| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-Finance | L1 | Accepted-Finance Low | |
| 2 | L2₹10.9 L+₹54,994.61 (5.29%)Accepted-Finance | L2 | Accepted-Finance High |
| Sl No | Description | Qty | Unit | E.SEKAR | S.GOPALAKRISHNAN |
|---|---|---|---|---|---|
| 1.00 | Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges | 31.2 | Sqm | 17,004 ₹20,064.72 Lowest | 18,720 ₹22,089.6 |
| 2.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 62.4 | Cum | 1,53,504 ₹1,81,134.72 Lowest | 1,56,000 ₹1,84,080 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 93.6 | Cum | 2,36,246.4 ₹2,78,770.75 Lowest | 2,43,360 ₹2,87,164.8 |
| 4.00 | Plain Cement Concrete in 1:1.5:3 Mix using 20mm IS HBG Metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 62.4 | Cum | 4,53,648 ₹5,35,304.64 Lowest | 4,86,720 ₹5,74,329.6 |
| 5.00 | Supply & Fixing of Bitumen pad in CC Pavement Including cost & conveyance of all Materials and all Labour charges, etc complete | 12.6 | Sqm | 2,898 ₹3,419.64 Lowest | 3,276 ₹3,865.68 |
| 6.00 | Supply & Filling of Good Gritty Gravel from Approved Quarry & Laid in Layers including cost of Materials & all labour charge etc.,complete | 17 | Cum | 8,840 ₹10,431.2 Lowest | 9,350 ₹11,033 |
| 7.00 | Supply & Filling of 200mm Dia PVC Pipes 6.00 Kg per sq.cm in Road for Cross Drain including cost of Materials & all labour charge etc.,complete | 12 | Rm | 8,280 ₹9,770.4 Lowest | 9,600 ₹11,328 |
Tender Value
₹10.5 L
Closing Date
27 Nov 2025, 3:00 pmClosed
BDO VP
KNR Union at Padappai
Providing Cement Concrete pavement to Ranga Rao IAS Road at Varadarajapuram Panchayat, Kundrathur Panchayat Union, Kancheepuram District Under Village Panchayat Scheme Funds of the Year 2025-26
2025_RDTN_624504_1
No. 2073 / 2025 / A5 / KNR 3 / Dated 09.10.2025
Open Tender
Civil Works - Roads
Works
120 days
varadarajapuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
27 Nov 2025
19 Nov 2025
27 Nov 2025
19 Nov 2025
27 Nov 2025
19 Nov 2025
Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Plain Cement Concrete in 1:1.5:3 Mix using 20mm IS HBG Metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Supply & Fixing of Bitumen pad in CC Pavement Including cost & conveyance of all Materials and all Labour charges, etc complete
Supply & Filling of Good Gritty Gravel from Approved Quarry & Laid in Layers including cost of Materials & all labour charge etc.,complete
Supply & Filling of 200mm Dia PVC Pipes 6.00 Kg per sq.cm in Road for Cross Drain including cost of Materials & all labour charge etc.,complete
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_746817.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
sce.pdf
Tender Documents • 0.85 MB
BOQ_746817.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .