Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC AT KATHARA P O KATHARA BOKARO JHARKHAND 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | L1 | Accepted-AOC All documents submitted and found O.K. Comparative lower rate. | |
| 2 | Rejected-Technical AT AND PO KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | - | Rejected-Technical L3 Bidder | |
| 3 | Rejected-Technical AT KATHARA PO KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | - | Rejected-Technical L2 Bidder |
Tender Value
₹2.4 L
EMD Value
₹3,000
Closing Date
26 Jan 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Amit,Dy. Manager(CP), Sawang Washery, Kathara Area
Office of the Project Officer, Sawang Washery
Repairing / rewinding of different types and different capacity of induction motors, Volt-550/415, 3 Phase, (i) 85 BHP, RPM-1475, Sl. No. WNP, (ii) 75 KW, RPM-1480, Sl. No. WNP, (iii) 9 KW, RPM-1460, Sl. No. WNP at Sawang Washery.
2024_CCL_298630_1
SGW/KTA/ENM/E-Tender/23-24/115 Date 15.01.2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Office of the Project Officer, Sawang Washery
Please refer Tender documents.
9 documents required · 9 mandatory
₹3,000
12 Feb 2024
15 Jan 2024
27 Jan 2024
17 Jan 2024
26 Jan 2024
17 Jan 2024
17 Jan 2024 - 23 Jan 2024
Amount
A. 85 BHP, RPM-1475 induction motor i) Super enamel copper wire SWG-15, 16 no. (Total wire 107 Kg. - Less Scrap value 60% = 42.8 Kg.
(ii) Insulation cost 15% of total wire 107 Kg.
(iii) Labour Charge 15% of total wire 107 Kg.
(iv) Heat proof terminal lead
v) Copper lugs
Contractor Profit
B. 75 KW, RPM-1480 induction motor i) Super enamel copper wire SWG-16, 17 no. (Total wire 112 Kg. - Less Scrap value 60% = 45 Kg.
(ii) Insulation cost 15% of total wire 112 Kg.
(iii) Labour Charge 15% of total wire 112 Kg.
(iv) Heat proof terminal lead
v) Copper lugs
Contractor Profit
C. 9 KW, RPM-1460 induction motor i) Super enamel copper wire SWG-19 (Total wire 15 Kg. - Less Scrap value 60% = 6 Kg.
(ii) Insulation cost 15% of total wire 15 Kg.
(iii) Labour Charge 15% of total wire 15 Kg.
Contractor Profit
Total impact of GST for the purpose of CTC
M/S SHYAM ELECTRICALS
M/S LAXMI ENTERPRISES
techsummary_309330.pdf
PDF • 1.00 MB
finsummary_309330.pdf
PDF • 1.00 MB
Award115.pdf
PDF • 1.72 MB
finance_309330.pdf
PDF • 0.23 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .