Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.6 LAdmitted-Finance BASGO | -51.12% | ₹40.6 L | L1 | Admitted-Finance |
| 2 | L2₹44.8 LAdmitted-Finance | -46.10% | ₹44.8 L | L2 | Admitted-Finance |
| 3 | L3₹46.4 LAdmitted-Finance | -44.25% | ₹46.4 L | L3 | Admitted-Finance |
| 4 | L4₹46.9 LAdmitted-Finance R O BOGDANG | -43.55% | ₹46.9 L | L4 | Admitted-Finance |
| 5 | L5₹47.7 LAdmitted-Finance CHUCHOT SHAMMA LEH | -42.60% | ₹47.7 L | L5 | Admitted-Finance |
Tender Value
₹83.1 L
EMD Value
₹2.0 L
Closing Date
10 Feb 2026, 4:00 pmClosed
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Restoration/resurfacing of Tegar Sakti road.(Under District Plan)
2026_PWD_18392_1
163 of CDL Leh of 2025-26
Open Tender
Civil Works - Roads
120 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer Construction Division Leh
₹2.0 L
2 Mar 2026
21 Jan 2026
11 Feb 2026
22 Jan 2026
10 Feb 2026
22 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains( not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, liftup to1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Dumping stone including cost of stones. in Horizontal on level
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12(1 cement :6 coarses and: 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
Dry random rubble masonry with hard stone in foundation and plinth: With bond stone.
Providing and laying of MS Pipe 300mm dia for coss drainage including trench cutting laying the pipe in proper position refilling the excavated earth and disposal of surplus excavated earth all complete job.
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) ncluding manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 25% : 4 graded stone aggregate 20mm nominal size including (Recycled Concrete Aggregate (RCA) upto 25%))
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Carriage of material from source to site by M.T including loading, unloading and stacking complete job a) Cement an average lead of 40km
b) Sand an avg lead of 10km
c) Aggregate an avg lead of 10km
d) Stone Boulder an avg lead of 10km
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_44261.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid