| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-Finance | ₹3.3 L | L1 | Accepted-Finance OK |
| 2 | L2₹3.3 LRejected-Finance | ₹3.3 L | L2 | Rejected-Finance OK |
Tender Value
₹3.2 L
EMD Value
₹6,500
Closing Date
24 Apr 2026, 6:00 pmClosed
Executive Engineer
HPPWD JUBBAL
SH C/O R/wall at RD 0/360 to 0/377)
2026_PWD_134566_5
16-19, Dated 07.04.2026
Open Tender
Civil Works
Jubbal
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
₹6,500
23 Jun 2026
19 Apr 2026
25 Apr 2026
19 Apr 2026
24 Apr 2026
19 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I | - | Per Cum | - | - |
| 2 | Providing and Laying concrete concrete 1:6:12 (1cement: 6 sand: 12 graded stone aggregate 40mm nominal size)for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge | - | Per Cum | - | - |
| 3 | Providing and Laying concrete concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge | - | Per Cum | - | - |
| 4 | Stone Random rubble masonry in cement mortar 1:6(1 cement : 6 sand) complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.including all leads and lifts, or as per HPPWD,. Specification of 1990 Volume-I, asdirected by the Engineer-In-Charge. | - | Per Cum | - | - |
| 5 | Construction of dry rubble masonary for retaining walls, breast walls,revetment walls and parapets etc. for sub-structure and super structure complete as per drawing and technical specification clauses 704.6 & 1302.5 including all leads and lifts, as per HPPWD, specification of 1990 volume-I as directed by the Engineer-In-Charge | - | Per Cum | - | - |
| 6 | Backfilling with Granular material behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge | - | Per Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
SBDNEW.pdf
Tender Documents • 5.02 MB
BOQ_199241.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid