Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹2.9 Cr+₹1.6 L (0.56%)Rejected-AOC | L2 | Rejected-AOC Accepted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-M/s SHIV SUNDER CONSTRUCTION & CONSULTANTS PVT LTD letter Dated-26-09-2025, Said I don't want to not Participate in tender. |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
26 Sept 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager, Zone-7, Lucknow
General Manager, Zone-7, U.P. Projects Corporation Ltd. Lucknow. Gomti Barrage, Left Bank, Gomti Nagar Lucknow.
Construction of Morden workshop, Training room etc. at Govt. I.T.I. Atrauli District-Hardoi (U.P.)
2025_UPPRC_1074023_2
43/UPPCL/GM-7/E-TENDER/2025-26 Dated-12.09.2025
Open Tender
Civil Works - Buildings
Percentage
180 days
Atrauli District-Hardoi (U.P.)
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹5.8 L
3 Dec 2025
19 Sept 2025
26 Sept 2025
19 Sept 2025
26 Sept 2025
19 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Morden workshop, Training room etc. at Govt. I.T.I. Atrauli District-Hardoi (U.P.) | - | - | - | - |
| 2 | CIVIL WORKS | - | - | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. | 370.25 | CUM | 123.94 | ₹45,888.78 |
| 4 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 912.56 | CUM | 489.12 | ₹4,46,351.35 |
| 5 | Supply and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 142.83 | CUM | 1,482.91 | ₹2,11,804.04 |
| 6 | Providing and injecting chemical emulsion for preconstruction ant termite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (3) Treatment of top surface of plinth filling 5 liters/sqm . | 983.96 | SQM | 216.49 | ₹2,13,017.5 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 121.32 | CUM | 4,756.48 | ₹5,77,056.15 |
| 8 | Providing and laying in position machine battched and machine mixed design mix M- 25 grade cement concrete for RCC work using cement content as per approved design mix. Including pumping of concrete to site of laying but including the cost of centreing, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS 9103 to accelerate, retard setting of concrete, improve workability without impaaining strenght and durability as per direction of Engineer - In - Charge | - | - | - | - |
| 9 | All works upto plinth level | - | - | - | - |
| 10 | Footing | 80.57 | Cum. | 6,636.69 | ₹5,34,718.11 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_1963455.xls
BOQ • 0.75 MB
BIDDOC43.pdf
Tender Documents • 24.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .