| Sl No | Description | Qty | Unit | DHANALAKSHMI L3 | Ellappan contractor L2 | K.B.Prakasam L1 |
|---|---|---|---|---|---|---|
| 1.00Part II : Providing Colour Washing and Platform Works to 60000 lit OHT at Mettucolony in Kalvoy Panchayat Est: 1.75 Lakhs | ||||||
| 2.00 | Chipping in the RCC area including all labour Charges etc. | 8.51 | Sqm | 44 ₹374.44 | 43 ₹365.93 | 40 ₹340.4 |
| 3.00 | Plastering with CM 1:5 12mm thick including all labour Charges etc. | 8.51 | Sqm | 283 ₹2,408.33 | 282 ₹2,399.82 | 280 ₹2,382.8 |
| 4.00 | Chipping in the RCC area including all labour Charges etc. | 19.57 | Sqm | 45 ₹880.65 | 43 ₹841.51 | 40 ₹782.8 |
| 5.00 | Plastering with CM 1:3 10mm thick including all labour Charges etc. | 20.04 | Sqm | 330 ₹6,613.2 | 325 ₹6,513 | 300 ₹6,012 |
| 6.00 | Supply and fixing of 65mm dia GI pipe etc complete. | 12 | Rm | 610 ₹7,320 | 605 ₹7,260 | 600 ₹7,200 |
| 7.00 | Supplying and painting the walls with two coats of cement paint over one coat of cement primer as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work). | 201.09 | Sqm | 263 ₹52,886.67 | 262 ₹52,685.58 | 250 ₹50,272.5 |
| 8.00 | Providing OHT GI Pipe painting including cost of materials and labour charges etc. | 3.3 | Rm | 154 ₹508.2 | 153 ₹504.9 | 153 ₹504.9 |
| 9.00 | Providing OHT MS Ladder painting including cost of materials and labour charges etc | 2.87 | Each | 7,000 ₹20,090 | 6,000 ₹17,220 | 5,000 ₹14,350 |
| 10.00 | Providing Polymer coating (water proof coating) for Over Head tank bottom with following specification and the surface shall be cleaned to remove all dust, foregin,matters lose material or any other deposits of contamination by rubbing with wire brush etc complete. | 29.41 | Sqm | 1,548 ₹45,526.68 | 1,548 ₹45,526.68 | 1,500 ₹44,115 |
Tender Value
₹1.8 L
EMD Value
₹1,800
Closing Date
27 Feb 2026, 3:00 pmClosed
BDO VP
The BDO VP
Providing Rural Building Maintanace works to Kalvoy Panchayat 1 no Having Package no 05/2025 -26 in Kattankolathur Panchayat Union
2026_RDTN_666019_1
RC No 2442/2025/A2 dt 20.02.26
Open Tender
Civil Works - Buildings
90 days
BDO KTR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,800
Yes
6 May 2026
25 Feb 2026
27 Feb 2026
25 Feb 2026
27 Feb 2026
25 Feb 2026
Part II : Providing Colour Washing and Platform Works to 60000 lit OHT at Mettucolony in Kalvoy Panchayat Est: 1.75 Lakhs
Chipping in the RCC area including all labour Charges etc.
Plastering with CM 1:5 12mm thick including all labour Charges etc.
Chipping in the RCC area including all labour Charges etc.
Plastering with CM 1:3 10mm thick including all labour Charges etc.
Supply and fixing of 65mm dia GI pipe etc complete.
Supplying and painting the walls with two coats of cement paint over one coat of cement primer as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work).
Providing OHT GI Pipe painting including cost of materials and labour charges etc.
Providing OHT MS Ladder painting including cost of materials and labour charges etc
Providing Polymer coating (water proof coating) for Over Head tank bottom with following specification and the surface shall be cleaned to remove all dust, foregin,matters lose material or any other deposits of contamination by rubbing with wire brush etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}12%
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_799988.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_799988.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid