Loading…
Loading…
Tender Value
₹20.6 L
EMD Value
₹41,100
Closing Date
31 Jul 2026, 4:00 pm5d left
ADGP Hqrs PHQ
Srinagar
Renovation
2026_DGPJK_316997_3
e-NIT/EE-PCD/PHQ/50/2026-27
Open Tender
Civil Works
Percentage
60 days
CID CI Udhampur
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Exen PCD PHQ
₹41,100
21 Jul 2026
21 Jul 2026
1 Aug 2026
21 Jul 2026
31 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge 1:3:6 or richer mix (i/c equivalent design mix) | 17.72 | Sqm | 1,725.2 | ₹30,570.54 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 17.72 | Cum | 5,202.9 | ₹92,195.39 |
| - | Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead With cement mortar 1:4 (1 cement : 4 fine sand) | 157.8 | Sqm | 441.4 | ₹69,652.92 |
| - | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc.complete. | 1,654.68 | Sqm | 14.5 | ₹23,992.86 |
| - | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete 1 mm thick | 1,654.68 | Sqm | 138.1 | ₹2,28,511.31 |
| - | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer | 520.61 | Sqm | 164.6 | ₹85,692.41 |
| - | Distempering with 1st quality Acrylic/oil bound washable distemper (ready-made) having VOC content less than 50 grams/litre of approved manufacturer and of required shade and colour complete as per manufacturers’ specifications, one or more coats on old work | 347.07 | Sqm | 50.75 | ₹17,613.8 |
| - | Finishing walls with Acrylic smooth exterior paint of required shade Old work (two or more coats applied @ 1.67 liters/10sqm on existing cement paint surface) | 550.89 | Sqm | 119.2 | ₹65,666.09 |
| - | Finishing walls with premium Acrylic smooth exterior paint with silicon additives of required shade Old work (Two or more coats applied @ 1.43 liters/ 10 sqm)
over existing cement paint surface. | 236.08 | Sqm | 114.15 | ₹26,948.53 |
| - | Providing and fixing gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels Granite of any colour or shade (Area of slab over 0.5 sqm) | 20.07 | Sqm | 2,994.6 | ₹60,101.62 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.46 MB
BOQ_1036636.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].