| 1 | L1₹3.2 CrAccepted-AOC AT KALIDASPUR PO BALIMED PS NAIKANIDIHI DIST BHADRAK PIN 756131 | BHADRAK | ODISHA | 756131 | ₹3.2 Cr | L1 | Accepted-AOC Agmt drawn |
| 2 | L2₹3.7 CrRejected-Finance | ₹3.7 Cr | L2 | Rejected-Finance Unsucessful bidder |
| 3 | L2₹3.7 CrRejected-Finance AL NUAGAON GP BADAMBILA PO NAMAUZA PS AUL DIST KENDRAPARA PIN 754231 | KENDRAPARA | ODISHA | 754231 | ₹3.7 Cr | L2 | Rejected-Finance Unsucessful bidder |
| 4 | L2₹3.7 CrRejected-Finance AT P O BALI P S GURUDUHATIA DIST CUTTACK PIN 754295 | BALI | CUTTACK | ODISHA | 754295 | ₹3.7 Cr | L2 | Rejected-Finance Unsucessful bidder |
| 5 | L2₹3.7 CrRejected-Finance AT KALIDASPUR PO BALIMED PS NAIKANIDIHI DIST BHADRAK PIN 756131 | BHADRAK | ODISHA | 756131 | ₹3.7 Cr | L2 | Rejected-Finance Unsucessful bidder |
Tender Value
₹3.7 Cr
EMD Value
₹3.7 L
Closing Date
19 Dec 2025, 5:00 pmClosed
C.C.E.R.W. Circle Cuttack
C.C.E.R.W. Circle Cuttack
Construction of Bridge over river Gobari at 1.200km on Benupur-Kulapatasara road in the District of Jagatsinghpur under SBY for the year 2024-25
2025_CERWI_122944_1
Tender Online RWC-25-25
National Competitive Bid
Civil Works - Bridges
360 days
Jagatsinghpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹3.7 L
Yes
6 Jun 2026
10 Dec 2025
20 Dec 2025
10 Dec 2025
19 Dec 2025
10 Dec 2025
10 Dec 2025 - 19 Dec 2025
Earthwork in excavation in cutting in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge.
Earth work excavation in foundation in all knds of soil within all leads and lifts including shoring, shuttering, propping bullahs, piling, dewatering from the foundation, supply & working of pumps stacking the excavated material away from the work in site.
Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge.
Cement concrete (1:3:6) in foundation & plinth with 4cm. crusher broken granite metal of approved quality from approved quarry including hoisting lowering & laying in layers not exceeding 150mm. thick with proper packing & ramming each layer of concrete by means of vibrator ,providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation & direction of the Engineer-in Charge .
In Foundation
Below Approach Slab
Cement concrete of M-150 having maximum compressive strength of 150 kg./cm2 ( test to be conducted) on 150 mm. cubes tested at 28 days including curing (tests conducted in accordance with IS-456 & IS-516) & conforming to clause-302 of IRC 21/1987 using clean crusher broken hard granite coarse aggregate of 40 mm. size down grade of approved quality to be protested in the laboratory) obtained from approved quarry the proportion mix, grading conforming to relevant ISI/IRC codes including hoisting, lowering concrete in layers not exceeding 150 mm. thick each compacting with vibrator watering & curing for 28 days centering shuttering & finishing the exposed surface smooth providing grooves & beads where necessary including cost, conveyance royality & taxes of all labour machineries etc. required for the work complete in all respects including dismantling the centering & shuttering as per specification & direction of Engineer-in-Charge. In foundation
In Sub-Structure
In Foundation
RCC of design mix of M-300grade having specified characteristics compressive strength/ target mean strength of 250kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in & form works finishing the exposed surface smooth providing beads & grooves wherever necessary including cost, conveyance royalties and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge but excluding cost, conveyance of tor steel & binding wire & labour charges for straightening, cutting, bending, binding welding & tying the grills lapping spacing etc. where ever necessary & hoisting & placing in position ( to be paid separately as required for RCC works)
Foundation
Abutment & Pier Shaft
Pier & Abutment Cap
DIRT Wall
Approach Slab
Retaining Wall
Wearing Course Mastic Asphalt
RCC of design mix of M-250grade having specified characteristics compressive strength/ target mean strength of 250kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in accordance with relevant clauses of IS 456/IS 516/IRC 216/1987/IRC-78/1983 using crusher broken hard granite course aggregate of 20mm. down graded.sizes & proportion as specified in clause-302.6.2 of IRC 21/1987 & IS-10262 & subject to mix design in conformity with the grading & proportion of different materials for concrete as specified in the relevant codes of approved quality, obtained from approved quarry & using minimum quantity of cement confirming to codal provision including hoisting, lowering & laying concrete in layers not exceeding 15cm thick compacting with vibrators watering & curing for 28 days including water tight steel centering , shuttering & form works finishing the exposed surface smooth providing beads & grooves wherever necessary including cost, conveyance royalties and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge but excluding cost, conveyance of tor steel & binding wire & labour charges for straightening, cutting, bending, binding welding & tying the grills lapping spacing etc. where ever necessary & hoisting & placing in position ( to be paid separately as required for RCC works)
Deck Slab
Railing & Post
Providing TMT bars confirming to approved grade F-415 including all labours for cutting ,bending, binding, lapping, splicing, welding etc. (conforming to ISI specification) & jointing if necessary by lapping & tying the grills & placing in position as required for RCC works as per the approved design, hoisting, lowering & laying position including cost & conveyance of tor steel & binding wires of 18 to 20 gauge (as to be approved by the Deptt.) etc. complete with Cess in all respect (weight of binding wire shall not be considered for payment at all which will be borne by the contractor) as per specification and direction of the Engineer in charge.
Providing and laying of Filter media with stone crushed aggregates of 45mm size satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfact behind abutment,wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification & direction of Engineer-in Charge.
Providing weep hole in plan / Reinforced concrete abutment, wing wall / retaining wall with 100mm dia A.C. Pipe, extending through the full width of the structure with slope of 1V : 20 H towards drawing face complete as per drawing and technical specification and direction of Engineer in charge.
Providing Rough stone dry packing / pitching in slope, protection walls, approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying conveying and cost conveyance taxes royalty of all materials including T&P complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level as per direction of the Engineer – in – charge including dewatering if required.
Supplying & filling behind abutment, wing wall and return wall etc with approved quality of gravel / sandy material including watering to complete saturation & ramming complete with all leads & lifts including cost. Conveyance royality & taxes of all materials & cost of all labour & T&P required for the work complete ( measurement will be taken for compacted section as per direction of Engineer-in-Charge.)
Gravel Backing
Sandy Material
Supplying and fixing of RCC Guard post of 150 mm dia and IM long in RCC (1:2:4) using 20mm down graded size h.g chips including all labours, materials ,carriage ,royality & taxes of etc. complete.
Providing , fitting , fixing expansion joint confirming to ISI specification including all cost , carriage , taxes etc complete as per specification & direction of Engineer-in-Charge .
Strip seal Expansion Joint
Salitax Board
Providing, fitting & fixing of Draiange spout etc
Providing Fix of Tar Paper
Providing and applying two coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescense and applying paint @ 1 litre per 02 Sqm
Construction of embankment with approved material obtained from borrow pits with 5 extra lead lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge.
Loosening of the ground up to a level of 500mm below the sub-grade level , watered , graded & compacted in layers to meet requirement of table 300-2 for sub-grade construction & clause 305 of MORTH specification of Road & Bridge works ( 4th Revision )
Construction of granular sub-base by providing Close graded Granular subbase Grading-III material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (4th Revision)
Providing, laying, spreading & compacting graded stone aggregate to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoSRT & H specifications for road & bridge works.(4th Revision)
Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Technical Specification Clause 502 of MOSRT&H including cost, conveyance, royalty, taxes of chips and bitumen & other required materials etc. complete and as per direction of Engineer-In-Charge.
Providing and applying Tack coat with bitumen emulsion on prepared surface including clearing of road surfaces and spraying primer @ 0.20kg/ sqm using Mechanical means as per clause 502 of MoSRT&H Specifications of Road & Bridge work (04th Revision)
Providin & laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over previously prepared surface with hydrostatic paver finisher with sensore control to the required grade, level & alingment & roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 504 of MoSRT&H Specifications for road and bridge works (4th Revision) Page-169 Item -45
Providing & laying Semi Dense Bituminous Concrete with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to site, laying with a hydrostatic paver finisher with sensore control to the required grade, level & alingment, roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 508 of MoSRT&H Specifications for road and bridge works (4th Revision) Page -175 item - 47
Fine dressing and turfing with best dub grass with five extra leads over the initial lead and lift etc. complete and as per the direction of Engineer in Charge.
Supplying, fixing and laying R.C.C. Hume pipes of NP3 class(confirming to relevant IS specification) for culverts including fixing collar with cement mortar 1:3 including cost, conveyance, royality of all materials, labour charges, T&P etc. required for the work complete as per specification and direction of Engineer-in-charge.
1000mm dia HP
Providing Fix of SBY Information Sign Board
stage.html
html • 0.13 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.40 MB
Tendernotice_2.pdf
PDF • 4.64 MB
BOQ_571025.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid