Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
9 Jul 2026, 1:00 pm
Construction of 100 KLD ETP waste water recycling plant on turnkey basis for reuse of discharge water of Mechanized Laundry, DBRG with operation and maintenance for 2 years at Dibrugarh Coaching Depot of Tinsukia Division
M-TSK-2026-21
M-TSK-2026-21
Open
30 Months
Dibrugarh, Assam
₹0
₹4.4 L
16 Jun 2026
16 Jun 2026
25 Jun 2026
A-Cost of Supply, Installation, Erection, Commissioning, Operation and
Basic supply price for 100 KLD treated effluent Recycling Plant as per Scope Of Supply Above/
Charges for full Erection & Commissioning For ETP and Water Treatment Plant Above/ 1923315.8
Civil foundation work without building & shed Appx.
C-Electrical Work(Part A: Provision of Power Supply)
Supply, installation, testing and Commissioning of Distribution Transformer , 100 KVA, 11/0.433KV, 50C/s BIS-LEVEL-I, Aluminium Wound, ONAN, Vector group-Dyn-11with first filling of Transformer oil as per IS 335 and all Standard accessories Above/
Supply erection of GI tubular pole 11 Mtrs long similar to Nezone Cat No SP-55 Above/
Supply, Fitting, fixing of GI channel 100x50x6 mm 2500 mm long with necessary clamps size 50x6 mm for Tubular pole , drilling of holes and all accessories forTransformer DP Structure. Above/
Supply, fitting, fixing of 11 KV GODO 400 Amps switch complete. Above/
Supply, fitting, fixing of 11 KV LA set 9 KV (RMS) , discharge capacity 10 KA Above/
Earthing by 50 mm dia, 3.6 mm thickness 3 Mtrs long GI pipe and 6 SWG GI wire as per Drawing No PCEE/ELG/DRG/2024/1 Dtd 30.09.2024 Above/
Supply, installation, testing and commissioning of LT outdoor type panel board With the following: Incoming (i) MCCB, 125 Amps, 4 Pole 25 KA BC= 1 Nos (ii) Bus bar 250 Amps AL Outgoing: (iii) MCCB, 100 Amps, 4 Pole 25 KA BC= 2 Nos (iv) MCCB, 63 Amps, 4 Pole 25 KA BC= 3 Nos Above/
Supply, laying, testing and commissioning of LT XLPE armoured Aluminium cable 4 core 120 SQ mm including cable laying by excavation of earth , making of cable trench and refilling as required.
C-Electrical Work(Part B: Electrification of ETP Shed)
Supply, laying, testing and commissioning of LT XLPE armoured Aluminium cable 4 core 70 SQ mm including cable laying by excavation of earth, making of cable trench and refilling as required. Above/
Supply, laying, testing and commissioning of LT XLPE armoured Aluminium cable 4 core 25 SQ mm including cable laying by excavation of earth , making of cable trench and refilling as required. Above/
Supply . Fitting. Fixing of Horizontal TPN MCB DB with the following (i) MCCB TPN 100 Amps=1 No (ii)MCB DP 63 Amps= 2 Nos, (iii)MCB DP 32 Amps=4 Nos Above/
Supply , fitting fixing of SPN MCB DB DD 8 Way with MCB DP 16 Amps =4 Nos Above/
Supply and fitting , fixing of LED street Light 45 Watt toughened glass cover IP 65 , IK07 with GI clamp for fixing on wall Above/
Supply, fitting, fixing of exhaust fan 300 mm sweep metallic type Above/
Supply, Fitting, fixing of concealed type light point wiring by 1.5 sq. mm copper cable through PVC pipe Above/
Supply, Fitting, fixing of concealed type fan point/ Exhaust wiring by 1.5 sq. mm copper cable through PVC pipe with 1 mm sq. Green colour cable for earth continuity wire Above/
Supply, Fitting, fixing of concealed type 5A Socket point wiring by 1.5 sq. mm copper cable through PVC pipe Above/
Supply, Fitting, fixing of concealed 15A Socket point wiring by 4 sq. mm copper cable through PVC pipe Above/
Supply, laying of 6.0 Sq mm FRLHS single core copper cable Above/
Supply, laying of 4.0 Sq mm FRLHS single core copper cable Above/
Supply, laying of 2.5 Sq mm FRLHS single core copper cable
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NIT.pdf
ATTACHMENT
SectionIBidForm-FirstSheet.pdf
ATTACHMENT
SectionII-BidFormSecondSheet.pdf Bid Form Second Sheet
ATTACHMENT
Section-III-SCC.pdf
ATTACHMENT
Schedule of Rates and Quantities
ATTACHMENT
I_CT_GCC-
ATTACHMENT
SectionII-BidFormSecondSheet.pdf
ATTACHMENT
SectionIV-ScheduleofRatesandQuantities.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
Download all tender documents and submit your bid