| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L | L1 | Accepted-AOC BEING L1 |
| 2 | L2₹8.7 L+₹17,024.22 (2.00%)Rejected-Finance | ₹8.7 L+₹17,024.22 (2.00%) | L2 | Rejected-Finance BEING L2 |
| 3 | L3₹8.7 L+₹22,471.98 (2.64%)Rejected-Finance | ₹8.7 L+₹22,471.98 (2.64%) | L3 | Rejected-Finance BEING L3 |
Tender Value
₹8.5 L
EMD Value
₹17,024
Closing Date
11 Feb 2026, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer Metropolitan Drainage Mechanical Division Jalasampad Bhawan (4th floor) Salt Lake City, Kolkata-700091
The Fabrication supply storing at site installation commissioning of trashrack bar screen grating repairing of MS Bar screen parrallel gratting for new grating including Painting of gratings of inlet at Additional Chowbaga Pumping Stati
2026_IWD_993254_17
WBIW/EE/MDMD/e-NIT-20/2025-26
Open Tender
MECHANICAL
Percentage
Chowbhaga
Please refer Tender documents.
5 documents required · 5 mandatory
₹17,024
10 Sept 2026
23 Jan 2026
12 Feb 2026
23 Jan 2026
11 Feb 2026
23 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lifting/lowering the displaced/damaged/normal inlet trashrack/bar screen/gratings (up to 3 nos./pump bay ) from intake channel pier grooves by Tripod, Chain pulley Block, rope etc. and stacking the same in suitable place at site as per direction. | 20 | p/ bay | 5,043.7 | ₹1,00,874 |
| 2Fabrication , supply, erection and commissioning of embeded parts consisting of seal beam, Guide channel with all accessories for vertical gate of canal/river made of MS material consisting of angle, channel, beam, plate, flat, etc. conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction including cost of Materials, Machinaries , Manpower, Cutting, Aligning, Anchoring, Welding, Finishing, Consumables, Carriage and all overheads with all leads and lifts complete as per specification (without painting). Remarks: Cost for civil works to be taken from PWD (R) directorate seperatly | |||||
| 2.01 | Guide channel/Guide path/Top seal path | 422.99 | kg | 170.43 | ₹72,090.19 |
| 3 | Fabrication, supply, storing at site, installation & commissioning of trashrack/ bar screen/ grating conformong to relevent IS codes (IS:11388, IS:800, IS:2062) fabricated with structural steel sections such as ms flat, channels, angles etc. including cost of materials, machinary, labour, cutting, aliging, welding as per approved drawing including transportation charges as per direction. | 1,455.08 | kg | 151.36 | ₹2,20,240.91 |
| 4Supply & fitting fixing of round strand (steel core/fibre core) steel wire rope (ungalvanised, IWRC) of 6x36 construction of 1960 tensile designation as per IS-2266 (make: Usha Martin, Bharat Wire Ropes ltd or BIS approved makes), rope clamp with Dishakle and fitting fixing of said material with correct alignment and position inclusive of all cost of labour, T&P, scaffolding charges & all other incidental charges as necessary to complete the job in all respect upto the satisfaction of E.I.C. | |||||
| 4.01 | e) 16 mm dia (steel core) | 20 | RM | 389.72 | ₹7,794.4 |
| 5 | Supplying of MS bolt with nut as per direction of EIC | 2 | kg | 119.18 | ₹238.36 |
| 6 | Supply of Rope clamp | 4 | each | 216.91 | ₹867.64 |
| 7 | Surface cleaning of metal surfaces by chemical cleaners and then by hand with emary paper, wire brush and power tool cleaners and removing dust and preparation of surface including cost of all materials, labour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts. | 800.06 | sqm | 76.28 | ₹61,028.58 |
| 8 | Painting of embedded parts, all types of gates, stoplogs and barscreen/gratings etc on prepared surfaces with one coat of inorganic zinc silicate (airless spray preferred)70+/ - 5 micron and two super coats with a total thickness of 300 microns (each 150+/- 5) of solventless coaltar epoxy paint each coat 150 microns ( total 300 microns) including cost of all materials, labour, scaffolding etc., complete with all leads and all lifts. | 800.06 | sqm | 485.06 | ₹3,88,077.1 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.72 MB
BOQ_2429451.xls
BOQ • 0.29 MB
2911i.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .