Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹24.8 L+₹99,816.22 (4.20%)Admitted-Finance CHANDAN NAGAR P O RAUJA GHAZIPUR | GHAZIPUR | UTTAR PRADESH | 232325 | L2 | Admitted-Finance | |
| 3 | L3₹25.4 L+₹1.6 L (6.86%)Admitted-Finance CHANDAULI | UTTAR PRADESH | 221009 | L3 | Admitted-Finance | |
| 4 | L4₹26.5 L+₹2.7 L (11.2%)Admitted-Finance SHABIPUR GHAZIPUR | GHAZIPUR | UTTAR PRADESH | 232325 | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R.K. YOGIRAJ ENTERPRISES L4 | M/S IMRAN GOVERNMENT CONTRACTOR L1 | M/S GOPAL RAI L2 | SUNIL SINGH YADAV L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work in lime or cement mortar including stacking of materials as directed by engineer in charge with in a distance of 60 Mtr | 126.12 | M3 | 100 ₹12,612 Lowest | 100 ₹12,612 Lowest | 229.32 ₹28,921.84 | 295 ₹37,205.4 |
| 2.00 | Dismantling existing plaster including disposal of refuse as directed by Engineer in charge with in a distance of 60Mtr | 2,055.25 | M2 | 8 ₹16,442 Lowest | 8 ₹16,442 Lowest | 12.87 ₹26,451.07 | 15 ₹30,828.75 |
| 3.00 | Racking out joints of brick work in cement of lime mortar to a depth of 1 cm including disposal of refuse as directed by the engineer in charge with in a distance of 60 Mtr | 2,055.25 | M2 | 6 ₹12,331.5 Lowest | 6 ₹12,331.5 Lowest | 9.75 ₹20,038.69 | 12 ₹24,663 |
| 4.00 | Dismantling cement concrete or brick or granolithic floor including base concrete and including stacking of dismantled materials as directed by engineer in charge with in a distance of 60 Mtr | 54.5 | M3 | 12 ₹654 Lowest | 12 ₹654 Lowest | 18.33 ₹998.99 | 24 ₹1,308 |
| 5.00 | 1st. Class B/W 1:4 CM in 23Cm thick wall in extension of wall (With 100% New bricks) in per M3 | 22.36 | M3 | 5,500 ₹1,22,980 | 5,600 ₹1,25,216 | 4,769.7 ₹1,06,650.49 Lowest | 7,500 ₹1,67,700 |
| 6.00 | Centring and shuttering for RCC work in slab of building works. | 840.79 | M2 | 350 ₹2,94,276.5 | 320 ₹2,69,052.8 Lowest | 351 ₹2,95,117.29 | 431 ₹3,62,380.49 |
| 7.00 | RCC Work in 1:2:4 CM with Stone grit in roof. | 100.89 | M3 | 7,500 ₹7,56,675 | 7,400 ₹7,46,586 | 6,571 ₹6,62,948.19 | 6,200 ₹6,25,518 Lowest |
| 8.00 | M.S. bar required in RCC work in roof | 63.36 | Qtl | 5,300 ₹3,35,808 | 5,100 ₹3,23,136 | 4,953 ₹3,13,822.08 | 76 ₹4,815.36 Lowest |
| 9.00 | Cement plaster in 1:4 CM in building | 2,300.26 | M2 | 150 ₹3,45,039 | 100 ₹2,30,026 Lowest | 148.2 ₹3,40,898.53 | 165 ₹3,79,542.9 |
| 10.00 | C.C. Work in 1:2:4 CM with Stone grit in flooring | 48.12 | M3 | 7,000 ₹3,36,840 | 6,050 ₹2,91,126 Lowest | 6,271.2 ₹3,01,770.14 | 6,800 ₹3,27,216 |
Tender Value
₹31.8 L
EMD Value
₹64,000
Closing Date
14 Sept 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
executive enggineer tubewell division 2nd ghazipur
xecutive enggineer tubewell division 2nd ghazipur Pattharghat ghazipur 233001
Repaireing of Jiledaari office and Saidpur tubewell colony (AE quarter JE quarter 4th class quarter and quarter boundary wall
2026_UPIDM_1179968_1
1383 dated 18-08-2026
Open Tender
Civil Works
Item Rate
Sub division 2nd Saidpur tubewell division 2nd Gha
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
E.E. tubewell division II Ghazipur
₹64,000
17 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
14 Sept 2026
1 Sept 2026
150 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work in lime or cement mortar including stacking of materials as directed by engineer in charge with in a distance of 60 Mtr | 126.12 | M3 | - | - |
| 2 | Dismantling existing plaster including disposal of refuse as directed by Engineer in charge with in a distance of 60Mtr | 2,055.25 | M2 | - | - |
| 3 | Racking out joints of brick work in cement of lime mortar to a depth of 1 cm including disposal of refuse as directed by the engineer in charge with in a distance of 60 Mtr | 2,055.25 | M2 | - | - |
| 4 | Dismantling cement concrete or brick or granolithic floor including base concrete and including stacking of dismantled materials as directed by engineer in charge with in a distance of 60 Mtr | 54.5 | M3 | - | - |
| 5 | 1st. Class B/W 1:4 CM in 23Cm thick wall in extension of wall (With 100% New bricks) in per M3 | 22.36 | M3 | - | - |
| 6 | Centring and shuttering for RCC work in slab of building works. | 840.79 | M2 | - | - |
| 7 | RCC Work in 1:2:4 CM with Stone grit in roof. | 100.89 | M3 | - | - |
| 8 | M.S. bar required in RCC work in roof | 63.36 | Qtl | - | - |
| 9 | Cement plaster in 1:4 CM in building | 2,300.26 | M2 | - | - |
| 10 | C.C. Work in 1:2:4 CM with Stone grit in flooring | 48.12 | M3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
2randregu.pdf
Tender Documents • 1.28 MB
BOQ_2218846.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .