testing on unload. 1 P/job. 0.00
14 Cost for supplying and fitting bolts and nuts of different sizes with washer including labours, tools & tackles. 10 P/Kg 0.00
15 Cost for supplying and fitting SS coupling bolt as per size and sample including labours, tools & tackles. 10 each 0.00
16 Deduct : Cost of Scrap materials Stainless steel -2 P/Kg 0.00
Name of Work:- Repairing & Servicing of 375 HP CF Diesel Pump
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 375 HP CF pump and all the electrical connections of motor and opening all bolts and nuts of pump casing, bearing houshing and taking out of bearing houshing together with impeller coupling and pump shaft. 1 p/job 0.00
2 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from fondation on including all labour, tools & tackles etc. 1 p/job 0.00
3 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. 1 p/job 0.00
4 Cost for making,supply and fitting of bronze bush including cutting, turning, polishing and finishing of size. 100 mm ID x 122 mm OD x 220 mm length 1 each 0.00
5 Cost for supply and fitting of S-cylindrical Roller bearing no. SKF 3220 A or equivalent for 375 HP pump with GST,CP & labour cess etc 2 each 0.00
6 Cost for supply and fitting of Spherical Roller bearing no. SKF 3322 A equivalent for 375 HP pump with GST,CP & labour cess etc 1 each 0.00
7 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. 1 p/set 0.00
8 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 p/job 0.00
9 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. 1 p/job 0.00
10 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. 1 p/set 0.00
11 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. 1 P/job. 0.00
12 Cost for supplying all labours, tools & tackles at site for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 P/job. 0.00
13 providing all labours, tools, tackles for installation of 375 HP C/F pump on foundation,refitting nut-bolt & testing on unload. 1 P/job. 0.00
14 Cost for supplying and fitting bolts and nuts of different sizes with washer including labours, tools & tackles. 10 P/Kg 0.00
15 Cost for supplying and fitting SS coupling bolt as per size and sample including labours, tools & tackles. 10 each 0.00
16 Deduct : Cost of Scrap materials Stainless steel -2 P/Kg 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labour, tools and tackles at site for opening electrical connection of 10 HP vacuum pump motor, foundation bolts and nuts of pump, GI flange and taking out and removing it from base. 1 P/job. 0.00
2 Cost for dismantling of 10 HP vacuum pump for taking out impeller, pump shaft, etc and cleaning all the components for ready for repair. 1 P/job. 0.00
3 Cost for repairing of steel shaft by remetalling on cut point, turning and polishing of the shaft and making key way groove. 1 P/job. 0.00
5 Cost for making supplying and fitting GM bush as per sample. 1 Each 0.00
6 Cost for supplying and fitting ball bearing no. ……….. of SKF if required.. 1 Each 0.00
7 Cost for fitting materials such as packing paper, grease, gland packing, nuts and bolts, cotton waste etc required at the time of fitting of pump. 1 Each 0.00
8 Cost for reassembling of pump with shaft, impeller, bearing set, oil seal, etc accessories in work shop. 1 Each 0.00
9 Cost for providing all labour, tools and tackles for reinstallation of motor and pump on base and doing electrical connections and testing all complete. 1 P/job. 0.00
10 Cost for cutting and removing burnt cable sockets and doing cable socketing of 6 mm² 3 core copper cable of both motor and starter. 3 Each 0.00
11 Cost for supplying and fitting of 3 core 6 mm2 copper cable from starter panel to 10 HP motor. 10 p/mtr 0.00
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for supplying all labours, tools and suitable tackles for cleaning & desilting of filled and Choked sump tank, Drain,approach chhannel and inlet chamber etc of diffrent DPS and to lift and disposal of all soils and materials all complete as per specification and direction of E/I at site. (i) Sump -π/4 x 13.92 m x 13.92 mx1.0 m(avg.) = 182 cum 152 p/m3 0.00
2 Cost for supplying all labour, tools & tackles at site for dry lift and disposal of soils and foreign materials to a East Corner of Pump house.with loading & unloading charge all complete (70% of total taken and site)as Per Direction of Engineer-In-Charge. 27.3 p/m3 0.00
total Cost 0.00
Gr-02 (3) Name of Work- Annual repairing,overhauling,servicing ,operation & maintenance of all electromechanical equipments of Storm Drainage Pumping Station ASHOK NAGAR under Kankerbagh Anchal, Works Division, BUIDCo, Patna for the monsoon year 2026-27 ( From 01st April 2026 to 31st March 2027 )
SI.No. Description Of Work Qty Unit Rate (RS.) Amount (RS.)
1 pump and motor - 200 HP VT having Q=528 lps, H=16.5 m (As per Annexure - 01) 1 job 0.00 0.00
2 Pump Set-100 HP VT ,Running at 3Ø ,f=50 Hz volt=440 V (As per Annexure - 02) 2 job 0.00 0.00
3 Pump and motor 50 HP VT with Q= 306 lps (As per Annexure -03) 2 job 0.00 0.00
4 pump and motor - 125 HP having Q=375 lps, H=11 m running at 440v, 50hz & 5 HP vacuum pump (As per Annexure -04) 1 job 0.00 0.00
5 Complete repairing and servicing of 147/215 HP sub. pump and motor (No.7,8) (As per Annexure - 5) 2 job 0.00 0.00
6 Outdoor Transformer 450/500 KVA, AB Switch & DP Structure of 11 KV Electric Sub-station. (As per Annexure - 06) 4 job 0.00 0.00
7 FASD Starter cum Panel Board for 200 HP VT Pump Set ( As per Annexure - 01A ) 1 Job 0.00 0.00
8 FASD Starter cum Panel Board for 100 HP VT Pump Set ( As per Annexure - 02A ) 2 job 0.00 0.00
9 FASD Starter of 95 amp for 50 HP VT Pump Sets. (As Per Annexure -03A) 2 job 0.00 0.00
10 FASD starter of 195 amp for 125 HP CF Pump Set ( As per Annexure - 4A ) 1 job 0.00 0.00
11 Cost for supplying and fitting followings in the soft starter of 147,215 HP pump sets are i. HRC Fuse - 06 nos. ii. MCCB 1000 amp - 2 nos iii. TP contactor 220 volt control-01 no. iv.ON/OFF Switch- 02 nos v. soft starter control kit - 01 vi. Soft starter display kit board - 01 vii. soft starter display cable 29 p/38 p flat cable -01 viii.Relay meter ( control line) - 01, ix.Auto switch- 01,x. Relay meter (MPR) - 01 ,xi. single phase preventer- 01,xii. Four step self starting relay- 01,xiii. Amp volt control meter- 01, xiv.MCB- 04 way 63 amp - 01,xv. 63 amp single phase - 04 no. , xvi.2 amp - 6 no.xvii contractor model LC1E 1201, 4 pole 12 amp- 6 nos.xviii LED- 15 nos. xix 110 volt,LED - 06 nos, 440 volt 2 P/Job 0.00
12 Cost of desilting of Existing silt deposition in inlet, outlet drain, sump, extra area and making and fitting of MS grating, rubbing and painting of grating etc. (As per Annexure -07) 1 job 0.00 0.00
13 Complete the Mention Misc. work as per instruction of E/I:- 1 job 0.00
A. Providing & Instalation of name plate of Buidco.
B. Writing the name details of officers & Pump operator, Sweeper on the wall with paint.
C. Providing Log book & other Required registers/Misc.
D. Providing & Installation of Fire Extinguisher.
E. Providing & availablity of 24 hrs x 365 days in sufficient Qty. required Safety materials as per Instruction of E/I.
14 Making and fitting water level sump gauge in sump 1 job 0.00
15 Over head Motorised Chain pulley block crane with Panel - 10 Ton 1 Nos. 0.00
16 Spray painting over Double coat of paint with red oxide primer of all Existing MS Structure & all Electromechanical equipments by removing old paints 1 Job 0.00
17 Deployment of 02 nos.x 02 shifts Road sweepars with all required tools & accessories for cleaning & Screening at Yogipur DPS during period 1st April 2026 to 31st May 2026 , 04 nos. x03 shifts from 01.06.2026 to 15.10.2026 and 02 nos.x 02 shifts from 16.10.2026 to 31.03.2027 . (The Qty. of Sweeper may be increase or Decrease as per situation & Direction of Engineer-In-Charge) 2556 P/Staff 0.00
18 Deployment of 01 nos.x 3 shifts Highly Skilled Technician cum pump operators during period 1st April 2026 to 31st May 2026 , 02 nos. x 03 shifts from 01.06.2026 to 15.10.2026 and 01 nos.x 3 shifts from 16.10.2026 to 31.03.2027 1506 P/Staff 0.00
19 Maintenance of miscllaneous work of all Electro machineries for the period of (01.04.2026 to 31.03.2027) at ASHOK NAGAR DPS.The Bidder shall be totally responsible for Proper Functioning of DPS with immediate minor & major work repairing like burning of motor, transformer, panel, starters, Pump operation, Functionality of Sluice gate & any other equipments installed or to be install should be Functional in this DPS, Cleaning of Campus, Sprinkling of Bleaching Powder, proper flood light, fan, chair, rubber mat, transportation and loading, unloading of any equipment/material, repairing of civil structure during emergency for water draining ,functionality of CCTV with recharge etc. as per Direction of E/I.Payment will be made only if work other than the above 18 items is done. 1 P/Lot 0.00
Work & quantity may vary. Total Amount 0.00
Name Of Work :- Repairing and servicing of 200 HP VT motor and pump
sl.no. Description of work Qty unit rate (Rs.) amount (Rs.)
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 200 HP VT motor and pump and all electrical connection of motor, taking down motor from from its base by top lifting of motor from motor stool and stacking the motor at proper place 1 job 0.00
2 Cost for providing labour, tools and tackles at site for opening and taking out discharge tee, column pipe, bowl mouth assembly, etc. of 200 HP VT pump. 1 job 0.00
3 Cost for transportation of pump accessories and motor from DPS to work shop and workshop to DPS including hydra and transport vehicle etc. with loading and unloading 1 job 0.00
4 Cost for complete opening of 200 HP motor part by part & taken out of top & bottom bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size. 1 job 0.00
5 S/F of DE and NDE bearings of appropriate size. 2 no. 0.00
6 Cost for greasing the bearing of motor and varnishing, heating & taping of enamelled copper winding wire including required materials like grease and varnish-6 lit. etc. 1 job 0.00
7 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place etc. 1 job 0.00
8 Cost for opening and dismentling of bowl assembly of 200 HPVT pump, taking out pump shaft, upper & lower bowl mouth, impeller, upper and lower bushes, etc in workshop. 1 job 0.00
9 Cost for checking pump shaft, head shaft & line shaft on lathe for straightness and strenghtening the same on hydraulic press machine. 3 nos. 0.00
10 Remetaling and rethreading at both ends upto 3" length on top and line shaft. 3 no. 0.00
11 Cost of making, supply and fitting line shaft bronze bush of size 65mm ID 85mm OD 150mm length 2 nos. 0.00
12 Cost for making and supplying stuffing box bronze bush of size 63mm ID 83mm OD 150mm length 1 nos. 0.00
13 Cost for making and fitting of SS 416 shaft coupling by cutting and making internal thread of size 65mm ID 85mm OD 145mm Length 2 nos. 0.00
14 Cost of making, supply and fitting bell mouth bronze bush of size 65mm ID 85mm OD 125mm length 1 nos. 0.00
15 Cost for supply and fitting of SS 416 shaft sleeve of size 65mm ID 85mm OD 150 mm length 2 job 0.00
17 Cost for repairing of rachet plate by doing CI welding, grinding & finishing and making 12 nos, sharp edge of proper size and sample by grinding machine 1 job 0.00
18 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 job 0.00
19 Cost for supplying and fitting following:-
Stuffing box packing 5 kg 0.00
Key for shaft sleeve 1 no. 0.00
Key for pump shaft. 1 no. 0.00
Ratchet pin SS 410 8 no. 0.00
20 Cost for reassembling of pump accessories such as bowl mouth bush, impeller, pump shaft, etc. in bowl housing in the work shop 1 job 0.00
21 Cos for scraching old paint of column pipe and discharge pipe and doing one coat primer with red oxide and painting two coats with black japan paint. 1 job 0.00
22 Cost for supplying and fitting SS bolts & nuts with plane and spring washers of size for discharge header, column pipe & bowl mouth assembly 127 nos. 0.00
23 Cost for supply of TVS make steel bolts with threading on both ends complete with washer and nuts as per size & sample 8 nos. 0.00
24 Cost for supplying and fitting rubber insertion sheet of size 1/8" thick (black) 30 kg 0.00
25 Cost for fitting materials such as cotton waste, grease, gland packing, emery paper, petrol etc required at the time of fitting of pump. 1 job 0.00
26 Cost for fitting of pump accessories and lowering such as ccolumn pipe, bowl mouth assembly, discharge tee line shaft, all spider bushes, etc into the sump. 1 job 0.00
27 Cost for placing of motor on its base, doing coupling of motor & pump, doing all electric connection of motor and testing on full load. 1 job 0.00
28 Deduct : Cost of scrap materials Bronze 6 kg 0.00
29 Deduct : Cost of scrap materials Stainless steel 5 kg 0.00
Work & quantity may vary. 0.00
Name of work - Repairing of 250 FASD air break Starter & control panel for operation of 200 HP motor
SI.No Particular Qty unit Rate Amount
1 Providing all Labours,tool & tackles for repairing of 200 HP fully automatic star - delta air break starter with supply,changing and fitting contactor, timer, over load realy unit, push botton and changing all internal wiring with suitable PVC Wire & strip as required.
Contactor 300 amp 1 no. 0.00
Timer (0-30)sec 1 no. 0.00
Thermal Over load relay unit having (84.6 - 135) Amp 1 no. 0.00
Push Button 2 no. 0.00
C.T Coil 200/5 3 no. 0.00
C10 MCB 4 no. 0.00
Single phase preventer 1 no. 0.00
Total Cost - 0.00
Name Of Work :- Repairing and servicing of 100 HP VT motor and pump
sl.no. Description of work Qty Unit rate (Rs.) amount (Rs.)
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 100 HP VT motor and pump and all electrical connection of motor, taking down motor from from its base by top lifting of motor from motor stool and stacking the motor at proper place 1 job 0.00
2 Cost for providing labour, tools and tackles at site for opening and taking out discharge tee, column pipe, bowl mouth assembly, etc. of 100 HP VT pump. 1 job 0.00
3 Cost for transportation of pump accessories and motor from DPS to work shop and workshop to DPS including hydra and transport vehicle etc. with loading and unloading 1 job 0.00
4 Cost for complete opening of 100 HP motor part by part & taken out of top & bottom bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size. 1 job 0.00
5 S/F of DE and NDE SKF make bearings of appropriate size 2 no. 0.00
6 Cost for greasing the bearing of motor and varnishing, heating & taping of enamelled copper winding wire including required materials like grease and varnish-6 lit. etc. 1 job 0.00
7 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place etc. 1 job 0.00
8 Cost for opening and dismentling of bowl assembly of 50 HPVT pump, taking out pump shaft, upper & lower bowl mouth, impeller, upper and lower bushes, etc in workshop. 1 job 0.00
9 Cost for checking pump shaft, head shaft & line shaft on lathe for straightness and strenghtening the same on hydraulic press machine. 3 nos. 0.00
10 Remetaling and rethreading at both ends upto 3" length on top and line shaft. 3 no. 0.00
11 Cost of making, supply and fitting line shaft bronze bush of size 58mm ID 78mm OD 125mm length 2 nos. 0.00
12 Cost for making and supplying stuffing box bronze bush of size 58mm ID 78mm OD 100mm length 1 nos. 0.00
13 Cost for making and fitting of SS 416 shaft coupling by cutting and making internal thread of size 55mm ID 80 OD 145mm Length 2 nos. 0.00
14 Cost of making, supply and fitting bell mouth bronze bush of size 60mm ID 80mm OD 150mm length 1 nos. 0.00
15 Cost for supply and fitting of SS 416 shaft sleeve of size 58mm ID 78mm OD 150mm length 1 job 0.00
16 Cost for making and supplying lantern ring of size 1 job 0.00
17 Cost for supplying and fitting following:-
(iii) Key for shaft sleeve 1 no. 0.00
(iv) Key for pump shaft. 1 no. 0.00
(v) Rubber coupling bush 6 no. 0.00
(vi) steel coupling bolts 6 no. 0.00
(vii) Ratchet pin SS 410 8 no. 0.00
18 Cost for repairing of rachet plate by doing CI welding, grinding & finishing and making 12 nos, sharp edge of proper size and sample by grinding machine 1 job 0.00
19 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 job 0.00
20 Cost for reassembling of pump accessories such as bowl mouth bush, impeller, pump shaft, etc. in bowl housing in the work shop 1 job 0.00
21 Cost for scrathing old paint of column pipe and discharge pipe and doing one coat primer with red oxide and painting two coats with black japan paint. 1 job 0.00
22 Cost for supplying and fitting SS bolts & nuts with plane and spring washers of size for discharge header , column pipe and bowl mouth assembly 127 nos. 0.00
24 Cost for supply of TVS make steel bolts with threading on both ends complete with washer and nuts as per size & sample 8 nos. 0.00
25 Cost for supplying and fitting rubber insertion sheet of size 1/8" thick (black) 20 kg 0.00
27 Cost for fitting materials such as cotton waste, grease, gland packing, emery paper, petrol etc required at the time of fitting of pump. 1 job 0.00
28 Cost for supplying and filling mobile lubricant 15 ltr 0.00
29 Cost for fitting of pump accessories and lowering such as ccolumn pipe, bowl mouth assembly, discharge tee line shaft, all spider bushes, etc into the sump. 1 job 0.00
30 Cost for placing of motor on its base, doing coupling of motor & pump, doing all electric connection of motor and testing on full load. 1 job 0.00
31 Deduct : Cost of scrap materials Bronze 5 kg 0.00
32 Deduct : Cost of scrap materials Stainless steel 4 kg 0.00
Work & quantity may vary. 0.00
Name of work - Repairing of 100 HP FASD air break Starter cum control panel for operation of 100 HP motor
SI.No Particular Qty Unit Rate Amount(RS)
1 Providing all Labours,tool & tackles for repairing of 100 HP fully automatic star - delta air break starter cum panel with supply,changing and fitting, contactor, timer, over load realy unit, push botton and changing all internal wiring with suitable PVC Wire & strip as required.
Contactor MNX 140 amp 1 no. 0.00
Timer (0-30)sec 1 no. 0.00
Thermal Over load relay unit having (84.6 - 135) Amp 1 no. 0.00
Push Button 2 nos. 0.00
C.T Coil 100/5 3 nos. 0.00
Single phase preventer 1 no. 0.00
Multifunction LED meter CI 0.5s 1 no. 0.00
Selector switch 16 Amp 2 nos. 0.00
Phase indicating lamp 3 nos. 0.00
Name Of Work :- Repairing and servicing of 50 HP motor pump and its accessories
sl.no. Description of work Qty unit rate amount
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 50 HP VT motor and pump and all electrical connection of motor, taking down motor from from its base by top lifting of motor from motor stool and stacking the motor at proper place 1 job 0.00
2 Cost for providing labour, tools and tackles at site for opening and taking out discharge tee, column pipe, bowl mouth assembly, etc. of 50 HP VT pump. 1 job 0.00
3 Cost for transportation of pump accessories and motor from DPS to work shop and workshop to DPS including hydra and transport vehicle etc. with loading and unloading 1 job 0.00
4 Cost for complete opening of 50 HP motor part by part & taken out of top & bottom bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size. 1 job 0.00
5 S/F of DE and NDE SKF make bearings of appropriate size 2 no. 0.00
6 Cost for greasing the bearing of motor and varnishing, heating & taping of enamelled copper winding wire including required materials like grease and varnish-6 lit. etc. 1 job 0.00
7 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place etc. 1 job 0.00
8 Cost for opening and dismentling of bowl assembly of 50 HPVT pump, taking out pump shaft, upper & lower bowl mouth, impeller, upper and lower bushes, etc in workshop. 1 job 0.00
9 Cost for checking pump shaft, head shaft & line shaft on lathe for straightness and strenghtening the same on hydraulic press machine. 3 nos. 0.00
10 Remetaling and rethreading at both ends upto 3" length on top and line shaft. 3 no. 0.00
11 Cost of making, supply and fitting line shaft bronze bush of size 43mm ID 63mm OD 150mm length 2 nos. 0.00
12 Cost for making and supplying stuffing box bronze bush of size 43mm ID 63mm OD 125mm length 1 nos. 0.00
13 Cost for making and fitting of SS 416 shaft coupling by cutting and making internal thread of size 43mm ID 63 OD 145mm Length 2 nos. 0.00
14 Cost of making, supply and fitting bell mouth bronze bush of size 45mm ID 65mm OD 150mm length 1 nos. 0.00
15 Cost for supply and fitting of SS 416 shaft sleeve of size 48mm ID 68mm OD 150mm length 1 job 0.00
16 Cost for repairing of rachet plate by doing CI welding, grinding & finishing and making 12 nos, sharp edge of proper size and sample by grinding machine 1 job 0.00
17 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 job 0.00
18 Cost for supplying and fitting following:-
(i) 'o' rings 3 nos. 0.00
(ii) Stuffing box packing 3 kg 0.00
(iii) Key for shaft sleeve 1 no. 0.00
(iv) Key for pump shaft. 1 no. 0.00
(v) Rubber coupling bush 6 no. 0.00
(vi) steel coupling bolts 6 no. 0.00
(vii) Ratchet pin SS 410 8 no. 0.00
19 Cost for reassembling of pump accessories such as bowl mouth bush, impeller, pump shaft, etc. in bowl housing in the work shop 1 job 0.00
20 Cost for scrathing old paint of column pipe and discharge pipe and doing one coat primer with red oxide and painting two coats with black japan paint. 1 job 0.00
21 Cost for supplying and fitting SS bolts & nuts with plane and spring washers of appropriate size for discharge header, column pipe & bowl mouth assembly 127 nos. 0.00
22 Cost for supply of TVS make steel bolts with threading on both ends complete with washer and nuts as per size & sample 8 nos. 0.00
23 Cost for supplying and fitting rubber insertion sheet of size 1/8" thick (black) 20 kg 0.00
24 Cost for fitting materials such as cotton waste, grease, gland packing, emery paper, petrol etc required at the time of fitting of pump. 1 job 0.00
25 Cost for fitting of pump accessories and lowering such as column pipe, bowl mouth assembly, discharge tee line shaft, all spider bushes, etc into the sump. 1 job 0.00
26 Cost for placing of motor on its base, doing coupling of motor & pump, doing all electric connection of motor and testing on full load. 1 job 0.00
27 Deduct : Cost of scrap materials Bronze 5 kg 0.00
28 Deduct : Cost of scrap materials Stainless steel 4 kg 0.00
Work & quantity may vary. Total 0.00
Name of work - Repairing of 75 FASD air break Starter & control panel for operation of 50 HP motor
SI.No Particular Qty unit Rate Amount
1 Providing all Labours,tool & tackles for repairing of 50 HP fully automatic star - delta air break starter with supply,changing and fitting Citiation M type contactor 110 amp, timer, over load realy unit, push botton and changing all internal wiring with suitable PVC Wire & strip as required.
Contactor 110 amp 1 no. 0.00
Timer (0-30)sec 1 no. 0.00
Thermal Over load relay unit having (56.4-90) Amp 1 no. 0.00
Push Button 2 nos. 0.00
Single phase preventer 1 no. 0.00
Ammeter (0-150) amp 1 no. 0.00
Voltmeter(0-500)Volt 1 no. 0.00
Name of work - Repairing and servicing of 125(E) HP CF pump and motor
Sl. Particulars Qty Unit Rate Amount
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 125 HP CF pump and motor of motor and opening all nut and bolt of pump casing and from foundation base, taking down motor from its base by top lifting of motor and stacking the motor at proper place including hydra/crane 1 job 0.00
2 Cost for complete opening of 125 HP C/F motor part by part & taken out of DE & NDE bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size including cost of hiring charge of welding machine, labour, tool & tackles all complete job. 1 job 0.00
3 Cost for greasing bearing and taping, heating & varnishing of enamelled copper winding wire including required materials like grease and varnish including all labours, tools and tackles etc. 1 job 0.00
4 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place including labour, tools & tackles etc. 1 job 0.00
5 Cost for providing all labours, tools and tackles at trolly for fitting of 125 HP C/F motor on foundation base and refitting nut bolts & testing also. 1 nos 0.00
6 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from pump casing including all labour, tools & tackles etc. at workshop. 1 job 0.00
7 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. 1 job 0.00
8 Cost for making,supply and fitting of bronze bush including cutting, turning, polishing and finishing of size. 88 mm ID x 112 mm OD x 210 mm length 1 no. 0.00
9 Cost for supply and fitting of S-cylindrical Roller bearing no.of appropriate size for 125 HP Electric pump with GST,CP & labour cess etc 1 nos 0.00
10 Cost for supply and fitting of Spherical Roller bearing no.of appropriate size for 120 HP Electric pump with GST,CP & labour cess etc 1 nos 0.00
11 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. 1 Set 0.00
12 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. 1 job 0.00
13 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. 1 Set 0.00
14 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
15 Cost for supplying all labours, tools & tackles at site for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 job. 0.00
16 providing all labours, tools, tackles for installation of 125 HP C/F pump and motor on foundation,refitting nut-bolt & testing on unload. 1 job. 0.00
17 Cost for supplying and fitting bolts and nuts of different sizes with washer labours, tools & tackles. 10 Kg 0.00
18 Cost for supplying, making and fitting SS bolt for coupling as per size and sample labours, tools & tackles. 10 nos 0.00
19 Cost for transportation of pump and its accessories from store yard to firm workshop and back to store yard . 2 job 0.00
20 Cost for providing all labour, tools and tackles at site for opening electrical connection of 5 HP vacuum pump motor, foundation bolts and nuts of pump, GI flange and taking out and removing it from base. 1 jobs. 0.00
21 Cost for dismantling of 5 HP vacuum pump for taking out impeller, pump shaft, etc and cleaning all the components for ready for repair. 1 jobs. 0.00
22 Cost for repairing of steel shaft by remetalling on cut point, turning and polishing of the shaft and making key way groove. 1 jobs. 0.00
23 Cost for supplying and fitting ball bearing no. 6306ZZ of SKF if required.. 1 nos. 0.00
24 Cost for supplying and fitting oil seal as per sample. 1 nos. 0.00
25 Cost for fitting materials such as packing paper, grease, gland packing, nuts and bolts, cotton waste etc required at the time of fitting of pump. 1 jobs. 0.00
26 Cost for reassembling of pump with shaft, impeller, bearing set, oil seal, etc accessories in work shop. 1 jobs. 0.00
27 Cost for providing all labour, tools and tackles for reinstallation of motor and pump on base and doing electrical connections and testing all complete. 1 jobs. 0.00
28 Cost for cutting and removing burnt cable sockets and doing cable socketing of 4 mm² 3 core copper cable of both motor and starter. 3 nos. 0.00
29 Cost for supplying star rubber coupling and fitting of coupling as per direction of E/I 3 nos. 0.00
30 Deduct : Cost of Scrap materials of bronze 5 Kg 0.00
Total cost 0.00
Name of work - Repairing of 125 FASD air break Starter cum control panel for operation of 125 HP motor TM
SI.No Particular Qty Unit Rate Amount
1 Providing all Labours,tool & tackles for repairing of 120 HP fully automatic star - delta air break starter cum panel with supply,changing and fitting contactor, timer, over load realy unit, push botton and changing all internal wiring with suitable PVC Wire & strip as required.
Timer (0-30)sec 1 no. 0.00
Thermal Over load relay unit having (86.4 - 135) Amp 1 no. 0.00
Push Button 2 no. 0.00
C.T Coil 200/5 3 no. 0.00
Single phase preventer 1 no. 0.00
Ammeter (0-150) amp 1 no. 0.00
Voltmeter(0-500)Volt 1 no. 0.00
selector switch 16 Amp 2 no. 0.00
Phase indicating lamp 3 no. 0.00
Repairing & servicing of 147/215 HP Sub Pump Set
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for dissconnecting the 147/215 HP submersible pump set and taking out 150 sub. Pump set from sump house and loading on pickup van for transportation of pump motor assembly from site to work shop for repairing work including hydra/crane 1 p/job 0.00
2 Cost for opening and dismentling of 147/215 HP sub. Motor pump assembly and taking out impeller from motor pump assembly. 1 p/job 0.00
3 Cost for varnishing and heating of stator to required level of insulation and inspecting the insulation level at regular interval for 36 hours 1 p/job 0.00
4 Cost for supplying and fitting copper cable socket, cable entry kit 2 each 0.00
5 Cost for supplying and fitting nitril rubber 'o' rings, joint rubber gasket, lip seal, spring washer, neck ring including labour tool and tackles 1 each 0.00
6 Cost for making, supplying and fitting mechanical lock, mechanical seal (motor side) and primary seal (pump side) including labour, tool and tackles all complete job. 1 p/set 0.00
7 Cost for supplying following :-
mobil 15 p/ltr 0.00
servo bearing grease 5 p/kg 0.00
nuts, bolts and key of different sizes i.e. dome type, hex nut bolt etc. 1 p/set 0.00
8 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 p/job 0.00
9 Cost for assembly of all parts of 147/215 hp submersible pump at workshop including all labour tool and tackles. 1 p/job 0.00
10 Cost for transportation of pump motor assembly from workshop to pump house after repair including all cost of labour for loading and providing all labours, tools and tackles at site for lowering of motor pump assembly, fitting and fixing of pump motor assembly to discharge pipe and testing on full load. 1 p/job 0.00
Total Cost 0.00
Name of Work-Repairing &servicing of 450/500 KVA Transformer
Sl. No. Particulars of work Qty. Unit Rate Amount (in Rs.)
1 Cost for providing all labours, tools and tackles at site for opening and dismantling all electrical connections of HT and LT of450/500 KVA transformer, loading and unloading the transformer on transportation vehicle by using hydraulic crane including the hire cost and reinstallation, commissioning after repairing at the DPS. 1 P/job 0.00
2 Cost for opening the top cover and dismentling the same for taking out HT and LT coils from transformer body after draining out transformer oil and stacking in a container, taking out sludge of transformer oil and cleaning inside of transformer body and radiator fins by blowing pressurised oil. 1 P/job 0.00
3 Cost for providing all labours and tools and taking out HT and LT coil from transformer body by using chain pulley block 1 P/job 0.00
4 Cost for supplying and fitting following :-
(i) LT stud of copper 3 Each 0.00
(ii) LT bush 3 Each 0.00
(iii) HT stud of copper 3 Each 0.00
(iv) HT bush 3 Each 0.00
(v) Rubberized gasket 1 Each 0.00
5 Cost for supplying and filling of tranformer oil. 100 P/ltr. 0.00
6 Cost for transformer oil filtration 430 P/ltr. 0.00
7 Cost for cutting and removing old and damaged cable socket of LT cable of transformer and doing cable socketing including the cost of 185 mm² cable socket and all requisite insulating materials such as glass tape, PVC tape, empire Tape, etc. 3 Each 0.00
8 Cost for tightening of HT & LT studs after refilling of transformer oil and fitting of top cover with ruberised gasket and re-installing equalizing pipes, etc all complete work. 1 P/job 0.00
9 Cost for providing all labours, tools and tackles at site for opening and dismantling of 400 Amp. AB switch such as male & female contact, knife type contact, cleaning & washing each component with petrol properly and resetting them all complete job. 1 P/job 0.00
10 Cost for supplying & fitting following spares. :-
i. Post insulator. 2 Each 0.00
ii. Horn gap fuse. ( 1 pcs = 3 nos.) 2 Each 0.00
iii. Net fuse for 400 Amp. AB switch. (1 pcs =3 nos.) 2 Each 0.00
iv. Copper wire 6 SWG. 2 P/kg 0.00
v. GI bolts & nuts with washer of different sizes 1.5 P/kg 0.00
vi. Knife type male & female contact for 400 Amp. AB switch. ( 1 Pcs = 3 nos) 1 Each 0.00
vii Rabit conductor for connection of main ncoming feeder. 5 P M 0.00
viii Fuse wire 19 no. 0.5 P/kg 0.00
11 Deduct : Cost of Scrap materials Copper -4 P/kg 0.00
Name of work- Cleaning and desilting of sump approach channel, outlet channel etc.
Sl. No. Particulars Qty Unit Rate Amount(Rs.)
BCD SOR 2.24.1 Road Sweeper Analysis for desilting,
Assume 1 sweeper required for 1 m3
In or under water and/or liquid mud, including pumping out water as required and etra due to slow progress and dewatering 20% of the rate of item
1. Ashok nagar DPS
1 complete cleaning of filled up sump in all lift and disposal of soil up to a lead of 50 mtr. as required and including all labour, tools & tackles 249.20 m3 0.00
Gr-02 (4) Name of Work :- Complete Annual Repairing, overhauling, servicing, operation & maintenance for electromechanical equipment of TV TOWER DPS under KANKARBAGH anchal, Works Division, BUIDCO for monsoon 2026. (From 01st April 2026 to 31st March 2027)
Sl. No. Particulars of work Qty. Unit Rate in Rs. Amount (in Rs.)
1 Complete repairing and overhauling of 150 HP centrifugal pump & Motor by taking out motor pump set, repairing and servicing of 150 HP motor Work & quantity may vary.( As per Annexure - 1 ) 3 Job 0.00 0.00
2 Complete repairing and overhauling of 50 HP centrifugal pump & Motor by taking out motor pump set,repairing and servicing of 50 HP motor Work & quantity may vary.(As per Annexure - 2) 1 Job 0.00 0.00
3 Complete repairing and overhauling of 75 HP VT pump & Motor set (As per Annexure - 03) 1 Job 0.00 0.00
4 FASD starter of 140 amp for 150 HP CF pump (As per Annexure-1A) 3 Job 0.00 0.00
5 FASD starter of 60 amp for 50 HP CF pump ( As per Annexure - 2A ) 1 Job 0.00 0.00
6 Soft starter of 195 amp for 75 HP VT pump ( As per Annexure - 3A ) 1 Job 0.00 0.00
7 Outdoor Transformer 315 KVA, AB Switch & DP Structure of 11 KV Electric Sub-station. (As per Annexure - 4) 2 Job 0.00 0.00
8 Outdoor Transformer 150 KVA, AB Switch & DP Structure of 11 KV Electric Sub-station. (As per Annexure - 5) 1 Job 0.00 0.00
9 Complete Reparing ,Overhauling ,Servicing & Functionlity of 05 Ton Manually Chain pulley block Over head crane mounted on DPS as Per Direction of Engineer-in-Charge. 1 Job 0.00
10 Providing & installation of New water level Gauge 1 Job 0.00
11 Cleaning & Desilting of Existing sump .(As Per Annexure -6) 1 Job 0.00 0.00
12 Deployment of Road sweepars 2 no. x 3 shifts from 01.04.2026 to 31.03.2027 2190 Shift 0.00
13 Deployment of Highly Skilled Technician cum pump operators 2 no. x 3 shifts from 01.06.2026 to 15.10.2026 and 1 no. x 3 shifts from 01.04.2026 to 31.05.2026 and from 16.10.2026 to 31.03.2027 1506 Shift 0.00
14 Complete the Mention Misc. work as per instruction of E/I:- 1 job 0.00
A Writing the name details of officers & Pump operator, Sweeper on the wall with paint.
B Providing Log book & other Required registers/Misc.
C Providing & Installation of Fire Extinguisher.
D Providing & availablity of 24 hrs x 365 days in sufficient Qty. required Safety materials as per Instruction of E/I.
15 Maintenance of miscllaneous work of all Electro machanical equipment (electrical/mechanical/electronics) at DPS.The Bidder shall be totally responsible for Proper Functioning of DPS with immediate minor & major work repairing or supplying like burning of motor, transformer, panel, starters, Pump operation, Functionality of Sluice gate & any other equipments installed or to be install should be Functional in this DPS, Cleaning of Campus, Sprinkling of Bleaching Powder, proper flood light, fan, chair, rubber mat, transportation and loading, unloading of any equipment/material, repairing of civil structure during emergency for water draining etc. as per Direction of E/I.Payment will be made only if work other than the above 14 items is done. 1 job (ls) 0.00
Name of work - Repairing and servicing of 150 hp CF pump and motor
Sl. Particulars Qty Unit Rate Amount
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 150 HP CF pump from motor and all electrical connection of motor and opening all nut and bolt of pump casing, from suction line and delivery line and from foundation base. p/job 1 0.00
2 Cost for providing labour, tools and tackles for transportation of motor pump and its accessories loading and unloading from DPS to workshop and back to pump house after repairing work with the help of hydra/crane, pickup van and all necessary to complete job. p/job 1 0.00
3 Cost for complete opening of 150 HP C/F motor part by part & taken out of DE & NDE bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size including cost of hiring charge of welding machine, labour, tool & tackles all complete job. p/job 1 0.00
4 Cost for supplying and fitting bearing 6319 C3 of SKF Make, if required including all labour tools and tackles each 2 0.00
5 Cost for bearing greasing, taping, heating & varnishing of enamelled copper winding wire including required materials like grease and varnish including all labours, tools and tackles etc. p/job 1 0.00
6 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place including labour, tools & tackles etc. p/job 1 0.00
7 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from pump casing including all labour, tools & tackles etc. at workshop. p/job 1 0.00
8 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. p/job 1 0.00
9 Cost for making,supply and fitting of bronze bush including cutting, turning, polishing and finishing of size. 95 mm ID x 119 mm OD x 200 mm length each 1 0.00
10 Cost for supply and fitting of S-cylindrical Roller bearing equivalent for 150 HP Electric pump with GST,CP & labour cess etc each 1 0.00
11 Cost for supply and fitting of Spherical Roller bearing equivalent for 150 HP Electric pump with GST,CP & labour cess etc each 1 0.00
12 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. p/set 1 0.00
13 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. p/job 1 0.00
14 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. p/set 1 0.00
15 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. P/job. 1 0.00
16 Cost for supplying all labours, tools & tackles at workshop for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. P/job. 1 0.00
17 providing all labours, tools, tackles for installation of 150 HP C/F pump on foundation,refitting nut-bolt & testing on load at DPS. P/job. 1 0.00
18 Cost for supplying and fitting bolts and nuts of different sizes with washer labours, tools & tackles TVS make. P/Kg 4 0.00
19 Cost for supplying, making and fitting SS bolt for coupling as per size and sample labours, tools & tackle TVS make. each 10 0.00
20 Deduct : Cost of Scrap materials of bronze P/Kg -5 0.00
Name of work - Repairing of 140 FASD air break Starter cum control panel for operation of 150 HP CF motor
SI.No Particular Qty Unit Rate Amount(RS)
1 Providing all Labours,tool & tackles for repairing of 150 HP fully automatic star - delta air break starter cum panel with supply,changing and fitting, contactor, timer, over load realy unit, push botton and changing all internal wiring with suitable PVC Wire & strip as required.
Contactor MNX 140 amp 1 no. 0.00
Timer (0-30)sec 1 no. 0.00
Thermal Over load relay unit having (84.6 - 135) Amp 1 no. 0.00
Push Button 2 nos. 0.00
C.T Coil 100/5 3 nos. 0.00
Single phase preventer 1 no. 0.00
Multifunction LED meter CI 0.5s 1 no. 0.00
Selector switch 16 Amp 2 nos. 0.00
Phase indicating lamp 3 nos. 0.00
Name of work - Repairing and servicing of 50 hp CF pump and motor
Sl. Particulars Qty Unit Rate Amount
1 Cost for providing all labours, tools and tackles at site for opening all coupling bolts of 50 hp CF pump from motor and all electrical connection of motor and opening all nut and bolt of pump casing, from suction line and delivery line and from foundation base. 1 job 0.00
2 Cost for providing labour, tools and tackles for transportation of motor pump and its accessories loading and unloading from DPS to workshop and back to pump house after repairing work with the help of hydra/crane, pickup van and all necessary to complete job. 1 job 0.00
3 Cost for complete opening of 50 hp C/F motor part by part & taken out of DE & NDE bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size including cost of hiring charge of welding machine, labour, tool & tackles all complete job. 1 job 0.00
4 Cost for supplying and fitting bearing N 313 ECP of SKF Make, if required including all labour tools and tackles 2 nos. 0.00
5 Cost for greasing bearing and taping, heating & varnishing of enamelled copper winding wire including required materials like grease and varnish including all labours, tools and tackles etc. 1 job 0.00
6 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place including labour, tools & tackles etc. 1 job 0.00
7 Cost for dismentalling of all nut & bolt of pump casing, pump with pump shaft, bearing housing from pump casing including all labour, tools & tackles etc. at workshop. 1 job 0.00
8 Cost for re-metaling, turning and polishing of SS 410 pump shaft and rethreading two points & straightening the shaft by hydraulic pressure machine including all labour, tools & tackles etc. 1 job 0.00
9 Cost for supply and fitting of bronze bush including cutting, turning, polishing and finishing of size 53 mm ID x 77 mm OD x 150 mm Length 1 no. 0.00
10 Cost for supply and fitting of deep groove ball bearing no. SKF 6211 2RS1 or equivalent for 50 HP Electric pump with GST,CP & labour cess etc 2 nos 0.00
11 Cost for supply and fitting of thrust bearing no. SKF 51211 in DE or equivalent for 50 HP Electric pump with GST,CP & labour cess etc 1 nos 0.00
12 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 job 0.00
13 Cost for making, supplying and fitting impeller steel key, lock screw and lock washer made of SS 316 with full thread. 1 nos 0.00
14 Cost for supplying and fitting of mechanical seal, oil seal, 'O' rings, water deflector, lantern ring, hexa nut for gland packing, oil filler plug including labour, tools and tackles etc. 1 job 0.00
15 Cost for supplying and fitting lock nut and lock washer for bearing including labour, tools and tackles. 1 Set 0.00
16 Cost for fitting consumable materials such as grease, gland packing 5/8”, cotton waste, packing paper, flexible rubber water thrower etc as required at the time of fitting of pump. 1 job. 0.00
17 Cost for supplying all labours, tools & tackles at workshop for reassembling of bearing housing along with impeller with pump casing and tightening all holding bolts and nuts of pump casing, checking alignment of pump bearing housing, etc all complete. 1 job. 0.00
18 providing all labours, tools, tackles for installation of 50 hp motor & C/F pump on foundation,refitting nut-bolt & testing on load at DPS. 1 job. 0.00
19 Cost for supplying and fitting bolts and nuts of different sizes with washer labours, tools & tackles TVS make. 10 Kg 0.00
20 Cost for supplying, making and fitting SS bolt for coupling as per size and sample labours, tools & tackles. 10 nos 0.00
21 Deduct : Cost of Scrap materials of bronze 4 Kg 0.00
Total Cost 0.00
Name of work - Repairing of 50 FASD air break Starter cum control panel for operation of 50 hp motor
SI.No Particular Qty Unit Rate Amount
1 Providing all Labours,tool & tackles for repairing of 50 hp fully automatic star - delta air break starter cum panel with supply,changing and fitting contactor, timer, over load realy unit, push botton and changing all internal wiring with suitable PVC Wire & strip as required.
Contactor 65 amp 1 no. 0.00
Timer (0-30)sec 1 no. 0.00
Thermal Over load relay unit having (37.6-60) Amp contactor mounting 1 no. 0.00
Push Button 2 nos. 0.00
C.T Coil 100/5 3 nos. 0.00
Single phase preventer 1 no. 0.00
2 Reparing of Panel with changing and fitting, selector switch, copper strip bus bar, pilot lamp, MCCB and changing all interval wiring etc. all complete.
Selector switch 16 Amp 1 nos. 0.00
Bus-bar 400mm x 5mm thick 3 nos. 0.00
Phase indicating lamp 3 nos. 0.00
Name of work - Repairing and servicing of 75 HP VT pump and motor
Sl. Particulars Qty Unit Rate Amount
1 Cost for providing labour, tools and tackles at site for opening all coupling bolts of 75 HP VT motor and pump and all electrical connection of motor, taking down motor from from its base by top lifting of motor from motor stool and stacking the motor at proper place 1 p/job 0.00
2 Cost for providing labour, tools and tackles at site for opening and taking out discharge tee, column pipe, bowl mouth assembly, etc. of 75 HP VT pump. 1 p/job 0.00
3 Cost for transportation of pump accessories and motor from DPS to work shop and workshop to DPS including hydra and transport vehicle etc. with loading and unloading 1 p/job 0.00
4 Cost for complete opening of 75 HP motor part by part & taken out of top & bottom bearing from bearing houshing and repairing of bearing houshing with welding with C.I electrode, turning, and finishing as required shape and size. 1 p/job 0.00
5 S/F of DE and NDE SKF make bearings of appropriate size 2 each 0.00
6 Cost for greasing the bearing of motor and varnishing, heating & taping of enamelled copper winding wire including required materials like grease and varnish-6 lit. etc. 1 p/job 0.00
7 Cost for reassembling of rotor & stator of motor and also fitting of bearing in the bearing houshing at repairing place etc. 1 p/job 0.00
8 Cost for opening and dismentling of bowl assembly of 50 HPVT pump, taking out pump shaft, upper & lower bowl mouth, impeller, upper and lower bushes, etc in workshop. 1 p/job 0.00
9 Cost for checking pump shaft, head shaft & line shaft on lathe for straightness and strenghtening the same on hydraulic press machine. 3 each 0.00
10 Remetaling and rethreading at both ends upto 3" length on top and line shaft. 3 each 0.00
11 Cost of making, supply and fitting line shaft bronze bush of size 58mm ID 78mm OD 125mm length 2 each 0.00
12 Cost for making and supplying stuffing box bronze bush of size 58mm ID 78mm OD 100mm length 1 each 0.00
13 Cost for making and fitting of SS 416 shaft coupling by cutting and making internal thread of size 55mm ID 80 OD 145mm Length 2 each 0.00
14 Cost of making, supply and fitting bell mouth bronze bush of size 60mm ID 80mm OD 150mm length 1 each 0.00
15 Cost for supply and fitting of SS 416 shaft sleeve of size 58mm ID 78mm OD 150mm length 1 each 0.00
17 Cost for supplying and fitting following:-
(i) 'o' rings 3 each 0.00
(iii) Key for shaft sleeve 1 each 0.00
(iv) Key for pump shaft. 1 each 0.00
(v) Rubber coupling bush 6 each 0.00
(vi) steel coupling bolts 6 each 0.00
(vii) Ratchet pin SS 410 8 each 0.00
18 Cost for repairing of rachet plate by doing CI welding, grinding & finishing and making 12 nos, sharp edge of proper size and sample by grinding machine 1 p/job 0.00
19 Repairing of impeller by gas welding at damaged portion, turning, polishing, finishing including supplying all labour, tools and tackles, welding machine hiring, electrode and all consumable items (if required) as per direction of E/I. 1 p/job 0.00
20 Cost for reassembling of pump accessories such as bowl mouth bush, impeller, pump shaft, etc. in bowl housing in the work shop 1 p/job 0.00
21 Cost for scrathing old paint of column pipe and discharge pipe and doing one coat primer with red oxide and painting two coats with black japan paint. 1 p/job 0.00
22 Cost for supplying and fitting SS bolts & nuts with plane and spring washers. 150 each 0.00
25 Cost for supplying and fitting rubber insertion sheet of size 1/8" thick (black) 20 kg 0.00
27 Cost for fitting materials such as cotton waste, grease, gland packing, emery paper, petrol etc required at the time of fitting of pump. 1 p/job 0.00
29 Cost for fitting of pump accessories and lowering such as ccolumn pipe, bowl mouth assembly, discharge tee line shaft, all spider bushes, etc into the sump. 1 p/job 0.00
30 Cost for placing of motor on its base, doing coupling of motor & pump, doing all electric connection of motor and testing on full load. 1 p/job 0.00
31 Deduct : Cost of scrap materials Bronze -5 p/kg 0.00
32 Deduct : Cost of scrap materials Stainless steel -4 p/kg 0.00
Name of work - Repairing of 75 FASD air break Starter cum control panel for operation of 75 HP CF motor
SI.No Particular Qty Unit Rate Amount(RS)
1 Providing all Labours,tool & tackles for repairing of 75 HP fully automatic star - delta air break starter cum panel with supply,changing and fitting, contactor, timer, over load realy unit, push botton and changing all internal wiring with suitable PVC Wire & strip as required.
Contactor MNX 120 amp 1 no. 0.00
Timer (0-30)sec 1 no. 0.00
Thermal Over load relay unit having (84.6 - 135) Amp 1 no. 0.00
Push Button 2 nos. 0.00
C.T Coil 100/5 3 nos. 0.00
Single phase preventer 1 no. 0.00
Multifunction LED meter CI 0.5s 1 no. 0.00
Selector switch 16 Amp 2 nos. 0.00
Phase indicating lamp 3 nos. 0.00
Name of work - Repairing of transformer of 315 KVA transformer and servicing, cleaning, greasing, repairing of AB switch & DP structure of 11 KV electric sub - station
Sl. No Particulars Qty Unit Rate Amount
1 Cost for providing all labours, tools and tackles at site for opening and dismantling all electrical connections of HT and LT of 315 KVA transformer, loading and unloading the transformer on transportation vehicle by using hydraulic crane including the hire cost and reinstallation, commissioning after repairing at DPS 1 jobs. 0.00
2 Cost for opening the top cover and dismentling the same for taking out HT and LT coils from transformer body after draining out transformer oil and stacking in a container, taking out sludge of transformer oil and cleaning inside of transformer body and radiator fins by blowing pressurised oil. 1 jobs. 0.00
3 Cost for providing all labours and tools and taking out HT and LT coil from transformer body by using chain pulley block 1 jobs. 0.00
4 Cost for supplying and fitting following :-
(i) LT stud of copper 2 nos. 0.00
(ii) LT bush 2 nos. 0.00
(iii) HT stud of copper 2 nos. 0.00
(iv) HT bush 2 nos. 0.00
(v) Rubberized gasket 1 nos. 0.00
5 Cost for supplying and filling of tranformer oil. 100 ltrs. 0.00
6 cost for transformer oil filtration 200 ltrs. 0.00
7 Cost for cutting and removing old and damaged cable socket of LT cable of transformer and doing cable socketing including the cost of 185 mm² cable socket and all requisite insulating materials such as glass tape, PVC tape, empire Tape, etc. 2 nos. 0.00
8 Cost for tightening of HT & LT studs after refilling of transformer oil and fitting of top cover with ruberised gasket and re-installing equalizing pipes, etc all complete work. 1 jobs. 0.00
9 Cost for providing all labours, tools and tackles at site for opening and dismantling of 400 Amp. AB switch such as male & female contact, knife type contact, cleaning & washing each component with petrol properly and resetting them all complete job. 1 jobs. 0.00
10 Cost for supplying & fitting following spares. :-
Post insulator. 2 Pcs 0.00
Horn gap fuse. ( 1 pcs = 3 nos.) 2 Pcs 0.00
Net fuse for 400 Amp. AB switch. (1 pcs =3 nos.) 2 Pcs 0.00
Copper wire 6 SWG. 2 kg 0.00
GI bolts & nuts with washer of different sizes 1.5 kg 0.00
Rabit conductor for connection of main ncoming feeder. 5 M 0.00
Fuse wire 19 no. 0.5 Kg 0.00
11 Cost for PVC sleeving suitable to withstand 11 KV power supply for sleeving of 6 SWG jumpher wire 5 Mtr. 0.00
12 Deduct : Cost of Scrap materials Copper 4 kg 0.00
Total cost 0.00
Name of work - Repairing of transformer of 150 KVA transformer and servicing, cleaning, greasing, repairing of AB switch & DP structure of 11 KV electric sub - station
Sl. No Particulars Qty Unit Rate Amount
1 Cost for providing all labours, tools and tackles at site for opening and dismantling all electrical connections of HT and LT of 150 KVA transformer, loading and unloading the transformer on transportation vehicle by using hydraulic crane including the hire cost and reinstallation, commissioning after repairing at DPS 1 jobs. 0.00
2 Cost for opening the top cover and dismentling the same for taking out HT and LT coils from transformer body after draining out transformer oil and stacking in a container, taking out sludge of transformer oil and cleaning inside of transformer body and radiator fins by blowing pressurised oil. 1 jobs. 0.00
3 Cost for providing all labours and tools and taking out HT and LT coil from transformer body by using chain pulley block 1 jobs. 0.00
4 Cost for supplying and fitting following :-
(i) LT stud of copper 2 nos. 0.00
(ii) LT bush 2 nos. 0.00
(iii) HT stud of copper 2 nos. 0.00
(iv) HT bush 2 nos. 0.00
(v) Rubberized gasket 1 nos. 0.00
5 Cost for supplying and filling of tranformer oil. 100 ltrs. 0.00
6 cost for transformer oil filtration 100 ltrs. 0.00
7 Cost for cutting and removing old and damaged cable socket of LT cable of transformer and doing cable socketing including the cost of 185 mm² cable socket and all requisite insulating materials such as glass tape, PVC tape, empire Tape, etc. 2 nos. 0.00
8 Cost for tightening of HT & LT studs after refilling of transformer oil and fitting of top cover with ruberised gasket and re-installing equalizing pipes, etc all complete work. 1 jobs. 0.00
9 Cost for providing all labours, tools and tackles at site for opening and dismantling of 400 Amp. AB switch such as male & female contact, knife type contact, cleaning & washing each component with petrol properly and resetting them all complete job. 1 jobs. 0.00
10 Cost for supplying & fitting following spares. :-
Post insulator. 2 Pcs 0.00
Horn gap fuse. ( 1 pcs = 3 nos.) 2 Pcs 0.00
Net fuse for 400 Amp. AB switch. (1 pcs =3 nos.) 2 Pcs 0.00
Copper wire 6 SWG. 2 kg 0.00
GI bolts & nuts with washer of different sizes 1.5 kg 0.00
Rabit conductor for connection of main ncoming feeder. 5 M 0.00
Fuse wire 19 no. 0.5 Kg 0.00
11 Cost for PVC sleeving suitable to withstand 11 KV power supply for sleeving of 6 SWG jumpher wire 5 Mtr. 0.00
12 Deduct : Cost of Scrap materials Copper 4 kg 0.00
Total Cost 0.00
Name of work- Cleaning and desilting of sump approach channel, outlet channel etc.
Sl. No. Particulars Quantity Rate Amount(Rs.)
BCD SOR 2.24.1 Road Sweeper Analysis for desilting,
Assume 1 sweeper required for 1 m3
In or under water and/or liquid mud, including pumping out water as required and etra due to slow progress and dewatering 20% of the rate of item
complete cleaning of filled up sump in all lift and disposal of soil up to a lead of 50 mtr. as required and including all labour, tools & tackles
1 T V TOWER DPS 80.08 m3 0.00
Sump - Circular sump of radious - 6.95 Height of Mud (Approx) - 1.20 Mtr. =3.14 x 15'x 15' x 4'(avg.) = 2826 cft = 80.08 m3
Sl. No. Abstract Amount
Gr02 (1) Complete Annual Repairing, overhauling, servicing, operation & maintenance for electro-mechanical equipment of NBCC Yogipur DPS under Kankarbagh Anchal, Works Division, BUIDCO for the session 2026-27.( From 01st April 2026 to 31st March 2027 ) 0.00
Gr02 (2) Annual repairing,overhauling,servicing ,operation & maintenance of all electromechanical equipments of Storm Drainage Pumping Station YOGIPUR under Kankarbagh Anchal, Works Division, BUIDCo, Patna for the monsoon year 2026-27 ( From 01st April 2026 to 31st March 2027 ) 0.00
Gr02 (3) Annual repairing,overhauling,servicing ,operation & maintenance of all electromechanical equipments of Storm Drainage Pumping Station ASHOK NAGAR under Kankerbagh Anchal, Works Division, BUIDCo, Patna for the monsoon year 2026-27 ( From 01st April 2026 to 31st March 2027 ) 0.00
Gr02 (4) Complete Annual Repairing, overhauling, servicing, operation & maintenance for electromechanical equipment of TV TOWER DPS under KANKARBAGH anchal, Works Division, BUIDCO for monsoon 2026. (From 01st April 2026 to 31st March 2027) 0.00
Project Director (Mech)
Patna Central (Mech) Works Division
Malahi Pakri, BUIDCo, Patna.
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
SBD Gr02.docx
NIT • 0.41 MB
NIT01.pdf
NIT • 1.96 MB
FINANCIAL02 (2).xlsx
NIT • 0.07 MB
C4 Prebid Meeting Proceeding.pdf
Corrigendum • 2.90 MB
C3 Corrigendum2.pdf
Corrigendum • 0.34 MB
C2 cORRIGENDUM1.pdf
Corrigendum • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .