Tender Value
₹2.6 Cr
EMD Value
₹2.8 L
Closing Date
3 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
GSU/II
16 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Failure in submission of this statement will lead to summary rejection of offer.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing.
However, if required in tender documents by way of Special Conditions, a formal agreement duly notarized, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard GeneralC conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. 2. In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of 1.1.1 credentials. 3. If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials 4. In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work.
The Similar Work is defined as "Any P-Way Work". Failure in submission of completion certificate/s and other documents as per aforementioned clauses will lead to summary rejection of offer.
47 conditions · 13 needing a document upload
If the earnest Money deposited by the bidder is in shape of Bank Guarantee, it should be prepared in favour of "FA&CAO/C/NCR" on non-Judicial Stamp paper having stamp duty of 0.5% of the BG value subject to a maximum of Rs. 10,000/-, failing which the bid will be summarily rejected.
The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. For consideration of balance sheet of the fourth previous year, a certificate stating that the balance sheet of the previous year is yet to be prepared/ audited certified by the Chartered Accountant shall be submitted. Without this certificate, balance sheet of the fourth previous year shall not be considered.
All documents signed by CA should mandatorily have Unique Document Identification Number (UDIN) on the document. The document uploaded should be verifiable from UDIN portal by entering UDIN mentioned on document. Failing this, document shall not be considered for evaluation.
Tenderer must submit list of Plants & Machinery available on hand (own) and proposed to be inducted and hired for the tendered work
Tenderer must submit list of Personnel/ Organization available on hand and proposed to be engaged for the tendered work in proforma.
Tenderer must submit an undertaking that neither I / We (name of the sole Proprietor Firm / Partnership Firm /Limited Company / LLP / Registered Society / Trust / JV firm) nor any of the partner or partnership firm / LLP /Member of Registered Society / Trust / Constituent of JV firm including partner of partnership firm in JV has / have been black listed or debarred by Railway or any other Ministry / Department / Public Sector Undertaking of the Government of India / any State Govt. from participation in tenders / contracts as on the date of opening of bids, either in our individual capacity or in any firm in which we were / are partners. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. Offer will be summarily rejected in case of non-submission of such document.
An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract
I/ We have visited the works site and I/ We am /are aware of the site conditions.
Please submit bank details of the firm / individual/ JV / partnership etc. i.e.Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, PAN Number and other necessary & relevant documents.
Please furnish documents in support of your claim to fulfill the eligibility criteria as mentioned in the tender documents. Each page of the copy of documents / certificates in support of credentials, submitted by the you, shall be self-attested / digitally signed by the you or authorized representative of the your firm. Only those documents which are declared explicitly by you as "documents supporting the claim of qualifying the laid down eligibility criteria", will be considered for evaluating the offer or otherwise available in the offer.
Please furnish statement of deviations from tender conditions, if any.
Requisite documents proving technical eligibility criteria and financial eligibility criteria has been uploaded along with those required as per explanation given in clause 10 of IRGCC-2022 (Works Matter).
Tenderers who is/are not borne on the approved list of the contractors of North Central Railway shall submit along with his/their tender as per clause 11 of IRGCC-2022 (Works Matter), as applicable.
All requisite valid documents regarding constitution of business of the bidding firm should be submitted along with the tender as per clause 14 of IRGCC-2022 (Works Matter),otherwise their offer will be considered incomplete and shall not be considered.
Joint Venture firms, if applicable in the instant tender, should submit all valid requisite documents and fulfil the stipulations as per clause 17 of IRGCC-2022 (Works Matter),otherwise their offer will be considered incomplete and shall not be considered.
Partnership firms, if bidding for the instant tender, should submit all valid requisite documents and fulfil the stipulations as per clause 18 of IRGCC-2022 (Works Matter),otherwise their offer will be considered incomplete and shall not be considered.
Please furnish list of Works on hand indicating Description of Work, Contract Value, Approximate value of balance work yet to be done and Date of award.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Rates are inclusive of all taxes/octroi, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority. If any Tax/Royalty/Octori is quoted extra, the same will neither be considered for evaluation of the tender nor will be paid. However any changes in rate of taxes or any new tax /cess on Works Contract will be dealt according to clause 37 of IRGCC-2022 (Works Matter).
Tenderers are advised to visit the site of work to ascertain all aspects of the site conditions viz accessibility, availability of approach road, nature of the soil, availability of material, availability of labour etc. that may be encountered in course of execution of work.
Tenderer should see the website for the corrigendum/addendum to the NIT/tender document, if any that may be uploaded prior to tender opening (inclusive) as there will not be any separate communication for that.
The tenderer for carrying any construction work in Uttar Pradesh must get themselves registered from the registering Officer under Section - 7 of the Building and Other Construction Workers Act, 1996 and rules made there-to by the Uttar Pradesh Govt. and submit certificate of Registration (Labour Department). For enactment of this Act, the tenderer shall be required to pay cess @ 1% of cost of construction work to be deducted from each bill.
The contractor(s) shall observe all the formalities, perform all the acts and abide by all the provisions contained in the Contract Labour Act-1970 and Contract Labour Central Rules, 1971 which in addition to other stipulations provides that the contractor(s) shall obtain license(s) from appropriate licensing officer of the area before commencement of the work and shall produce a copy thereof along with the original to the Railway office, which will be returned to the contractor after verification.
If any complaint is received against the contractor regarding violation of contract laws, (exposing Principal Employer to the risk of legal proceedings under labour laws), the guilty contractor will be black listed and their contract shall be terminated following the due procedure, apart from initiating criminal proceedings against him with the help of Labour department officials. (Authority: RB letter no.2008/E (LI)/AT/CNR/3, dated 24.01.2018).
It is the responsibility of the tenderer to see corrigendum, if any, to tender notice up to the date of tender opening. IRGCC-2022 (works matter) is for reference only. Any correction issued by competent authority up to date of opening will be applicable. Tenderer should quote accordingly.
Though no minimum eligibility criteria is specified for tenders below Rs. 50.00 Lakhs, tenderers are advised to upload documents so that their financial capacity, capability & past performance to undertake the tendered work can be adjudged during evaluation of their offer. Documents testifying tenderer previous experience for the type of job for which tender is invited with list of works carried out in the past and financial status should be produced along with the tender.
The provision of Construction and Demolition Waste Management Rule 2016 issued by Ministry of Environment Forest and Climate Change dated 29.03.2016 and published in the Gazette of India, Part - II, Section -3, Sub-section (ii) are binding upon the Contractor. Contractor shall implement these provisions at worksites, for which no extra payment will be payable.
The tenderers shall submit a copy of certificate stating that all their statements/documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as Annexure-A. Non submission of above certificate by the bidder shall result in summarily rejection of his/their bid.
It is to be noted that tenderer digital signature on the E-Tender form will be considered as confirmation that tenderer have read and accepted all the conditions laid down in the documents as well as related specification of items,schedule & quantity of items in the tender, consisting of techno-commercial offer form (including special conditions attached to E-Tender) and Financial offer form, unless specific deviation is quoted in the techno- commercial offer form.
The quantities shown in the attached Schedule are given as a guide and are approximate only and are as a guide to give the tenderer(s) an idea of quantum of work involved. Quantities are subject to variation according to the needs of the Railway. The Railway does not guarantee work under each item of the Schedule. The Railway reserves the right to increase/ decrease and/or delete or include any of the quantities given above and no extra rate will be allowed on this account.
In case of any information submitted by tenderer is found to be false forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Earnest Money Deposit besides banning of business for a period of upto five years. In case of any information submitted by tenderer is found to be false forged or incorrect after the award of contract, the contract shall be terminated. Earnest Money Deposit (EMD), Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of upto five years.
Tenderers are advised to visit the site of work to ascertain all aspects of the site conditions viz accessibility, availability of approach road, nature of the soil, availability of material, availability of labour etc. that may be encountered in course of execution of work.
The tenderer has to submit necessary documents in compliance of clause 10 to 18 (Part-I) of IRGCC 2022 (Works matter) mandatorily, otherwise offer will be considered as Incomplete Offer and accordingly shall not be considered.
Track Works in relation to provision of Goods Shed at Ekdil and Phaphund Stations.
DYCE-II-GSU-PRYJ-04-2026~NCR
DYCE-II-GSU-PRYJ-04-2026
Open
Works - General
6 Months
Prayagraj, Uttar Pradesh
₹0
₹2.8 L
3 Mar 2026
7 Feb 2026
17 Feb 2026
64 items across 1 schedule · ₹2,60,76,084.56 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | In all conditions and classifications of soil except rock | cum | 200.00 | 106.28 | 21,256 |
| 2 | Derailing Switch (Under conditions not requiring Traffic Block). | Set | 2.00 | 5,201.9 | 10,403.8 |
| 3 | 1 in 12 Turnouts | Set | 9.00 | 19,164.42 | 1,72,479.78 |
| 4 | Derailing Switch | Set | 1.00 | 7,834.91 | 7,834.91 |
| 5 | 1 in 12 Turnouts | Set | 1.00 | 46,855.85 | 46,855.85 |
| 6 | Derailing Switch | Set | 2.00 | 9,076.35 | 18,152.7 |
| 7 | 1 in 12 Turnouts | Set | 9.00 | 51,541.43 | 4,63,872.87 |
| 8 | For 1 in 12 Points & Crossing | Set | 10.00 | 9,227.76 | 92,277.6 |
| 9 | For Derailing Switch | Set | 2.00 | 5,398.58 | 10,797.16 |
| 10 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 3200.00 | 24.39 | 78,048 |
| 11 | When distance of nearest quarry is more than 150 km and up to 200 km | cum | 7000.00 | 1,989.9 | 1,39,29,300 |
| 12 | For 60 Kg/60EI - R260 grade Rail | Each | 90.00 | 4,391.94 | 3,95,274.6 |
| 13 | For 60 Kg/60EI - R260 grade Rail | Each | 90.00 | 3,357.61 | 3,02,184.9 |
| 14 | Dismantling of existing LWR/SWR track of any structure, removing rails, sleepers, fish plates, cutting of rails, segregation and stacking of released Rails, Sleepers and fitting at nominated location in countable manner within a free lead of 500m, levelling of ballast to correct profile for laying new track over it, all as per direction of Engineer-in-Charge. | TRM | 450.00 | 165.16 | 74,322 |
| 15 | With contractor's hard wood pegs of 50 mm dia and 60 cm long | Each | 170.00 | 122.77 | 20,870.9 |
| 16 | Installation of reference points for track centre line in main and loop lines, in straight or curve portion, SRJ for turnouts, heel of crossing (HOC), locations of derailing switches, switch expansion joints etc. away from formation on firm ground at known offset with MS Angles of 50mmx50mmx5mm thick of length 1.80 m each, founded in concrete block of size 30cm x 30cm x 45cm of nominal mix 1:3:6, including painting to reference pegs with two coats of enamel paints on exposed surface, as directed by Engineer In charge. Note: Earth work and Cement concrete will be paid under relevant items. | Each | 90.00 | 497.76 | 44,798.4 |
| 17 | Spreading of ballast, from existing stacks available along formation on top or at cess, in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in-charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. | cum | 5000.00 | 45.58 | 2,27,900 |
| 18 | For sleeper density of 1660 sleepers per km | TRM | 2700.00 | 258.59 | 6,98,193 |
| 19 | Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. | Each | 100.00 | 1,685.87 | 1,68,587 |
| 20 | For 60 Kg Rails | RM | 6000.00 | 53.3 | 3,19,800 |
| 21 | New Line Section, not opened for traffic | TRM | 2700.00 | 9.67 | 26,109 |
| 22 | 1 in 12 Turnouts (Under Traffic Block Conditions) | Set | 9.00 | 10,088.72 | 90,798.48 |
| 23 | 1 in 12 Turnouts | Set | 1.00 | 6,053.23 | 6,053.23 |
| 24 | Derailing Switch | Set | 2.00 | 1,915.53 | 3,831.06 |
| 25 | 60 Kg - 110/90 UTS - Outside Track | Each | 720.00 | 258.52 | 1,86,134.4 |
| 26 | 60 Kg - 110/90 UTS - On Running Line | Each | 180.00 | 329.59 | 59,326.2 |
| 27 | Outside Track | Each | 3960.00 | 47.01 | 1,86,159.6 |
| 28 | On Running Line | Each | 720.00 | 62.36 | 44,899.2 |
| 29 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 480.00 | 116.79 | 56,059.2 |
| 30 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 120.00 | 115.27 | 13,832.4 |
| 31 | For lead up to 500 metre. | MT | 100.00 | 356.93 | 35,693 |
| 32 | For lead beyond 500 metre and up to 1 Km. | MT | 100.00 | 459.92 | 45,992 |
| 33 | Extra to Item no. 171031 and 171032 with contractor's Rail Dolly / Dip Lorry | MT | 100.00 | 12.81 | 1,281 |
| 34 | From Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer. | MT | 480.00 | 86.39 | 41,467.2 |
| 35 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer | MT | 1500.00 | 90.7 | 1,36,050 |
| 36 | I n Wagon/Truck / trailer where mechanical handling is possible a n d traffic block is not required. | MT | 470.00 | 114.83 | 53,970.1 |
| 37 | For lead up to 500 metres | MT | 470.00 | 277.85 | 1,30,589.5 |
| 38 | For lead beyond 500 metre and up to 1 Km | MT | 470.00 | 411.36 | 1,93,339.2 |
| 39 | Extra to Item no. 172031 and 172032 with contractor's Rail Dolly/Dip Lorry. | MT | 470.00 | 14.44 | 6,786.8 |
| 40 | Lead up to 5 Km | MT | 40.00 | 159.36 | 6,374.4 |
| 41 | Lead beyond 5 Km and up to 10 km | MT | 40.00 | 200.54 | 8,021.6 |
| 42 | Lead beyond 10 Km and up to 20 km | MT | 40.00 | 256.56 | 10,262.4 |
| 43 | Lead beyond 20 Km and up to 30 km | MT | 40.00 | 324.75 | 12,990 |
| 44 | Lead beyond 30 Km and up to 50 km | MT | 40.00 | 419.4 | 16,776 |
| 45 | Lead beyond 50 Km and up to 100 Km | MT | 40.00 | 625.38 | 25,015.2 |
| 46 | Lead beyond 100 Km and up to 150 Km | MT | 40.00 | 934.02 | 37,360.8 |
| 47 | Extra for every Km per MT beyond 150 Km over item no. 172047 | MT-Km | 6000.00 | 3.15 | 18,900 |
| 48 | Lead up to 5 Km | MT | 2570.00 | 52.99 | 1,36,184.3 |
| 49 | Lead beyond 5 Km and up to 10 km | MT | 2570.00 | 94.18 | 2,42,042.6 |
| 50 | Lead beyond 10 Km and up to 20 km | MT | 2570.00 | 150.2 | 3,86,014 |
| 51 | Lead beyond 20 Km and up to 30 km | MT | 2570.00 | 218.39 | 5,61,262.3 |
| 52 | Lead beyond 30 Km and up to 50 km | MT | 2570.00 | 313.03 | 8,04,487.1 |
| 53 | Lead beyond 50 Km and up to 100 Km | MT | 2570.00 | 519.02 | 13,33,881.4 |
| 54 | Lead beyond 100 Km and up to 150 Km | MT | 2570.00 | 827.65 | 21,27,060.5 |
| 55 | Extra for every Km per MT beyond 150 Km over item no. 172057 | MT-Km | 257000.00 | 3.15 | 8,09,550 |
| 56 | From Truck / Trailer | MT | 1500.00 | 84.43 | 1,26,645 |
| 57 | From Truck / Trailer | MT | 470.00 | 88.06 | 41,388.2 |
| 58 | For a lead up to 500m | Each | 5000.00 | 64.38 | 3,21,900 |
| 59 | Extra to Item no. 172081 for additional lead of every 500m or part thereof beyond 500 m | Each | 5000.00 | 43.1 | 2,15,500 |
| 60 | From Truck / Trailer | MT | 120.00 | 117.93 | 14,151.6 |
| 61 | Supply and fixing in position pre-cast cement concrete Fouling Mark as per approved drawing at station yard, duly painting the top surface and slopes with white enamel paint in two coats and inscribed letters with black of Fouling Mark, complete in all respects with all labour, materials including cement, tools and plants etc. | Each | 12.00 | 476.92 | 5,723.04 |
| 62 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 200.00 | 794.59 | 1,58,918 |
| 63 | Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material | Hour | 200.00 | 942.83 | 1,88,566 |
| 64 | Manufacturing and fixing buffer stop with Railway supplied rails, cutting, including bending of rails as per plan ,with all contractor's labour, materials, tools, plants etc. and all lead and lift including crossing of track where necessary and as directed by Engineer in charge at site. Note: Excavation, fixing rails in cement concrete, drilling of holes will be paid separately. | Each | 3.00 | 15,176.36 | 45,529.08 |
| Schedule total | ₹2,60,76,084.56 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .