| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.5 CrAccepted-Finance VPO KHANPUR TEHSIL DISTT UNA HP 174301 | UNA | UNA | HP | 174301 | ₹4.5 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹4.5 CrRejected-Finance | ₹4.5 Cr | L-2 | Rejected-Finance Not L-1 |
Tender Value
₹4.3 Cr
EMD Value
₹8.6 L
Closing Date
2 Apr 2026, 10:00 amClosed
Executive Engineer HPPWD Division Una
Executive Engineer HPPWD Division Una
Construction of 4 No.Type-III and 10 Nos. Type-II qtr. at Women Police station Una Tehsil and Distt. Una (HP) (SH Building portion water supply and sanitary installation Rain water Harvesting tank septic Tank and Boundary wall etc) (Deposit work)
2026_PWD_132665_1
Job01 C/O 4 Nos. Type-III and 10 Nos. Type-II qtr. at Women Police Station Una
Open Tender
Civil Works - Buildings
548 days
Una
As per bid document
16 documents required · 16 mandatory
₹7,000
₹8.6 L
8 Apr 2026
28 Mar 2026
2 Apr 2026
28 Mar 2026
2 Apr 2026
28 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation in foundation trenches etc.mechanical means in all classification of soil such as pick work,jumper work,pick jumper work,blasting work and hard blasting work in dry or saturated condition upto any depth and lift including pumping and bailing out water where required including stacking the serviceable and unserviceable material separately as directed and then returning the stacked soil in 15cm(fifteen centimeter) layers when required into plinth and sides of foundation etcetra consolidating each deposited layer by ramming and watering and then disposing of all surplus unserviceable excavated earth as directed by the engineer in charge including carriage of material in all leads and lifts disposed material to be neatly dressed leveled as per instructions of the Engineer in charge.The rates are inclusive octroi, royality,malkana ,toll tax,sale tax ,GST,labour cess or other taxes imposed by the Government. | |||||
| 2Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto any leads and lifts also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.The rates are inclusive octroi, royality,malkana ,toll tax,sale tax ,GST,labour cess or other taxes imposed by the Government. | |||||
| 3Supplying and filling in plinth with sand under floor including watering ramming consolidating and dressing complete for all heights including entire carriage of material and disposal all surplus excavated/bored out earth within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax ,GST,labour cess or other taxes imposed by the Government. | |||||
| 4Supplying of stone soling/boulder filling dry hand packed in under floor including carriage of materials within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax ,GST,labour cess or other taxes imposed by the Government. | |||||
| 5.1 | Providing form work with steel plates 3.15mm (three point fifteen millimeter) thick welded with angle iron in frame of 30x30x5 mm ( thirty into thirty into five millimeter) size so as to give a fair finish including centering shuttering strutting and propping etcetera with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling and removal of the same for insitu reinforcement and plain concrete work in foundation footing and bases of columns etcetera and mass concrete including carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | - | Per square metre | - | - |
| 5.2 | Providing form work with steel plates 3.15 mm( three decimal fifteen millimetre ) thick welded with angle iron in frame of 30x30x5mm(thirty into thirty into five millimetre) size so as to give a fair finish including centering shuttering strutting and propping etc with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in columns, pillars, posts and struts square rectangular or polygonal in plan in any height including carriage of materials within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge . The rate including octroi,royality, Malkana, toll tax, sale tax ,or other taxes imposed by the Government. | - | Per square metre | - | - |
| 5.3 | Providing form work with steel plates 3.15mm(three decimal fifteen millimeter) thick welded with angle iron in frame of 30x30x5 mm (thirty into thirty into five millimeter) size so as to give a fair finish including centering shuttering strutting and propping etcetera with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling not exceeding 4 meter and removal of same for in-situ reinforced concrete and plain concrete work in flat surfaces such as soffits of suspended floors roofs landings and the like floors in all thickness in all floor level including carriage of material entire within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax ,GST,labour cess or other taxes imposed by the Government. | - | Per square metre | - | - |
| 5.4 | Providing form work with steel plates 3.15mm(three decimal fifteen millimetre ) thick welded with angle iron in frame of 30x30x5mm(thirty into thirty into five millimetre) size so as to give a fair finish including centering ,shuttering ,strutting and propping etc. with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in:- beams cantilevers girders and lintels side and soffit of beams ,beam haunchings, cantilevers, bressumers and lintels in any depth and heights /thickness including carriage of materials within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge . The rate including octroi,royality, Malkana, toll tax, sale tax ,or other taxes imposed by the Government. | - | Per square metre | - | - |
| 5.5 | Providing form work with steel plates 3.15mm(three decimal fifteen millimetre) thick welded with angle iron in frame of 30x30x5mm(thirty into thirty into five millimetre) size so as to give fair finish including centering ,shuttering ,strutting and propping etc with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work:- in edges of slabs and break in floors and walls etc. upto any width and height complete including carriage of materials within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge. The rate including octroi,royality, Malkana, toll tax, sale tax ,or other taxes imposed by the Government. | - | Per Running metre | - | - |
| 5.6 | Providing form work with steel plates 3.15mm(three decimal fifteen millimetre) thick welded with angle iron in frame of 30x30x5mm(thirty into thirty into five millimetre)size so as to give a fair finish including centering ,shuttering, strutting and propping etc with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in stair cases with sloping or stepped soffits excluding landing complete including carriage of materials within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge . The rate including octroi,royality, Malkana, toll tax, sale tax ,or other taxes imposed by the Government. | - | Per square metre | - | - |
stage.html
html • 0.04 MB
technical_196183.pdf
techsummary_196183.pdf
BOQ Comparative Chart
xlsx
finsummary_196183.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
SBD.pdf
Tender Documents • 2.90 MB
BOQ_196183.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid