Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.4 L+₹10,867.54 (4.67%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.5 L+₹12,250.68 (5.26%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.5 L+₹13,791.90 (5.93%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.5 L+₹16,202.51 (6.96%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹4.0 L
EMD Value
₹7,900
Closing Date
18 Jul 2026, 4:00 pmClosed
XEN REW KATHUA
XEN REW KATHUA
Constt. Of road by way of Shingling alongwith drain from H/o Hukam Chand to the H/o Hans Raj, W. No. 03, Pyt. Dharamkote , Block Billawar.
2026_RDPR_315421_11
e-NIT No.97/REW/K of 2026-27 Dated 10/07/2026
Open Tender
Civil Works
Percentage
90 days
BILLAWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹7,900
6 Aug 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge.
All kinds of soil | 180 | cum | 187.3 | ₹33,714 |
| 2 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters | 99.75 | sqm | 153 | ₹15,261.75 |
| 3 | Supplying and stacking at site stone aggregate45to 63mm range | 74.81 | cum | 1,204.15 | ₹90,082.46 |
| 4 | Supply and stacking at site stone screeining | 11.96 | cum | 1,204.15 | ₹14,401.63 |
| 5 | Supply and stacking at site crusher dust | 5.98 | cum | 770 | ₹4,604.6 |
| 6 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required densi | 74.81 | cum | 718.15 | ₹53,724.8 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:(1:5:10) | 3.2 | cum | 4,826.5 | ₹15,444.8 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) using 20% boulders | 21.96 | cum | 4,774.46 | ₹1,04,837.59 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form forFoundation | 73.2 | sqm | 286.35 | ₹20,960.82 |
| 10 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 27.45 | sqm | 346.7 | ₹9,516.91 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.93 MB
BOQ_1023342.xls
BOQ • 0.29 MB
CORR97.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .