Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.1 LAccepted-Finance | ₹62.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹64.8 L+₹2.7 L (4.36%)Accepted-Finance | ₹64.8 L+₹2.7 L (4.36%) | L2 | Accepted-Finance L2 |
| 3 | L3₹67.5 L+₹5.4 L (8.71%)Accepted-Finance | ₹67.5 L+₹5.4 L (8.71%) | L3 | Accepted-Finance L3 |
Tender Value
₹89.9 L
EMD Value
₹1.8 L
Closing Date
16 Mar 2026, 6:00 pmClosed
Executive Enigneer
PWD Division Udhampur
Upgradation of Udhampur- Ghordi road km 13th to 26th from single lane to double lane (Under UT Capex Permanent Restoration)
2026_PWDJK_305862_1
Enit No. 163 of 2025-26 dated 11.03.2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Engineer PWD Division Udhampur
₹1.8 L
6 Apr 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, 1 meter from cutting edge All kinds of soil | 31.5 | Cum | 479.3 | ₹15,097.95 |
| 2Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, esspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres | |||||
| 2.1 | All kind of soil @80% | 898.59 | Cum | 256.85 | ₹2,30,802.84 |
| 2.2 | Ordinary rock @20% | 16.03 | Cum | 493.5 | ₹7,910.81 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 7.94 | cum | 4,826.5 | ₹38,322.41 |
| 4 | Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -- All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone agg. 20 mm nominal size) crushed. With 20% plums | 484.68 | cum | 4,774.46 | ₹23,14,085.27 |
| 5 | Dumpimg stone including cost of stones. in Horizontal on level | 540 | Cum | 937.9 | ₹5,06,466 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1,286.08 | cum | 218.4 | ₹2,80,879.87 |
| 7 | 12mm Cement plaster of mix:1 : 6 ( 1 cement : 6 coarse sand) | 54 | Sqm | 266.2 | ₹14,374.8 |
| 8 | Hand packed stone filling in wire crates incl. cost of stone & wire crates size 6.00 m X1.20X1.20 G.I. wire crates having wire diameter 4 mm with mesh spacing 100 mm x 100 mm mechanically woven diagonally | 2,306.88 | Cum | 1,649.85 | ₹38,06,005.97 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_993269.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .