Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 CrAccepted-AOC 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹8.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.2 Cr+₹1.1 Cr (13.2%)Rejected-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹9.2 Cr+₹1.1 Cr (13.2%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.5 Cr+₹1.3 Cr (16.2%)Rejected-Finance PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹9.5 Cr+₹1.3 Cr (16.2%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | S.P.R.U INFRATECH PRIVATE LIMITED L3 | M/S CHAUDHARY ENTERPRISES L1 | ARVIND KUMAR SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle and thorney bushes without uprooting including cost of all labour and T&P etc. required for proper completion of work. As per directions of Engineer -in -charge. | 1,18,317.75 | Sqm | 5 ₹5,91,588.75 | 2 ₹2,36,635.5 Lowest | 4 ₹4,73,271 |
| 2.00 | Earth work in excavation of foundation including all lead upto & lift, labour and T&P etc with manual compaction and dressing to profile. As per directions of Engineer -in -charge. | 6,273.91 | Cum | 113 ₹7,08,951.83 | 90 ₹5,64,651.9 Lowest | 100 ₹6,27,391 |
| 3.00 | E/W in cutting / filling and making proper side slope for laying boulder and fillter material with proper disposal and manual compaction.. As per directions of Engineer -in -charge. | 12,689.95 | Cum | 95 ₹12,05,545.25 | 85 ₹10,78,645.75 Lowest | 90 ₹11,42,095.5 |
| 4.00 | Construction of sub grade by earthen shoulders with all lead & lift including Mechanical compaction and all cost of labour, T&P etc. Required for Proper completion of work | 35,714.75 | Cum | 152 ₹54,28,642 | 65 ₹23,21,458.75 Lowest | 140 ₹50,00,065 |
| 5.00 | Dry earth filling including manual compaction dressing all lead & lift in trench of outlets. including all lead, lift, labour and T&P etc. As per directions of Engineer -in -charge. | 550 | Cum | 80 ₹44,000 | 65 ₹35,750 Lowest | 70 ₹38,500 |
| 6.00 | Providing & Laying P.C.C 1:3:6 in foundation of wall with cement, coarse sand and 10-20 mm size stone ballast including cost of all material, labour and T&P etc. required for proper completion of work. | 641.75 | Cum | 9,000 ₹57,75,750 | 8,000 ₹51,34,000 Lowest | 8,900 ₹57,11,575 |
| 7.00 | Providing & Laying M-150 1st Class Brick work in 1:4 cement mortar including all cost of material ,labour T&P etc,required for completion of work. As per directions of Engineer -in -charge. | 2,787.05 | Cum | 6,500 ₹1,81,15,825 | 5,800 ₹1,61,64,890 Lowest | 6,500 ₹1,81,15,825 |
| 8.00 | Providing & Laying local sand as filler material in side slope including all cost of material, labour and T&P etc. required for proper completion of work. As per directions of Engineer -in -charge. | 819.15 | Cum | 550 ₹4,50,532.5 | 200 ₹1,63,830 Lowest | 400 ₹3,27,660 |
| 9.00 | Providing & Laying 200 GSM Non-woven Geotextile sheet below pitching including all cost of material, labour, T & P etc. As per directions of Engineer -in -charge. | 8,907.31 | Sqm | 66 ₹5,87,882.46 | 65 ₹5,78,975.15 Lowest | 66 ₹5,87,882.46 |
| 10.00 | Providing and pitching Mirzapur stone boulder 20-40 kg in weight including all lead & lift cost of all material labour T & P etc. required for proper completion of work . As per directions of Engineer -in -charge. | 2,318.9 | Cum | 4,300 ₹99,71,270 | 4,000 ₹92,75,600 Lowest | 4,200 ₹97,39,380 |
Tender Value
Refer Docs
EMD Value
₹19.5 L
Closing Date
13 Mar 2026, 10:00 amClosed
Superintending Engineer
Office of Superintending Engineer, VII Circle Irrigation Works, Sarojni Naidu Marg, Lucknow.
AS PER TENDER NOTICE-06 LOT-08
2026_UPIDC_1122306_8
06/SE-VII/2025-26
Open Tender
Civil Works - Canal
Item Rate
270 days
Barabanki
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹19.5 L
Lucknow
15 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick jungle and thorney bushes without uprooting including cost of all labour and T&P etc. required for proper completion of work. As per directions of Engineer -in -charge. | 1,18,317.75 | Sqm | - | - |
| 2 | Earth work in excavation of foundation including all lead upto & lift, labour and T&P etc with manual compaction and dressing to profile. As per directions of Engineer -in -charge. | 6,273.91 | Cum | - | - |
| 3 | E/W in cutting / filling and making proper side slope for laying boulder and fillter material with proper disposal and manual compaction.. As per directions of Engineer -in -charge. | 12,689.95 | Cum | - | - |
| 4 | Construction of sub grade by earthen shoulders with all lead & lift including Mechanical compaction and all cost of labour, T&P etc. Required for Proper completion of work | 35,714.75 | Cum | - | - |
| 5 | Dry earth filling including manual compaction dressing all lead & lift in trench of outlets. including all lead, lift, labour and T&P etc. As per directions of Engineer -in -charge. | 550 | Cum | - | - |
| 6 | Providing & Laying P.C.C 1:3:6 in foundation of wall with cement, coarse sand and 10-20 mm size stone ballast including cost of all material, labour and T&P etc. required for proper completion of work. | 641.75 | Cum | - | - |
| 7 | Providing & Laying M-150 1st Class Brick work in 1:4 cement mortar including all cost of material ,labour T&P etc,required for completion of work. As per directions of Engineer -in -charge. | 2,787.05 | Cum | - | - |
| 8 | Providing & Laying local sand as filler material in side slope including all cost of material, labour and T&P etc. required for proper completion of work. As per directions of Engineer -in -charge. | 819.15 | Cum | - | - |
| 9 | Providing & Laying 200 GSM Non-woven Geotextile sheet below pitching including all cost of material, labour, T & P etc. As per directions of Engineer -in -charge. | 8,907.31 | Sqm | - | - |
| 10 | Providing and pitching Mirzapur stone boulder 20-40 kg in weight including all lead & lift cost of all material labour T & P etc. required for proper completion of work . As per directions of Engineer -in -charge. | 2,318.9 | Cum | - | - |
stage.html
html • 0.05 MB
technical_2089757.pdf
techsummary_2089757.pdf
finance_2089757.pdf
BOQ Comparative Chart
xlsx
finsummary_2089757.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BID06LOT08.pdf
Tender Documents • 1.93 MB
BOQ_2089757.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .