Shifting of existing line by providing and laying 250mm dia SW pipe line and additional construction of machine holes near shri Jawala Mata Mandir and Shri Suraj Kund Mandir Sector 45A falls under the jurisdiction of SDE MCPH Sub Divn No. 18 Chd.
2026_MCC_94259_2
MCC/EE/SWM/2026/76
Open Tender
Civil Works
Percentage
60 days
Chandigarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,390
31 Jul 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Extra cutting through metalled road and their foundation including sorting screening ans stacking the stone metal at site of work to the enire satisfication of EIC.(NSI) | 55.46 | sqm | 180 | ₹9,982.8 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (DSR 2.8.1) | 136.6 | P.Cum | 190 | ₹25,954 |
| 3 | Providing, laying and jointing glazed stoneware pipes class SP-1 with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc. complete : 200 diameter S.W. Pipe for 10" i/d SW pipe line (250 mm) (DSR 19.1.4) | 45.12 | mtr | 910 | ₹41,059.2 |
| 4 | Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) all-round S.W. pipes including bed concrete as per standard design :for 10" i/d SW pipe line (250 mm) (DSR 19.2.4) | 45.12 | mtr | 950 | ₹42,864 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 manufactured sand derived from recycled aggregates (RCA) : 10 graded stone aggregate 40mm nominal size recycled aggregate (RA) (DSR 4.1.10) | 2.2 | P.Cum | 3,500 | ₹7,700 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) (DSR 6.1.1) | 17.21 | cum | 5,400 | ₹92,934 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) (DSR 4.1.4) | 2 | P.Cum | 5,400 | ₹10,800 |
| 8 | 12 mm cement plaster finished with a floating coat of neat cement :1:4 (1 cement : 4 fine sand) (DSR 13.7.2) | 43.3 | sqm | 240 | ₹10,392 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform (DSR 5.9.3) | 15.1 | sqm | 460 | ₹6,946 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. (DSR 5.22.6) | 234 | kg | 85 | ₹19,890 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.86 MB
BOQ_115859.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].