Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance | L1 | Accepted-Finance Quoted Lowest Rate | |
| 2 | L2₹4.7 L+₹475 (0.10%)Rejected-Finance 22 DHARMA TALA LANE SHIBPUR PIN 711102 | SHIBPUR | HOWRAH | WEST BENGAL | 711102 | L2 | Rejected-Finance Quoted Higher Rate | |
| 3 | L3₹4.9 L+₹17,610 (3.72%)Rejected-Finance | L3 | Rejected-Finance Quoted Highest Rate |
Tender Value
₹4.7 L
EMD Value
₹9,493
Closing Date
20 Aug 2026, 2:00 pmClosed
Assistant Engineer, HCSD-I, Howrah
2, M.G.Road (2nd floor), Howrah-711101
Repair and renovation of Ladies and Gents toilet at 1st floor of Howrah Construction Division.
2026_WBPWD_5017886_1
WBPWD/AE/HCSD-I/e-NIT-4/26-27
Open Tender
CIVIL WORKS
Percentage
30 days
Howrah
Please refer Tender documents.
6 documents required · 6 mandatory
₹9,493
6 Oct 2026
4 Aug 2026
24 Aug 2026
6 Aug 2026
20 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. | |||||
| 1.01 | With cement mortar 1:4 (1cement: 4 coarse sand) | 1 | Sq.M | 560.5 | ₹559.94 |
| 2Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | |||||
| 2.01 | In cement mortar | - | Cu.M. | 2,060.2 | - |
| 3Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thick | |||||
| 3.01 | Nominal concrete 1:4:8 or leaner mix (including equivalent
design mix) | - | Cu.M. | 1,503.6 | - |
| 4Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. | |||||
| 4.01 | Cement mortar 1:4 (1 cement :4 coarse sand)Cement mortar 1:4 (1 cement :4 coarse sand) | - | Sq.m | 1,123.8 | - |
| 5Brick work with common burnt clay machine moulded F.P.S. (non modular) bricks of class designation 12.5 in exposed brick work including making horizontal and vertical grooves 10 mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6 coarse sand). | |||||
| 5.01 | Above plinth level upto floor V level | - | Cu.M. | 9,481.7 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 0.52 MB
BOQ_5088369.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .