Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC | ₹16.3 L | L1 | Accepted-AOC lowest |
Tender Value
₹14.4 L
EMD Value
₹28,772
Closing Date
16 Dec 2019, 3:30 pmClosed
Executive Engineer IPH
The Executive Engineer Irrigation and Public Health Division PWD Karaikal
Construction of 1.50 Lakh litre capacity OHT, 1.00 Lakh litre capacity Sump, Pump ouse Compound wall and allied works at Nallambal village in Thirunallar Commune, Karaikal SW- Erection of Deep Bore Well at Nallambal
2019_PWDC3_5356_1
13-01/IPH/TN/2019-20
Open Tender
Civil Works
Item Rate
60 days
Nallambal
Please refer Tender documents.
4 documents required · 4 mandatory
₹525
as per NIT
₹28,772
20 Feb 2020
6 Dec 2019
17 Dec 2019
6 Dec 2019
16 Dec 2019
6 Dec 2019
Amount
Drilling of borewell any where in Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -Upto 60 mts depth ending below ground level.
Drilling of borewell any where in Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. - From 60mts and upto 90 mts. depth ending below ground level.
Drilling of borewell any where in Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. - From 90mts and upto 120 mts. depth ending below ground level.
Drilling of borewell any where in Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 120mts and upto 150 mts. depth ending below ground level.
Drilling of borewell any where in Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 150mts and upto 180 mts. depth ending below ground level.
Drilling of borewell any where in Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 180mts and upto 210 mts. depth ending below ground level.
Drilling of borewell any where in Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 210mts and upto 240 mts. depth ending below ground level.
Drilling of borewell any where in Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 240mts and upto 270 mts. depth ending below ground level.
Drilling of borewell any where in Pondicherry including tranportation in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 270mts and upto 300 mts. depth ending below ground level
Reaming from 200 mm dia pilot bore to 350mm dia bore. Upto 60 mts depth ending below ground level
Reaming from 200mm dia pilot bore to 350mm dia bore. From 60 mts and upto 90 mts depth ending below ground level
Reaming from 200mm dia pilot bore to 350mm dia bore. From 90 mts and upto 120 mts depth ending below ground level
Reaming from 200mm dia pilot bore to 350mm dia bore. From 120mts and upto 150 mts depth ending below ground level
Reaming from 200mm dia pilot bore to 350mm dia bore.From 150 mts and upto 180 mts depth ending from ground level
Reaming from 200mm dia pilot bore to 350mm dia bore.From 180 mts and upto 210 mts depth ending from ground level
Reaming from 200mm dia pilot bore to 350mm dia bore.From 210 mts and upto 240 mts depth ending from ground level.
Reaming from 200mm dia pilot bore to 350mm dia bore.From 240 mts and upto 270 mts depth ending from ground level.
Reaming from 200mm dia pilot bore to 350mm dia bore.From 270 mts and upto 300 mts depth ending from ground level.
Reaming from 300 mm dia pilot bore to 400/450mm dia. Upto 60 mts depth ending below ground level.
Reaming from 300mm dia pilot bore to 400/450mm dia bore. From 60 mts and upto 90 mts depth ending below ground level
Reaming from 300mm dia pilot bore to 400/450mm dia bore. From 90 mts and upto 120 mts depth ending below ground level
Reaming from 300mm dia pilot bore to 400/450mm dia bore. From 120 mts and upto 150 mts depth ending below ground level
Reaming from 300mm dia pilot bore to 400/450mm dia bore .From 150 mts and upto180 mts depth ending below ground level
Reaming from 300mm dia pilot bore to 400/450mm dia bore .From 180 mts and upto 210 mts depth ending below ground level
Reaming from 300mm dia pilot bore to 400/450mm dia bore.From 210 mts and upto240 mts depth ending below ground level.
Reaming from 300mm dia pilot bore to 400/450mm dia bore.From 240 mts and upto270 mts depth ending below ground level.
Reaming from 300mm dia pilot bore to 400/450mm dia bore.From 270 mts and upto300 mts depth ending below ground level.
Charges for developing the borewells with air compressor of 600 CFM capacity (minimum 8 hours) including transportation labour and fuel charges for compressor and conducting yield test by"V" Notch methods.
Supplying transportation and packing of 8mm size down gauge graded pebbles including filling the annular space gradually complete. The pebbles should be free from any disintegrated pieces.
Supplying,transporting and packing of clay balls including filling the annular space gradually complete.The clay balls should be free from any sand particles.
Providing and fixing M.S. top cover suitable for UPVC pipes including the cost of materials and labour etc.
Providing and fixing of UPVC End Cap embedded in M.S. Cone suitable for UPVC casing pipe including the cost of materials and labour for jointing.
Supplying and fixing of MS centering guide of size 25mm x 3mm thickness suitable for UPVC pipe including the cost of materials but excluding the cost of labour for positioning the assembly for lowering purpose using contractors rig excluding the hire charges thereof - 200mm dia.
Supplying and lowering of UPVC 200mm dia plain casing pipe confirming to IS 12818-1992 with relevant amendments with class designation CM and with minimum wall thickness of 13.00mm to 14.20mm as per I.S code into the bore well with proper vertical alignments etc., including the cost of materials, but excluding the cost of labour for positioning the assembly for lowering purpose using contractor's rig excluding the hire charges thereof (out side dia 226.00mm to 228.40mm)
Supplying and lowering of UPVC 200mm dia ribbed screen pipe confirming to IS 12818-1992 with relevant amendments with class designation RS and with minimum wall thickness of 13.00mm to 14.20mm as per I.S code into the bore well with proper vertical alignments etc., including the cost of materials, but excluding the cost of labour for positioning the assembly for lowering purpose using contractor's rig excluding the hire charges thereof (out side dia 226.00mm to 228.40mm)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .