| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.1 LAccepted-AOC | L-1 | Accepted-AOC Found L-1 | |
| 2 | L-2₹13.5 L+₹1.3 L (10.9%)Rejected-AOC | L-2 | Rejected-AOC Not found L-1 | |
| 3 | L-3₹14.7 L+₹2.6 L (21.2%)Rejected-AOC LUDHIANA | L-3 | Rejected-AOC Not found L-1 | |
| 4 | L-4₹14.8 L+₹2.6 L (21.6%)Rejected-AOC | L-4 | Rejected-AOC Not found L-1 | |
| 5 | L-5₹14.9 L+₹2.8 L (22.8%)Rejected-AOC | L-5 | Rejected-AOC Not found L-1 |
Tender Value
₹14.0 L
EMD Value
₹27,936
Closing Date
13 May 2020, 5:00 pmClosed
Executive Engineer Jal Shakti Divn No.1 Una HP
Executive Engineer Jal Shakti Divn No.1 Una HP
C/O Laboratory Building at Una as per NABL Norms. ( SH C/O District Water Testing Lab Building at Una in Distt. Una ( H.P.)
2020_HPIPH_36783_1
No. IDU-I/TA/E-tender/20- 308-25 dt 28-04-20
Open Tender
Civil Works
Item Rate
90 days
Lab building at Una HP
as per NIT
7 documents required · 7 mandatory
₹400
Yes
Executive Engineer Jal Shakti Divn No.1 Una HP
₹27,936
Yes
19 Jun 2020
29 Apr 2020
14 May 2020
29 Apr 2020
13 May 2020
29 Apr 2020
29 Apr 2020 - 13 May 2020
Amount
Excavation in foundation, trenches in earth work in all kinds of soil,such as pick work,jumper work.blasting work in hard rock and soft rock and in saturated soil etc. i/c all leads and lifts , stacking the excavated soil not more than 3 mtrs. clear form the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinth, sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as per the direction of the Engineer-in-Charge.
Providing and laying cement concrete 1: 4: 8 (1: cement : 4 sand :8 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts and as per the direction of the .Engineer-in-Charge.
Providing and laying cement concrete 1: 6: 12 ( 1: cement :6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts and as per the direction of the .Engineer-in-Charge.
Ist class brick work using common burnt clay building bricks in foundation and plinth in cement mortor 1:6 ( 1 cement: 6 sand ) in all leads and lifts as per the direction of the Engineer-in-Charge.
Ist class brick work using common burnt clay building bricks in superstructure in cement mortor 1:6 (1 cement :6 sand) in all lead and lifts as per the direction of the Engineer-in-Charge.
Providing and laying cement concrete of M-20 grade (With Cement, sand & graded stone aggregate of 20 mm nominal size ) with minimum & Maximum cement contents of 300 Kg /M3 and 400 Kg/ M3 respectively and maximum water cement ratio 0.50 as per IS: 456-2000 and curing complete excluding the cost of form work and reinforcement within all leads and lifts as per the direction of the Engineer-in-Charge. work in suspended floors, roofs, landing and shelves & their supports, balconies, beams, girders,
Foundation , footing etc.
Coulmn piller etc.
Suspended floor, roofing etc.
Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centering, shuttering, struting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for in situ-reinforced concrete and plain Concrete work in :-
Foundation & Footing etc.
Beams,cantilever,girders and lintels.Sides and soffits of beams,beam haunchings, cantilevrs, bressumers and lintles not exceeding 1.00 mtr.in depth in all heights from floor.
Columns pillers, posts and struts upto floor to level
Flat surfaces such as soffits of suspended floors, roofs, landing and the like Floors etc. upto 200 mm thickness in all leads and lifts and as per the direction of the Engineer-in-Charge.
Ist class half brick work using common burnt clay building bricks in foundation & plinth in cement mortor 1:4 ( 1: cement :4 sand ) in all leads and lifts as per the direction of the Engineer-in-Charge.
Providing mild/tor steel reinforcement of RCC work i/c bending ,binding and placing in position in complete up to floor two level in all leads and lifts and as per the direction of the Engineer-in-Charge.
Ram Pal Sharma
balwinder singh govt contractor
Varun Mehan Govt Contractor
MAHESH ANGRA
Deepak Kumar
Ashutosh Kalia Contractor
Nitish Thakur
Sushant Puri
MOHIT BEDI
Ankush Dhiman
abhishek khajanchi
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .