Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-GST Mismatch |
Tender Value
₹1.2 L
EMD Value
₹3,630
Closing Date
14 Sept 2026, 4:30 pmClosed
Executive Engineer Irrigation Division Anantnag
Office of the EXEN ID Anantnag
Construction of lining wall on right side and Bed treatment of Shah 1st near RD 1100 mtrs
2026_IFC_322946_11
E-NIT No. 15 of 2026-27
Open Tender
Civil Works
Percentage
12 days
ID Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Irrigation Division Anantnag
₹3,630
20 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
14 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 8.96 | Cum | 592.9 | ₹5,312.38 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.15 | Cum | 5,202.9 | ₹16,389.14 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 11.25 | Cum | 6,591.25 | ₹74,151.56 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 36 | Sqm | 286.35 | ₹10,308.6 |
| 5Carriage of materials from source upto Road site of work by M.T. and H.L 55 m | |||||
| 6.01 | Cement by an average lead of 06 km. | 4.13 | M.T | 330.62 | ₹1,365.46 |
| 6.02 | Sand by an average lead of 33 km. | 6.48 | cum | 797.82 | ₹5,169.87 |
| 6.03 | Stone aggregates 20 mm by an average lead of 20 km. | 10.13 | cum | 654.3 | ₹6,624.79 |
| 6.04 | Stone aggr 4o mm by an average lead of 20 km. | 2.84 | cum | 709.81 | ₹2,012.31 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1085631.xls
BOQ • 0.27 MB
corrinit15.pdf
PDF • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .